Skip to content
PlanIndex Get alerts
Menu

Planning application

DSM Nutritional Products UK Ltd Drakemyre Dalry Ayrshire KA24 5JJ

Granted North Ayrshire 22/00595/PPM Planning Permission (major)

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of chemical production and distribution facility for the manufacture of an animal feed additive

As published by the council, reference 22/00595/PPM

Application record

Reference
22/00595/PPM
Type
Planning Permission (major)
Status
Approved subject to Conditions
Decision
Granted As published: Approved subject to Conditions
Received
5 Aug 2022
Validated
16 Aug 2022
Decided
26 Oct 2022
Ward
Garnock Valley
Parish
Dalry Community Council
Decision by
Committee
Postcode
KA24 5JJ

Site history

Applications at this address on the North Ayrshire register

This site has had 4 applications since 2022: 2 approved, 0 refused.

  • 24/00038/HSC Withdrawn

    DSM Nutritional Products UK Ltd Drakemyre Dalry Ayrshire KA24 5JJ

    Storage of various hazardous substances within factory site

    Decided 25 Apr 2024 Other
  • 23/00582/PP Granted

    DSM Nutritional Products UK Ltd Drakemyre Dalry Ayrshire KA24 5JJ

    Erection of replacement nitrogen plant with associated foundations, hardstanding, drainage and fencing

    Decided 30 Aug 2023 Full applications
  • 22/00057/EIA Decided

    DSM Nutritional Products UK Ltd Drakemyre Dalry Ayrshire KA24 5JJ

    Request for EIA Scoping Opinion for the development of a chemical production and distribution facility for the manufacture of an animal feed additive within the boundaries of the existing factory site

    Decided 23 Feb 2022 Outline

Timeline

Dates from the published record

  1. 5 Aug 2022

    Received by North Ayrshire

  2. 16 Aug 2022

    Validated

    Checked as complete and ready for consideration.

  3. 26 Oct 2022

    Decision issued: Approved subject to Conditions

  4. 1 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

SLR Consulting Limited Fao Morag Eaton Agent

1 application on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

DSM Nutritional Products (UK) Ltd Fao Applicant

2 applications on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

122 documents on file for this application

  • Decision notice Decision · 26 Oct 2022
  • Committee report 26/10/22 Report · 26 Oct 2022
  • Committee minutes 26/10/22 Other · 26 Oct 2022
  • Revised sepa response Consultation Response · 11 Oct 2022
  • Sepa response Consultation Response · 30 Sep 2022
  • Environmental health response Consultation Response · 23 Sep 2022
  • Coal authority response Consultation Response · 01 Sep 2022
  • Water response Consultation Response · 31 Aug 2022
  • Mining plan Support Document · 23 Aug 2022
  • Roads response Consultation Response · 23 Aug 2022
  • Neighbour notification Neighbour Notification List · 22 Aug 2022
  • Consultation response - hse Consultation Response · 18 Aug 2022
  • Transformer room, plan section & elevations Approved Drawing · 05 Aug 2022
  • Building perspectives Approved Drawing · 05 Aug 2022
  • Site elevation north and east Approved Drawing · 05 Aug 2022
  • Site elevation south and west Approved Drawing · 05 Aug 2022
  • Key plan Approved Drawing · 05 Aug 2022
  • Combined drainage layout Approved Drawing · 05 Aug 2022
  • External general arrangement drawing Approved Drawing · 05 Aug 2022
  • External works cut and fill ga Approved Drawing · 05 Aug 2022
  • External works cut fill sections Approved Drawing · 05 Aug 2022
  • Control room building ga plan - level 1- gr Approved Drawing · 05 Aug 2022
  • Control room building ga plan - level 2 Approved Drawing · 05 Aug 2022
  • Control room building ga plan level r1 - ro Approved Drawing · 05 Aug 2022
  • Control room building ga elevations Approved Drawing · 05 Aug 2022
  • Production building ga plan - level 1 - gro Approved Drawing · 05 Aug 2022
  • Production building ga plan - level 1 - gro Approved Drawing · 05 Aug 2022
  • Production building ga plan - level 2 Approved Drawing · 05 Aug 2022
  • Production building ga plan - level 3 Approved Drawing · 05 Aug 2022
  • Production building ga plan - level 4 Approved Drawing · 05 Aug 2022
  • Production building ga plan - level 5 Approved Drawing · 05 Aug 2022
  • Production building ga plan - roof 1of 2 Approved Drawing · 05 Aug 2022
  • Production building ga plan - roof 2 of 2 Approved Drawing · 05 Aug 2022
  • Production building ga elevations 1 and 2 Approved Drawing · 05 Aug 2022
  • Production building ga elevations 3 and 4 Approved Drawing · 05 Aug 2022
  • Reactor building plans section and elevatio Approved Drawing · 05 Aug 2022
  • West tank farm Approved Drawing · 05 Aug 2022
  • South tank farm Approved Drawing · 05 Aug 2022
  • Site location plan Approved Drawing · 05 Aug 2022
  • Site context Approved Drawing · 05 Aug 2022
  • Designations Support Document · 05 Aug 2022
  • Existing site layout Approved Drawing · 05 Aug 2022
  • Proposed site layout Approved Drawing · 05 Aug 2022
  • Wider site location plan Approved Drawing · 05 Aug 2022
  • Combined exploratory location plan Approved Drawing · 05 Aug 2022
  • Mining constraints plan Approved Drawing · 05 Aug 2022
  • Exploratory locations Approved Drawing · 05 Aug 2022
  • Lvia study area and viewpoints Support Document · 05 Aug 2022
  • 18 site photography Support Document · 05 Aug 2022
  • 23 viewpoint photography 1of3 Support Document · 05 Aug 2022
  • 23 viewpoint photography 2of3 Support Document · 05 Aug 2022
  • 19 to 23 viewpoint photography 3of3 Support Document · 05 Aug 2022
  • Lvia aerial imagery and viewpoints Support Document · 05 Aug 2022
  • Lvia landscape character Support Document · 05 Aug 2022
  • Lvia designations and walking routes Support Document · 05 Aug 2022
  • 5 to 14 photomontages 1of3 Support Document · 05 Aug 2022
  • 5 to 14 photomontages 2of3 Support Document · 05 Aug 2022
  • 5 to 14 photomontages 3of3 Support Document · 05 Aug 2022
  • Indicative landscape masterplan Approved Drawing · 05 Aug 2022
  • Local hydrology Support Document · 05 Aug 2022
  • Habitat results Support Document · 05 Aug 2022
  • Protected species results Support Document · 05 Aug 2022
  • Ecology designations Support Document · 05 Aug 2022
  • Eia report appendix 10-1 survey results Other · 05 Aug 2022
  • Eia report appendix 10-2 construction mitigation Report · 05 Aug 2022
  • Eia report appendix 11-1 fra and dia Report · 05 Aug 2022
  • Eia report appendix 11-1 fra dia app11-1a Support Document · 05 Aug 2022
  • Eia report appendix 12-1 habitat report Report · 05 Aug 2022
  • Eia report appendix 12-2 transport statement Report · 05 Aug 2022
  • Eia report appendix 12-2 ts app12-2a Other · 05 Aug 2022
  • Eia report appendix 12-2 ts app12-2b Other · 05 Aug 2022
  • Eia report appendix 3-1 landscape management plan Report · 05 Aug 2022
  • Eia report appendix 7-1 thermal oxidiser modelling Report · 05 Aug 2022
  • Eia report appendix 7-2 construction dust assessment Report · 05 Aug 2022
  • Eia report appendix 7-3 operational fugitive odour Report · 05 Aug 2022
  • Eia report appendix 7-4 operational dust Report · 05 Aug 2022
  • Eia report appendix 7-5 road traffic screening Report · 05 Aug 2022
  • Eia report appendix 8-1 plqra app8-1a Other · 05 Aug 2022
  • Eia report appendix 8-1 plqra app8-1b Other · 05 Aug 2022
  • Eia report appendix 8-1 plqra app8-1c Other · 05 Aug 2022
  • Eia report appendix 8-1 plqra Report · 05 Aug 2022
  • Eia report appendix 8-2 lqra app8-2a to 8-2e Other · 05 Aug 2022
  • Eia report appendix 8-2 lqra Report · 05 Aug 2022
  • Eia report appendix 8-3 cmra app8-3a Other · 05 Aug 2022
  • Eia report appendix 8-3 cmra app8-3b 1of2 Support Document · 05 Aug 2022
  • Eia report appendix 8-3 cmra app8-3b 2of2 Support Document · 05 Aug 2022
  • Eia report appendix 8-3 cmra app8-3c Report · 05 Aug 2022
  • Eia report appendix 8-3 cmra app8-3d Other · 05 Aug 2022
  • Eia report appendix 8-3 cmra app8-3e Support Document · 05 Aug 2022
  • Eia report appendix 8-3 cmra Report · 05 Aug 2022
  • Eia report appendix 8-4 rms app8-4a Other · 05 Aug 2022
  • Eia report appendix 8-4 rms app8-4b Report · 05 Aug 2022
  • Eia report appendix 8-4 rms app8-4c Other · 05 Aug 2022
  • Eia report appendix 8-4 rms Report · 05 Aug 2022
  • Eia report appendix 9-1 methodology Report · 05 Aug 2022
  • Eia report appendix 9-2 landscape assessment Report · 05 Aug 2022
  • Eia report appendix 9-3 viewpoint assessment Report · 05 Aug 2022
  • Eia report chp 1 introduction Report · 05 Aug 2022
  • Eia report chp 2 site and surroundings Report · 05 Aug 2022
  • Eia report chp 3 proposed development Report · 05 Aug 2022
  • Eia report chp10 noise Report · 05 Aug 2022
  • Eia report chp11 water environment Report · 05 Aug 2022
  • Eia report chp12 other issues Report · 05 Aug 2022
  • Eia report chp13 schedule of mitigation Report · 05 Aug 2022
  • Eia report chp4 need and alternatives Report · 05 Aug 2022
  • Eia report chp5 planning policy and guidance Report · 05 Aug 2022
  • Eia report chp6 approach to eia Report · 05 Aug 2022
  • Eia report chp7 air quality Report · 05 Aug 2022
  • Eia report chp8 ground condition Report · 05 Aug 2022
  • Eia report chp9 landscape and visual Report · 05 Aug 2022
  • Eia report contents Report · 05 Aug 2022
  • Location plan Approved Drawing · 05 Aug 2022
  • Non-technical summary Report · 05 Aug 2022
  • Planning design and access statement Report · 05 Aug 2022
  • Application for planning permission (major) Application Form · 05 Aug 2022
  • Pre-application consultation report Report · 05 Aug 2022
  • Renewable and low carbon feasibility study Report · 05 Aug 2022
  • Section elevation on bb west Approved Drawing · 05 Aug 2022
  • Section elevation on cc looking east Approved Drawing · 05 Aug 2022
  • Plan view at ground level Approved Drawing · 05 Aug 2022
  • Plan view at level 1 Approved Drawing · 05 Aug 2022
  • Plan view at levels 3 & 4 Approved Drawing · 05 Aug 2022

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

North Ayrshire granted permission on 26 October 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In North Ayrshire

  • 26/00566/PP Granted

    Croyde Alma Road Brodick Isle Of Arran North Ayrshire KA27 8AZ

    Demolition of existing side extensions with replacement single side extension

    Received 24 Aug, published by the council 14 Sep 2026 Full applications
  • 26/00676/PP Awaiting decision

    Roebank Hotel And Wedding Venue Roebank Road Beith North Ayrshire KA15 2DX

    Part change of use of hotel/wedding venue to form dwellinghouse

    Received 5 Oct, published by the council 7 Oct 2026 Full applications
  • 26/00589/PP Granted

    5 Bowfield Road West Kilbride North Ayrshire KA23 9LB

    Erection of replacement detached double garage to include the demolition of existing timber garage

    Received 31 Aug, published by the council 8 Sep 2026 Full applications
  • 26/00606/PP Granted

    Ayrshire Central Hospital Kilwinning Road Irvine North Ayrshire KA12 8SS

    Erection of 28 dwelling houses for social rent to include the demolition of existing buildings, formation of access roads, parking, open space, landscaping, SuDS and ancillary infrastructure

    Received 4 Sep, published by the council 14 Sep 2026 Full applications
  • 26/00520/PP Granted

    Overtoun Of Broadstone Gateside Beith North Ayrshire KA15 1HF

    Siting of residential caravan for a temporary period of up to 5 years

    Received 31 Jul, published by the council 11 Aug 2026 Full applications