Planning application
LAVENDER COTTAGE, MARTIN ROAD, MARTIN SP6 3LF
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Single-storey rear extension, removal of existing, replace fibre cement slates to on side extension to match rear extension, relocation of ground floor bathroom to rear of property, use of current bathroom as study/bedroom; alter wardrobe at first floor to a small toilet (Application for Listed Building Consent)
As published by the council, reference 25/11159
Application record
- Reference
- 25/11159
- Type
- Listed Building Alteration
- Status
- Decided
- Decision
- Granted Subject to Conditions
- Received
- 23 Dec 2025
- Validated
- 29 Dec 2025
- Decided
- 12 Mar 2026
- Ward
- Downlands & Forest North
- Parish
- Martin
- Decision by
- Delegated
- Postcode
- SP6 3LF
Site history
Applications at this address on the New Forest National Park register
This site has had 2 applications since 2025: 2 approved, 0 refused.
-
25/11158 Granted
LAVENDER COTTAGE, MARTIN ROAD, MARTIN SP6 3LF
Single-storey rear extension, removal of existing, replace fibre cement slates to on side extension to match rear extension, alteration to garden levels, single bay timber framed car port on site of former garage
Timeline
Dates from the published record
-
23 Dec 2025
Received by New Forest National Park
-
29 Dec 2025
Validated
Checked as complete and ready for consideration.
-
12 Mar 2026
Decision issued: Granted Subject to Conditions
-
9 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice
24 applications on PlanIndex · across 5 councils · 100% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
24 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
New Forest National Park granted permission on 12 March 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
LAVENDER COTTAGE, MARTIN ROAD, MARTIN SP6 3LF
Single-storey rear extension, removal of existing, replace fibre cement slates to on side extension to match rear extension, alteration to garden levels, single bay timber framed car port on site of former garage
Granted Full applications Extension 28 docsSmall domestic -
LAVENDER COTTAGE, MARTIN ROAD, MARTIN SP6 3LF
Single-storey rear extension, removal of existing, replace fibre cement slates to on side extension to match rear extension, alteration to garden levels, single bay timber framed car port on site of former garage
Granted Full applications Extension 28 docsSmall domestic -
LAVENDER COTTAGE, MARTIN ROAD, MARTIN SP6 3LF
Single-storey rear extension, removal of existing, replace fibre cement slates to on side extension to match rear extension, relocation of ground floor bathroom to rear of property, use of current bathroom as study/bedroom; alter wardrobe at first floor to a small toilet (Application for Listed Building Consent)
Granted Heritage and listed buildings Extension 24 docsSmall domestic -
SHELLEYS, MARTIN ROAD, MARTIN SP6 3LF
Demolition and replacement of rear elevation with two-storey extension, rooflights; replacement front porch, detached garage; demollish and rebuild 2no. chimneys; replacement of front boundary wall and gates with boundary fencing and gates with associated landscaping.
Granted Full applications Extension Loft or dormer +1 76 docsSmall domestic -
SHELLEYS, MARTIN ROAD, MARTIN SP6 3LF
Demolition and replacement of rear elevation with two-storey extension, rooflights; repair and re-tile roofs; replacement front porch, demolish and rebuild 2no. chimneys (Application for Listed Building Consent)
Granted Heritage and listed buildings Extension Loft or dormer +1 59 docsSmall domestic -
SHELLEYS, MARTIN ROAD, MARTIN SP6 3LF
Demolition and replacement of rear elevation with two-storey extension, rooflights; replacement front porch, detached garage; demollish and rebuild 2no. chimneys; replacement of front boundary wall and gates with boundary fencing and gates with associated landscaping.
Granted Full applications Extension Loft or dormer +1 76 docsSmall domestic
Other heritage and listed building applications
In New Forest National Park
-
26/10674 Granted
FRYERN COURT FARM, FRYERN COURT ROAD, BURGATE, FORDINGBRIDGE SP6 1NF
Replacement conservatory roof (Application for Listed Building Consent)
-
26/10643 Granted
1 WELLINGTON PLACE, CAPTAINS ROW, LYMINGTON SO41 9RS
Alterations to flat roof parapet detail and roof covering (Application for Listed Building Consent)
-
26/10272 Granted
PENNYS COTTAGE, ROCKBOURNE SP6 3NL
Single-storey extension for use as cloakroom; erect internal walls to form cloakroom and reopening of blocked up doorway in outbuilding. (Application for Listed Building Consent)
-
26/10829 Awaiting decision
SEA WATER BATHS, BATH ROAD, LYMINGTON SO41 3SE
x1 air exchange unit/heat source pump (Application for Listed Building Consent)
-
26/10650 Granted
4 LEEWARD HOUSE, 42 HIGH STREET, LYMINGTON SO41 9AF
Internal door and wall alterations to facilitate creation of second bathroom (Application for Listed Building Consent)