Planning application
Letchworth Cricket Club Whitethorn Lane Letchworth Garden City Hertfordshire
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Relocation and installation of 4 bay lane enclosed facility following removal of existing 2 bay practice net facility.
As published by the council, reference 26/02343/FP
Application record
- Reference
- 26/02343/FP
- Category
- Full applications
- Status
- Registered
- Received
- 8 Oct 2026
- Validated
- 8 Oct 2026
Timeline
Dates from the published record
-
8 Oct 2026
Received by North Hertfordshire
-
9 Oct 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 3 December 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
North Hertfordshire took a median of 48 days over the applications it decided in the last year.
What happens while it is decided
This application is with North Hertfordshire for determination, against a statutory target of eight weeks. Over the last year North Hertfordshire decided full applications in a median of 67 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In North Hertfordshire
-
26/00298/FP Decided
Hobbs Close Garage London Road St Ippolyts Hitchin Hertfordshire SG4 7NJ
Erection of one detached 4-bed dwelling following demolition of existing garage building as revision of previously approved planning permission 21/00298/FP granted 26.03.2021.
-
26/01022/FP Awaiting decision
Service Station Bedford Road Hitchin Hertfordshire SG5 2UG
Installation of parcel lockers following removal of existing locker and installation of paved pathway.
-
26/02400/FP Awaiting decision
Greenbanks London Road St Ippolyts Hitchin Hertfordshire SG4 7NJ
Erection of four dwellings including cycle storage, parking, hard and soft landscaping, and alterations to access layout following demolition of existing dwelling and other buildings.
-
26/02392/FP Awaiting decision
Land South Of 14 High Street Graveley Hertfordshire SG4 7LB
Erection of one detached self-build dwelling including parking, cycle store, bin store, Air Source Heat Pump, alterations to ground levels and soft and hard landscaping.
-
26/01937/FP Decided
Hitchin Town Hall Brand Street Hitchin Hertfordshire SG5 1HX
Decarbonisation works including provision of secondary glazing to existing windows, the provision of insulation to the roof void above the main hall, replacement of mechanical plant including the removal of gas boilers and the installation of Photovoltaic (PV) panels and Air Source Heat Pump (ASHP)