Planning application
Fernwood Agriculture Ltd Checkers Farm Driveway Priory Road Thurgarton NG14 7GU
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Proposed installation of an automated entrance gate, installation of a solar photovoltaic panel mounted on a pole, micro wind turbine above solar panel, battery storage equipment and associated control equipment and ancillary infrastructure
As published by the council, reference 26/01359/FUL
Application record
- Reference
- 26/01359/FUL
- Category
- Full applications
- Status
- Registered
- Received
- 25 Aug 2026
- Validated
- 6 Oct 2026
- Postcode
- NG14 7GU
Timeline
Dates from the published record
-
25 Aug 2026
Received by Newark and Sherwood
-
6 Oct 2026
Validated
Checked as complete and ready for consideration.
-
9 Oct 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 1 December 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Newark and Sherwood took a median of 55 days over the applications it decided in the last year.
What happens while it is decided
This application is with Newark and Sherwood for determination, against a statutory target of eight weeks. Over the last year Newark and Sherwood decided full applications in a median of 94 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Former Checkers Farm Priory Road Thurgarton NG14 7GU
Application for non material amendment to substitute approved drawings with revised indicating existing sections where wall has been taken down by hand and re-built using same bricks atached to planning permission 23/01779/FULM
Granted Amendments 1 doc -
Checkers Farm Priory Road Thurgarton NG14 7GU
Application to determine if prior approval is required for proposed change of use of agricultural buildings to 5 dwellinghouses including the formation of domestic curtilages and for building operations reasonably necessary for the conversion as Schedule 2 Part 3 Class Q
Refused Prior approval 48 docsSeveral homes -
Former Checkers Farm Priory Road Thurgarton NG14 7GU
Application for non-material amendment to planning permission 23/01779/FULM to amend the approved plans to allow changes to the number of windows and positions for Plot 1
Granted Amendments Windows or glazing -
Checkers Farm Priory Road Thurgarton NG14 7GU
Residential redevelopment of former farm complex comprising the demolition of existing buildings and conversion of agricultural buildings to create 3 dwellings and associated garages.
Granted Full applications Demolition 225 docsMajor scheme -
Holly Cottage Priory Road Thurgarton NG14 7GU
Proposed Single storey rear extension, internal alterations and loft conversion.
Granted Full applications Extension Loft or dormer 16 docsSmall domestic -
Holly Cottage Priory Road Thurgarton NG14 7GU
Erection of building for agricultural use
Granted Full applications 14 docs
Other full applications
In Newark and Sherwood
-
26/01616/FUL Awaiting decision
Meadow View Fiskerton Road Rolleston Newark On Trent NG23 5SH
Proposed New Dwelling.
-
26/01104/FUL Granted
Travis Perkins Brunel Drive Newark On Trent NG24 2DE
Relocation of loading bay within existing builders merchants yard and introduction of one-way system
-
26/00747/FUL Withdrawn
Sherwood Restorations Ltd Upton Road Southwell NG25 0QB
Change of use of existing industrial building to Use Class E (for the sale and display of kitchens and bathrooms) together with an extension to rear and external alterations
-
26/01138/FUL Granted
38 & 39 Eakring Road Bilsthorpe NG22 8PX
Widen drop kerb both sides for shared drive access.
-
26/01134/FUL Granted
Mill Farm Gonalston Lane Hoveringham NG14 7JJ
Temporary seasonal change of use of agricultural barn between May and September (inclusive) in connection with existing wedding venue.