Planning application
Flatholme Penylan Road Bassaleg Newport NP10 8RW
Works: Extension Demolition
Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.
Proposal
PART DEMOLITION AND CONSTRUCTION OF TWO STOREY EXTENSIONS AND RAISING OF ROOF TO CREATE TWO STOREY ACCOMMODATION (RESUBMISSION FOLLOWING REFUSAL OF 20/0552)
As published by the council, reference 23/0096
Application record
- Reference
- 23/0096
- Type
- Full
- Status
- Awaiting decision
- Decision
- Refused
- Received
- 3 Feb 2023
- Validated
- 6 Feb 2023
- Decided
- 30 Mar 2023
- Ward
- Graig
- Parish
- Graig Community Council
- Decision by
- Delegated
- Postcode
- NP10 8RW
Timeline
Dates from the published record
-
3 Feb 2023
Received by Newport
-
6 Feb 2023
Validated
Checked as complete and ready for consideration.
-
30 Mar 2023
Decision issued: Refused
-
7 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice registered in Penarth
7 applications on PlanIndex · across 3 councils
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
23 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this refusal means
Newport refused this application for the reasons on the decision notice; only the applicant can appeal, and refused schemes often return in revised form. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
White Gate Farm Penylan Road Bassaleg Newport NP10 8RW
DEMOLITION OF CURRENT CONSERVATORY AND CONSTRUCTION OF A SINGLE STOREY SIDE EXTENSION WITH A ROOF TERRACE
Granted Full applications Extension Demolition 13 docsSmall domestic -
Pen Y Groes, Mobile Home Penylan Road Bassaleg Newport NP10 8RW
81% historically approved · decision due ~23 Oct
PARTIAL DISCHARGE OF CONDITION 3 (LANDSCAPING) OF 26/0234 PROPOSED NEW AGRICULTURAL ACCESS TO SERVICE EXISTING FARM BUILDINGS AND FARM HOLDING
Awaiting decision -
Pen Y Groes Penylan Road Bassaleg Newport NP10 8RW
PROPOSED NEW AGRICULTURAL ACCESS TO SERVICE EXISTING FARM BUILDINGS AND FARM HOLDING
Granted Full applications 24 docs -
Pen Y Groes, Mobile Home Penylan Road Bassaleg Newport NP10 8RW
LAWFUL DEVELOPMENT CERTIFICATE (EXISTING) FOR THE SITING OF BUILDING AND USE AS A SINGLE DWELLING (USE CLASS C3)
Refused Lawful development 9 docsDomestic
Other full applications
In Newport
-
26/0397 Granted
Glen View Ponthir Road Newport South Wales NP18 3NW
DEMOLITION OF EXISTING GARAGE AND REAR EXTENSION AND ERECTION OF SINGLE STOREY SIDE AND REAR EXTENSION
-
26/0368 Granted
Streethub Unit On Footpath Outside Monmouthshire House John Frost Square Newport South Wales
PROPOSED INSTALLATION OF 1NO. NEW BT STREET HUB, INCORPORATING 2NO. DIGITAL 75" LCD ADVERT SCREENS, AND ASSOCIATED BT PHONE KIOSK REMOVAL
-
26/0216 Refused
Land Adjacent To Unit 3 Esperanto Way Newport South Wales
PROPOSED CHANGE OF USE FROM OFFICE (B1) TO EVENTS VENUE AND ASSOCIATED WORKS
-
26/0010 Granted
The Grove Bowdens Lane Penhow Newport NP26 3AA
DEMOLITION OF AN EXISTING SEMI-DETACHED DWELLING AND CONSTRUCTION OF A REPLACEMENT TWO-STOREY DETACHED DWELLING, TOGETHER WITH ASSOCIATED WORKS AND USE OF DETACHED HOLIDAY ACCOMMODATION OUTBUILDING AS PRIMARY RESIDENCE FOR DURATION OF CONSTRUCTION PERIOD
-
26/0241 Granted
Liberty Steel Corporation Road Newport NP19 4XE
ENGINEERING WORKS TO CONSTRUCT RAISED BUND AND ACCESS RAMP AROUND APPROVED DATA CENTRE TO A CREST OF APPROXIMATELY 9.75M AOD, PARTIAL DEMOLITION OF A BUILDING, THE IMPORTATION OF FILL MATERIAL TO CREATE THE BUND & RAMP, SURFACING WORKS AND ALTERATIONS TO BUILDING ELEVATIONS TO ACCOMMODATE LEVEL CHANGES