Planning application
DSM Nutritional Products UK Ltd Drakemyre Dalry North Ayrshire KA24 5JJ
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Installation of 2 biomass boiler systems, fuel stores and a low carbon energy centre with 1 no. electric boiler, 3 no. back-up gas boilers and 2 no. gas turbines coupled with heat recovery boilers, including the erection of associated flue stacks
As published by the council, reference 26/00014/PP
Application record
- Reference
- 26/00014/PP
- Type
- Planning Permission (Full)
- Status
- Approved subject to Conditions
- Decision
- Approved subject to Conditions
- Received
- 13 Jan 2026
- Validated
- 16 Jan 2026
- Decided
- 23 Feb 2026
- Ward
- Garnock Valley
- Parish
- Dalry Community Council
- Decision by
- Delegated
- Postcode
- KA24 5JJ
Site history
Applications at this address on the North Ayrshire register
This site has had 2 applications since 2024: 2 approved, 0 refused.
-
24/00363/HSC Granted
DSM Nutritional Products UK Ltd Drakemyre Dalry North Ayrshire KA24 5JJ
Storage of various hazardous substances within factory site
Timeline
Dates from the published record
-
13 Jan 2026
Received by North Ayrshire
-
16 Jan 2026
Validated
Checked as complete and ready for consideration.
-
23 Feb 2026
Decision issued: Approved subject to Conditions
-
27 Jul 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Dallol Energy Limited F.a.o Victor Sacramento Agent
1 application on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDSM Nutritional Products (UK) Limited F.a.o Applicant
1 application on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
37 documents on file for this application
- Further coal consultation response
- Decision notice
- Report of handling
- Sepa consultation response
- Further coal consultation response
- Fra and suds (rev 1)
- Ground investigation phase 2 report
- Roads consultation response
- Hse consultation response
- Dalry cc consultation response
- Water consultation response
- Coal consultation response
- Sepa triage information
- Proposed block plan and core path realignment
- Supporting statement incorporating design and access
- Unexploded ordnance (uxo) survey
- Ground investigation phase 1_1
- Ground investigation phase 1_2
- Air quality assessment
- Preliminary ecological assessment
- Noise impact assessment
- Traffic management plan
- Substation elevations and floor plan
- Generator lv switchroom pfc elevations
- Existing site layout
- Proposed site layout
- Location plan
- Application for planning permission
- Main energy hub elevations
- Main energy hub floor plans
- Gas turbine floor plans and elevations
- Biomass plant and fuel store elevations 1
- Biomass plant and fuel store elevations 2
- Biomass plant floor plans
- Location plan
- Proposed site elevations 1
- Proposed site elevations 2
Trade members open them from here.
Open the documentsWhat this grant of permission means
North Ayrshire granted permission on 23 February 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
DSM Nutritional Products UK Ltd Drakemyre Dalry North Ayrshire KA24 5JJ
Storage of various hazardous substances within factory site
Granted Other 55 docs -
DSM Nutritional Products UK Ltd Drakemyre Dalry Ayrshire KA24 5JJ
Storage of various hazardous substances within factory site
Withdrawn Other 9 docs -
DSM Nutritional Products UK Ltd Drakemyre Dalry Ayrshire KA24 5JJ
Erection of chemical production and distribution facility for the manufacture of an animal feed additive
Granted Full applications 122 docsMajor scheme -
Building 82 DSM Nutritional Products UK Ltd Drakemyre Dalry North Ayrshire KA24 5JJ
Erection of internally illuminated sign on east elevation of building 82
Granted Advertising 7 docs -
DSM Nutritional Products UK Ltd Drakemyre Dalry Ayrshire KA24 5JJ
Erection of replacement nitrogen plant with associated foundations, hardstanding, drainage and fencing
Granted Full applications 11 docs -
DSM Nutritional Products UK Ltd Drakemyre Dalry Ayrshire KA24 5JJ
Request for EIA Scoping Opinion for the development of a chemical production and distribution facility for the manufacture of an animal feed additive within the boundaries of the existing factory site
Decided Outline
Other full applications
In North Ayrshire
-
26/00447/PP Granted
Site To South Of Arran Heritage Museum Brodick Isle Of Arran North Ayrshire
Formation of new foot path
-
26/00324/PP Refused
Site To South East Of Farm Cottage Corriecravie Brodick Isle Of Arran North Ayrshire
Erection of detached dwelling house and formation of access
-
26/00477/PP Granted
Hunterston East 400kv Power Station West Kilbride North Ayrshire KA23 9QX
Substation security upgrades
-
26/00607/PP Awaiting decision
Boathouse Brodick Isle Of Arran North Ayrshire KA27 8AJ
Change of use to Class 3 (cafe)
-
26/00606/PP Awaiting decision
Ayrshire Central Hospital Kilwinning Road Irvine North Ayrshire KA12 8SS
Erection of 28 dwelling houses for social rent to include the demolition of existing buildings, formation of access roads, parking, open space, landscaping, SuDS and ancillary infrastructure