Planning application
Land Off Stallingborough Interchange Kiln Lane Stallingborough North East Lincolnshire
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Details in Discharge of Conditions 13 (Highway, Drainage and Landscape Maintenance), 14 (Turning Facilities) and 16 (Highway/Access Signage) pursuant to DM/0492/25/REM
As published by the council, reference DM/0214/26/CND
Application record
- Reference
- DM/0214/26/CND
- Type
- Discharge Condition
- Status
- Pending Consideration
- Received
- 25 Mar 2026
- Validated
- 25 Mar 2026
- Ward
- Immingham
- Parish
- Stallingborough Parish Council
Site history
Applications at this address on the North East Lincolnshire register
This site has had 9 applications since 2020: 4 approved, 0 refused.
-
DM/0495/26/ADV Decided
Land Off Stallingborough Interchange Kiln Lane Stallingborough North East Lincolnshire
Display 1 internally-illuminated totem sign, 2 internally-illuminated fascia signs, 8 non-illuminated unit number signs and 4 non-illuminated feature wall signs
-
DM/0203/26/REM Granted
Land Off Stallingborough Interchange Kiln Lane Stallingborough North East Lincolnshire
Reserved matters application comprising the erection of one industrial unit pursuant to Hybrid Planning Permission Ref. DM/0105/18/FUL; comprising commercial/employment floor space (Use Class B2), together with associated buildings, landscaping, infrastructure, parking and other associated works - FURTHER INFO REC 11TH JUNE
-
DM/0242/26/SCR Decided
Land Off Stallingborough Interchange Kiln Lane Stallingborough North East Lincolnshire
Request for EIA screening opinion for reserved matters application comprising the erection of one industrial unit pursuant to Hybrid Planning Permission Ref. DM/0105/18/FUL; comprising commercial/employment floor space (Use Class B2), together with associated buildings, landscaping, infrastructure, parking and other associated works
-
DM/0083/26/CND Decided
Land Off Stallingborough Interchange Kiln Lane Stallingborough North East Lincolnshire
Details in Discharge of Condition 17 (Construction Environmental Management Plan) pursuant to DM/0492/25/REM
-
DM/0283/23/FUL Granted
Land Off Stallingborough Interchange Kiln Lane Stallingborough North East Lincolnshire
Installation of temporary car park for 2 years
-
DM/0302/21/REM Granted
Land Off Stallingborough Interchange Kiln Lane Stallingborough North East Lincolnshire
Reserved matters application following DM/0105/18/FUL to consider access, appearance, landscaping, layout and scale (Amended Plans received 5th May 2022 to increase footprint of the building at entrance/frontage, install external staircase, increase external break out area, creation of partial second floor, amendments to parking areas and installation of a substation)
-
DM/0487/21/FUL Granted
Land Off Stallingborough Interchange Kiln Lane Stallingborough North East Lincolnshire
Installation of drainage pond
-
DM/0545/20/NMA Decided
Land Off Stallingborough Interchange Kiln Lane Stallingborough North East Lincolnshire
Non-material amendment as granted on DM/0105/18/FUL (Hybrid application seeking outline consent with access, landscaping and scale to be considered for the development of a 62ha Business Park comprising up to 120,176 sq.m for B1 (Business), B2 (General Industrial) and B8 (Storage and Distribution), associated infrastructure and internal highways. Full application for the creation of a new roundabout, new access roads, associated highway works, substations, pumping stations, drainage and landscaping) to amend the location of the sub station and pump station
Timeline
Dates from the published record
-
25 Mar 2026
Received by North East Lincolnshire
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 20 May 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
North East Lincolnshire took a median of 71 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with North East Lincolnshire for determination, against a statutory target of eight weeks. Over the last year North East Lincolnshire's median decision took 71 days. More in our guide to how long planning decisions take.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Land Off Stallingborough Interchange Kiln Lane Stallingborough North East Lincolnshire
Reserved matters application following DM/0105/18/FUL to consider access, appearance, landscaping, layout and scale (Amended Plans received 5th May 2022 to increase footprint of the building at entrance/frontage, install external staircase, increase external break out area, creation of partial second floor, amendments to parking areas and installation of a substation)
Granted Reserved matters 127 docs -
Plot 1 Land Off Stallingborough Interchange Kiln Lane Stallingborough North East Lincolnshire
Details in discharge of Condition 3 (Construction Management and Construction Traffic Plan), Condition 5 (Surface Water Drainage), Condition 6 (Foul Water Drainage) and Condition 9 (Piling Details) pursuant to DM/0858/19/REM (Reserved matters application following DM/0105/18/FUL (Hybrid application seeking outline consent with access, landscaping and scale to be considered for the development of a 62ha Business Park comprising up to 120,176 sq.m for B1 (Business), B2 (General Industrial) and B8 (Storage and Distribution), associated infrastructure and internal highways. Full application for the creation of a new roundabout, new access roads, associated highway works, substations, pumping stations, drainage and landscaping. (Amended FRA and Drainage Strategy July 2018)) to erect a detached business unit of mixed use (B1/ B8) to include access road, car park with HGV loading, landscaping and associated works.)
Decided Conditions 16 docs -
Plot 1 Land Off Stallingborough Interchange Kiln Lane Stallingborough North East Lincolnshire
Reserved matters application following DM/0105/18/FUL (Hybrid application seeking outline consent with access, landscaping and scale to be considered for the development of a 62ha Business Park comprising up to 120,176 sq.m for B1 (Business), B2 (General Industrial) and B8 (Storage and Distribution), associated infrastructure and internal highways. Full application for the creation of a new roundabout, new access roads, associated highway works, substations, pumping stations, drainage and landscaping. (Amended FRA and Drainage Strategy July 2018)) to erect a detached business unit of mixed use (B1/ B8) to include access road, car park with HGV loading, landscaping and associated works.
Granted Reserved matters 62 docs -
Land Off Stallingborough Interchange Kiln Lane Stallingborough North East Lincolnshire
Non-material amendment as granted on DM/0105/18/FUL (Hybrid application seeking outline consent with access, landscaping and scale to be considered for the development of a 62ha Business Park comprising up to 120,176 sq.m for B1 (Business), B2 (General Industrial) and B8 (Storage and Distribution), associated infrastructure and internal highways. Full application for the creation of a new roundabout, new access roads, associated highway works, substations, pumping stations, drainage and landscaping) to amend the location of the sub station and pump station
Decided Amendments 11 docs -
Land Off Stallingborough Interchange Kiln Lane Stallingborough North East Lincolnshire
Installation of temporary car park for 2 years
Granted Full applications 18 docs -
Land Off Stallingborough Interchange - Plot 01 Kiln Lane Stallingborough North East Lincolnshire
93% historically approved · decision due ~23 Jun
Non material amendment pursuant to DM/0492/25/REM for alterations to Plot 01 - Removal of hammerheads between units 1-3 and 4-6, parking bay to substation amended, installation of kiosks and vent housing for treatment plant, path amended and fence locations slightly adjusted to top of kerb locations
Awaiting decision Amendments 12 docsSmall domestic
Other condition discharge and variation applications
In North East Lincolnshire
-
DM/0627/26/CND Awaiting decision
Land On West Side Of Ladysmith Road Grimsby North East Lincolnshire DN32 9PL
Details in Discharge of Conditions 4 (Residential Travel Plan), 11 (Acoustic Details for Substation) and 14 (Flood Evacuation Plan) pursuant to DM/0656/25/FUL
-
DM/0543/26/CND Awaiting decision
12 Southfield Road Grimsby North East Lincolnshire DN33 2PL
Details in discharge of Condition 4 (Surface and Foul Water Drainage) pursuant to DM/0810/25/FULA
-
DM/0544/26/CND Awaiting decision
Bursar Primary School Bursar Street Cleethorpes North East Lincolnshire DN35 8DS
Details in discharge of Conditions 2 (Drainage), 5 (Ecological Enhancement), 6 (Landscaping), 7 (Bin and Cycle Storage), 11 (Remediation and Verification), 12 (Unsuspected Contamination) and 14 (Brickwork Repairs and Materials) pursuant to DM/1065/24/FUL
-
DM/0858/25/CND Awaiting decision
Haven Mill Garth Lane Grimsby North East Lincolnshire DN31 1RS
Details in Discharge of Conditions 3 (External Materials), 4 (Construction Management Plan), 12 (Noise Impact Assessment) and 18 (Footbridge) pursuant to DM/0679/24/FUL
-
DM/0088/26/CND Awaiting decision
14-16 Victoria Street Grimsby North East Lincolnshire
Details in Discharge of Conditions 5 (Windows and Doors), 6 (Shop Front), 7 (Ventilation and Extraction), 8 (Bat Survey), 9 (Construction Traffic Management Plan) and 10 (Cycle Parking) pursuant to DM/0263/24/FUL