Planning application

Land At Port Talbot Steelworks Port Talbot

Awaiting decision Neath Port Talbot P2026/0666

Works: Extension Demolition

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Details to be partially agreed in associated with condition 65 (External Lighting) of application P2024/0711 - Full planning permission for the demolition of existing buildings and structures, partial infill of the BOS lagoon, and construction of a new electric arc furnace-based steel production facility (1 no. arc furnace, 2 no. ladle furnaces). The development includes chemical/material storage and transfer infrastructure, pipework and cabling (above and below ground), buildings, fume and dust treatment plant, water treatment facility and material handling systems, electrical control rooms and power infrastructure, offices and ancillary facilities, together with new and amended roads and rail lines, landscaping and green infrastructure, lighting, hardstanding, CCTV, drainage and associated engineering operations. Outline planning permission (with all matters reserved except for access and landscaping) for the construction of a scrap metal handling facility and associated scrap yards, scrap processing facility, new substation, underground and overground electrical infrastructure, and new and amended roads and rail lines, landscape and green infrastructure, lighting, hardstanding, CCTV, drainage and associated engineering operations - granted on 07/03/25.

As published by the council, reference P2026/0666

Application record

Reference
P2026/0666
Status
Awaiting decision
Received
14 Oct 2026
Validated
14 Oct 2026
Ward
Margam & Taibach
Parish
Port Talbot

Site history

Applications at this address on the Neath Port Talbot register

This site has had 2 applications since 2026: 1 approved, 0 refused.

  • P2026/0179 Granted

    Land At Port Talbot Steelworks Port Talbot

    Retention and installation of perimeter fencing, automated vehicular and manual pedestrian gates, traffic signage and Armco barrier.

    Decided 21 May 2026 Full applications

Timeline

Dates from the published record

  1. 14 Oct 2026

    Received by Neath Port Talbot

  2. 15 Oct 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 9 December 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Neath Port Talbot took a median of 57 days over the applications it decided in the last year.

Cases linked to this one on the register

  • Application: P2024/0711 (Decided)

Who's behind it

Company information only, from the register and Companies House

Tata Steel UK Ltd Applicant, registered in London

Active · incorporated 1988 · London

9 applications on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

What happens while it is decided

This application is with Neath Port Talbot for determination, against a statutory target of eight weeks. Over the last year Neath Port Talbot's median decision took 57 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Neath Port Talbot's portal will say. Our guide explains the common types.