Planning application
Hedgerow Located Along Heol Cae'r Bont Heol Cae'r Bont Margam Neath Port Talbot SA13 2NS
Works: Trees
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Application for the removal of approximately 40 metres of hedgerow to facilitate the creation of a temporary construction access from Heol Cae'r Bont, within the fields incorporated by the BOC facility in connection with the installation of an underground cable route, in association with the Margam Substation upgrade. On completion of the development the hedgerow will be reinstated using a native mixed species planting scheme comprising species consistent with the existing hedgerow and surrounding landscape.
As published by the council, reference P2026/0637
Application record
- Reference
- P2026/0637
- Status
- Decided
- Received
- 1 Oct 2026
- Validated
- 1 Oct 2026
- Decided
- 22 Oct 2026
- Postcode
- SA13 2NS
Site history
Applications at this address on the Neath Port Talbot register
This site has had 2 applications since 2026.
-
P2026/0376 Withdrawn
Hedgerow Located Along Heol Cae'r Bont Heol Cae'r Bont Margam Neath Port Talbot SA13 2NS
Application for the removal of approximately 40 metres of hedgerow to facilitate the creation of a temporary construction access from Heol Cae'r Bont, to the installation of an underground cable route, in association with the Margam Substation upgrade. On completion of the development the hedgerow will be reinstated using a native mixed species planting scheme comprising species consistent with the existing hedgerow and surrounding landscape.
Timeline
Dates from the published record
-
1 Oct 2026
Received by Neath Port Talbot
-
1 Oct 2026
Added to PlanIndex
-
22 Oct 2026
Decision issued
-
22 Oct 2026
Status changed to Decided
Previously Awaiting decision.
After the decision
Neath Port Talbot has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Neath Port Talbot's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
Hedgerow Located Along Heol Cae'r Bont Heol Cae'r Bont Margam Neath Port Talbot SA13 2NS
Application for the removal of approximately 40 metres of hedgerow to facilitate the creation of a temporary construction access from Heol Cae'r Bont, to the installation of an underground cable route, in association with the Margam Substation upgrade. On completion of the development the hedgerow will be reinstated using a native mixed species planting scheme comprising species consistent with the existing hedgerow and surrounding landscape.
Withdrawn Trees -
Margam Green Energy Plant Longlands Lane Margam Neath Port Talbot SA13 2NU
97% historically approved · decision due ~3 Oct
Non-Material Amendment (NMA) to Condition 2 of Planning Permission P2025/0446 granted on 25.03.2026 to amend the approved site layout and for replacement building details at Margam Green Energy Plant.
Awaiting decision -
Margam Green Energy Plant Longlands Lane Margam
Advertisment Consent: Entrance sign for "Margam Green Energy Plant" with the dimensions of 5500mm x 2000mm.
Granted Advertising 6 docs -
Land Off J38 Of The M4 Margam Port Talbot
Request for a Scoping Opinion in Accordance With Regulation 14(1) of the Environmental Impact Assessment (Wales) Regulations 2017 for the Development of a Metal Processing Facility Comprising Operational Building (18,250 sq.m), Plus Administration and Amenity Buildings (1,848 sq.m), 300 Parking Spaces and Associated Development.
Decided Outline 3 docs