Skip to content
PlanIndex Get alerts
Menu

Planning application

Approximately 45m west of no 96 Old Park Road, Drumaness, BT24 8LY

Awaiting decision Newry, Mourne and Down LA07/2025/0605/F Full

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

NEW BUILDING FOR THE PURPOSES OF RECYCLING PRODUCTS

As published by the council, reference LA07/2025/0605/F

Application record

Reference
LA07/2025/0605/F
Type
Full
Status
Consultation Open
Received
16 May 2025
Validated
12 Jun 2025
Ward
Drumaness
Postcode
BT24 8LY

Timeline

Dates from the published record

  1. 16 May 2025

    Received by Newry, Mourne and Down

  2. 12 Jun 2025

    Validated

    Checked as complete and ready for consideration.

  3. 7 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 7 August 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Newry, Mourne and Down took a median of 188 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Agent on file, a planning consultancy registered in Newcastle

43 applications on PlanIndex · across 5 councils · 100% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Newry, Mourne and Down for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 21 Red Row, Drumaness, Ballynahinch, BT24 8SD

    LA07/2025/1095/F Submitted 7 Sep 2025 67m away

    97% historically approved · decision due ~4 Dec

    2 storey rear extension comprising kitchen with bedroom above

    Awaiting decision Full applications Extension 7 docs
  • Dan Rice Memorial Hall 96 Drumaness Road, Ballynahinch, BT24 8RL

    LA07/2025/1463/LBC Submitted 20 Nov 2025 116m away

    93% historically approved · decision due ~16 Jan

    Installation of 2no. air conditioning units and associated pipework to side of Dan Rice Hall, Drumaness

    Awaiting decision Heritage and listed buildings 6 docs
  • 30m East of 149 Crawfordstown Road, Drumaness, BT24 8NA

    LA07/2026/0369/F Submitted 31 Mar 2026 198m away

    97% historically approved · decision due ~26 May

    Proposed 3 bay industrial building.

    Awaiting decision Full applications 6 docs
  • 3 Hillside, Ballynahinch, BT24 8SA

    LA07/2026/1015/LBC Submitted 27 Aug 2026 248m away

    93% historically approved · decision due ~22 Oct

    Removal of internal walls, existing staircase and installation of supporting steel beams and new staircase.

    Awaiting decision Heritage and listed buildings 4 docs
  • 156a Drumaness Road, Drumaness, Ballynahinch, BT24 8RL

    LA07/2026/0377/F Submitted 1 Apr 2026 249m away

    97% historically approved · decision due ~28 May

    Installation of a modular building, associated site works, changing facilities, toilets, and a multifunctional community hub. Access remains via the existing entrance to the cricket grounds.

    Awaiting decision Full applications 14 docs
  • 156a Drumaness Road, Ballynahinch, BT24 8RL

    LA07/2026/0219/DC Submitted 24 Feb 2026 306m away

    93% historically approved · decision due ~22 Apr

    Discharge of condition 8 of planning approval LA07/2020/1572/F

    Awaiting decision Conditions 3 docs

In Newry, Mourne and Down

  • 4 Moor Road, Ballyward, Castlewellan, Co. Down BT31 9TY

    1 No. proposed two storey dwelling with detached garage, on site of existing dwelling and garage (to be removed). Updating of existing entrance visibility and visibility splays under policy CTY3. (amended proposal description)

    2 May 2025 Full applications
  • LA07/2026/1050/F Awaiting decision

    2 John Mitchel Place, Newry, BT34 2BP

    Refurbishment of hall (continuance of use within Class D2 for use as a cinema / dance / concert hall / theatre) to include a bar and the addition of roof solar panels and alterations to the entrance on John Mitchell Place to include a new shopfront.

    4 Sep 2026 Full applications
  • LA07/2026/1037/F Awaiting decision

    24 Ballydonnell Road, Glovet, Downpatrick, BT30 8EP

    Granny Annex

    3 Sep 2026 Full applications
  • 86 Carsonstown Road Carsonstown Saintfield BT24 7EB

    Construction of new front single storey garage extension with extension of existing sun terrace balcony to front elevation (including new glazed balustrading) over new garage extension.

    16 May 2025 Full applications
  • LA07/2026/1032/F Awaiting decision

    86 Lismore, Crossmaglen, Newry, BT35 9ET

    Rear extension

    2 Sep 2026 Full applications