Planning application
Civic Centre Godfrey Road Newport NP20 4UR
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
LISTED BUILDING CONSENT FOR WORKS TO CLOCK TOWER
As published by the council, reference 26/0655
Application record
- Reference
- 26/0655
- Status
- Pending As published: CADW
- Received
- 22 Aug 2026
- Validated
- 22 Aug 2026
- Ward
- Allt-yr-Yn
- Postcode
- NP20 4UR
Site history
Applications at this address on the Newport register
This site has had 3 applications since 2025: 1 approved, 0 refused.
-
26/0110 Granted
Civic Centre Godfrey Road Newport NP20 4UR
LISTED BUILDING CONSENT FOR SCHEME TO PROVIDE CEILING HATCHES THROUGHOUT BUILDING CORRIDORS, INCLUDING THE FORMATION OF NEW ACCESS OPENINGS AND THE REPLACEMENT OF EXISTING HATCHES, TO FACILITATE FIRE-STOPPING AND ASBESTOS REMOVAL PURPOSES.
-
25/1017 Decided
Civic Centre Godfrey Road Newport NP20 4UR
LISTED BUILDING CONSENT FOR THE INSTALLATION OF 69NO. 500-WATT PV PANELS, 1NO. 25KW INVERTER, 69NO. OPTIMISERS AND ACCOMPANYING ELECTRICAL DISTRIBUTION SYSTEM
Timeline
Dates from the published record
-
22 Aug 2026
Received by Newport
-
16 Sep 2026
Added to PlanIndex
-
15 Oct 2026
Status changed to CADW
Previously Awaiting decision.
-
Decision
Awaiting decision
Decision expected by 17 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Newport took a median of 62 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
26 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Newport for determination, against a statutory target of eight weeks. Over the last year Newport's median decision took 62 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on Newport's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
Civic Centre Godfrey Road Newport South Wales NP20 4UR
LISTED BUILDING CONSENT FOR THE CARRYING OUT OF INVESTIGATION WORKS
Granted Heritage and listed buildings 9 docs -
Civic Centre Godfrey Road Newport South Wales NP20 4UR
INSTALLATION OF NEW REPEATER PANEL FOR THE ALARM SYSTEM IN THE MAIN ENTRANCE VESTIBLE
Granted Heritage and listed buildings 7 docs -
Civic Centre Godfrey Road Newport NP20 4UR
LISTED BUILDING CONSENT FOR SCHEME TO PROVIDE CEILING HATCHES THROUGHOUT BUILDING CORRIDORS, INCLUDING THE FORMATION OF NEW ACCESS OPENINGS AND THE REPLACEMENT OF EXISTING HATCHES, TO FACILITATE FIRE-STOPPING AND ASBESTOS REMOVAL PURPOSES.
Granted Heritage and listed buildings 36 docs -
Civic Centre Godfrey Road Newport NP20 4UR
LISTED BUILDING CONSENT FOR THE INSTALLATION OF 69NO. 500-WATT PV PANELS, 1NO. 25KW INVERTER, 69NO. OPTIMISERS AND ACCOMPANYING ELECTRICAL DISTRIBUTION SYSTEM
Decided Heritage and listed buildings 28 docs -
Civic Centre Godfrey Road Newport South Wales NP20 4UR
INSTALLATION OF 69NO. 500-WATT PV PANELS, 1NO. 25KW INVERTER, 69NO. OPTIMISERS AND ACCOMPANYING ELECTRICAL DISTRIBUTION SYSTEM
Granted Full applications 29 docs -
10 Gold Tops Newport NP20 4PH
THE CONVERSION OF AN EXISTING DETACHED OFFICE BUILDING INTO A HMO CONSISTING OF 10 SINGLE BEDROOMS WITH ASSOCIATED SERVICES, KITCHEN AND SHOWER ROOMS. REFUSE AND RECYCLING STORAGE, AMENITY SPACE AND CAR PARKING PROVIDED EXTERNALLY
Granted Full applications 24 docs