Planning application
Dog Kennel Farm, Charlton Road, Hitchin, SG5 2AB
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Erection of agricultural building to provide winter housing for livestock
As published by the council, reference 17/02545/1AG
Application record
- Reference
- 17/02545/1AG
- Type
- Full Planning Permission
- Status
- Awaiting decision
- Received
- 12 Oct 2017
- Validated
- 12 Oct 2017
- Ward
- Hitchin Priory Ward
- Parish
- Hitchin
- Postcode
- SG5 2AB
Timeline
Dates from the published record
-
12 Oct 2017
Received by North Hertfordshire
-
9 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 7 December 2017, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
North Hertfordshire took a median of 48 days over the applications it decided in the last year.
What happens while it is decided
This application is with North Hertfordshire for determination, against a statutory target of eight weeks. Over the last year North Hertfordshire decided full applications in a median of 67 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Charlton House Charlton Road Hitchin SG5 2AB
To reduce and thin the crown of two Fagus sylvatica 'Purpurea' (Copper Beech) by 25%
Granted Trees 1 doc -
14 Cranborne Avenue Hitchin Hertfordshire SG5 2BS
Development A - Single storey rear extension. Development B - Part single, part two storey front extension, conversion of garage, and insertion of first floor side facing window.
Split decision Householder Extension Windows or glazing 18 docsSmall domestic -
Charlton House Charlton Road Hitchin Hertfordshire SG5 2AB
G1 x3 Hornbeam - Cut back from cricket nets. T2 Holly - Reduce by 2m
Granted Trees 4 docs -
53 Hawthorn Close Hitchin Hertfordshire SG5 2BP
Single storey rear extension and insertion of no.2 rooflights to existing rear elevation roofslope
Granted Householder Extension Loft or dormer 6 docsSmall domestic -
28 The Ridgeway Hitchin Hertfordshire SG5 2BT
Part single and part two storey front and side extension to include an attached garage, insertion of front and rear dormer windows to existing roofslopes, and render finish applied to front elevation brickwork following demolition of existing detached garage
Granted Householder Extension Loft or dormer +2 8 docsDomestic -
27 The Ridgeway Hitchin Hertfordshire SG5 2BT
Two storey side extension and single storey rear extensions following demolition of existing garage.
Granted Householder Extension DemolitionSmall domestic
Other full applications
In North Hertfordshire
-
26/00298/FP Decided
Hobbs Close Garage London Road St Ippolyts Hitchin Hertfordshire SG4 7NJ
Erection of one detached 4-bed dwelling following demolition of existing garage building as revision of previously approved planning permission 21/00298/FP granted 26.03.2021.
-
26/01022/FP Awaiting decision
Service Station Bedford Road Hitchin Hertfordshire SG5 2UG
Installation of parcel lockers following removal of existing locker and installation of paved pathway.
-
26/02400/FP Awaiting decision
Greenbanks London Road St Ippolyts Hitchin Hertfordshire SG4 7NJ
Erection of four dwellings including cycle storage, parking, hard and soft landscaping, and alterations to access layout following demolition of existing dwelling and other buildings.
-
26/02392/FP Awaiting decision
Land South Of 14 High Street Graveley Hertfordshire SG4 7LB
Erection of one detached self-build dwelling including parking, cycle store, bin store, Air Source Heat Pump, alterations to ground levels and soft and hard landscaping.
-
26/01937/FP Decided
Hitchin Town Hall Brand Street Hitchin Hertfordshire SG5 1HX
Decarbonisation works including provision of secondary glazing to existing windows, the provision of insulation to the roof void above the main hall, replacement of mechanical plant including the removal of gas boilers and the installation of Photovoltaic (PV) panels and Air Source Heat Pump (ASHP)