Planning application
38-39 Bancroft Hitchin SG5 1LA
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Installation of satellite dish on rear elevation
As published by the council, reference 02/01396/1
Application record
- Reference
- 02/01396/1
- Type
- Full Planning Permission
- Status
- Decided
- Decision
- Granted As published: Conditional Permission
- Received
- 12 Sep 2002
- Validated
- 12 Sep 2002
- Decided
- 5 Nov 2002
- Ward
- Hitchin Priory Ward
- Parish
- Hitchin
- Decision by
- Delegated
- Postcode
- SG5 1LA
Timeline
Dates from the published record
-
12 Sep 2002
Received by North Hertfordshire
-
5 Nov 2002
Decision issued: Conditional Permission
-
28 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
Documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
North Hertfordshire granted permission on 5 November 2002, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Apartment 1 42 Bancroft Hitchin Hertfordshire SG5 1LA
98% historically approved · decision due ~14 Dec
Pear - Remove.
Awaiting decision Trees -
30 Bancroft Hitchin Hertfordshire SG5 1LA
96% historically approved · decision due ~13 Aug
Proposed Replacement of Timber Cladding to Dormer Cheeks with Code 6 Lead
Awaiting decision Heritage and listed buildings Loft or dormer -
32 Bancroft Hitchin Hertfordshire SG5 1LA
Replacement of existing timber weatherboarding with Cedral fibre cement weatherboarding
Granted Heritage and listed buildings 7 docs -
Units 1 - 5 Rear Of 93-95 Bancroft Hitchin Hertfordshire SG5 1NQ
Single storey extension to existing east elevation.
Decided Full applications ExtensionSmall domestic -
71 Bancroft Hitchin Hertfordshire SG5 1NJ
T1, T2 Ash - Reduce to previous points. T3 Willow - Re pollard. T4 Sycamore - Reduce to previous points. T5 Willow - Re pollard to previous points. T6 Silver birch - Re shape
Granted Trees 6 docs -
93A Bancroft Hitchin Hertfordshire SG5 1NQ
96% historically approved · decision due ~2 Oct
Part demolition of internal side wall and removal of door and window to create an open space area and removal of rear bi-fold door.
Awaiting decision Heritage and listed buildings Demolition Windows or glazing 4 docs
Other full applications
In North Hertfordshire
-
26/00298/FP Decided
Hobbs Close Garage London Road St Ippolyts Hitchin Hertfordshire SG4 7NJ
Erection of one detached 4-bed dwelling following demolition of existing garage building as revision of previously approved planning permission 21/00298/FP granted 26.03.2021.
-
26/01022/FP Awaiting decision
Service Station Bedford Road Hitchin Hertfordshire SG5 2UG
Installation of parcel lockers following removal of existing locker and installation of paved pathway.
-
26/02400/FP Awaiting decision
Greenbanks London Road St Ippolyts Hitchin Hertfordshire SG4 7NJ
Erection of four dwellings including cycle storage, parking, hard and soft landscaping, and alterations to access layout following demolition of existing dwelling and other buildings.
-
26/02392/FP Awaiting decision
Land South Of 14 High Street Graveley Hertfordshire SG4 7LB
Erection of one detached self-build dwelling including parking, cycle store, bin store, Air Source Heat Pump, alterations to ground levels and soft and hard landscaping.
-
26/01937/FP Decided
Hitchin Town Hall Brand Street Hitchin Hertfordshire SG5 1HX
Decarbonisation works including provision of secondary glazing to existing windows, the provision of insulation to the roof void above the main hall, replacement of mechanical plant including the removal of gas boilers and the installation of Photovoltaic (PV) panels and Air Source Heat Pump (ASHP)