Skip to content
PlanIndex Get alerts
Menu

Planning application

Swansea University Bay Campus The Great Hall Fabian Way Crymlyn Burrows SA1 8QQ

Awaiting decision Neath Port Talbot P2026/0152 Discharge of Conditions

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Details submitted pursuant to discharge of condition 4 (testing of imported material) of planning permission P2022/0450 dated 13/12/2022 (for raising of site levels on undeveloped land)

As published by the council, reference P2026/0152

Application record

Reference
P2026/0152
Type
Discharge of Conditions
Status
Awaiting decision
Received
13 Mar 2026
Validated
13 Mar 2026
Ward
Coedffranc West
Parish
Coedffranc Town Council
Postcode
SA1 8QQ

Timeline

Dates from the published record

  1. 13 Mar 2026

    Received by Neath Port Talbot

  2. 28 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 8 May 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Neath Port Talbot took a median of 55 days over the applications it decided in the last year.

Cases linked to this one on the register

  • Application: P2022/0450 (Decided)
  • Application: P2022/0452 (Decided)

Who's behind it

Company information only, from the register and Companies House

CB3 Consult Ltd Agent, registered in Swansea

Active · incorporated 2011 · Swansea

1 application on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

Documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Neath Port Talbot for determination, against a statutory target of eight weeks. Over the last year Neath Port Talbot decided condition discharge and variation applications in a median of 46 days. More in our guide to how long planning decisions take.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Swansea University Bay Campus Fabian Way Crymlyn Burrows Neath SA1 8EN

    P2021/0475 Submitted 30 Apr 2021 117m away

    Single Storey gym extension

    Granted Full applications Extension 9 docs
    Small domestic
  • Former Blazer Caravan Site Elba Crescent Crymlyn Burrows Neath Port Talbot SA1 8QQ

    P2026/0260 Submitted 24 Apr 2026 296m away

    Proposed lawful development certificate for the installation of photovoltaic (PV) solar panels on the roof of the building and reconfiguration of the internal layout of the building

    Decided Lawful development
  • Bay Campus Fabian Way Jersey Marine Neath

    2018/1698/LPA Submitted 20 Aug 2018 331m away

    Section 73 application to vary conditions 3 and 4 (to allow an extension of time for the submission of the reserved matters in relation to the remaining phases of the development) of planning permission P2010/0222 for the erection of a university campus originally approved on the 31/08/12 (Referral from Neath Port Talbot Council)

    Granted Outline 9 docs
  • Chain Works Fabian Way Crymlyn Burrows Swansea SA1 8PX

    2021/2031/LPA Submitted 29 Jul 2021 361m away

    Construction of 8 light industrial/storage units (Class B2/B8) (Referral from Neath Port Talbot County Borough Council)

    Granted Outline 1 doc
  • Trojan Close Crymlyn Burrows Neath Port Talbot SA1 8QA

    P2026/0453 Submitted 9 Jul 2026 376m away

    97% historically approved · decision due ~28 Sep

    Change of use to a Sui Generis commercial operational haulage yard including laying of new hardcore surfacing, storage container management, storage operations, vehicle storage and HIAB (truck-mounted crane) loading, unloading and lifting operations (part retrospective)

    Awaiting decision

In Neath Port Talbot

  • P2026/0038 Withdrawn

    37 St Catherines Road Baglan Neath Port Talbot SA12 8AT

    Agreement of details in association with planning conditions 3 (tree protection scheme) and 4 (retaining walls - structural calculations) of planning permission P2024/0815 granted on 09.09.2025.

    22 Jan 2026 Conditions
  • P2025/0689 Granted

    The Paddock Access To Dyffryn Farm Dyffryn Neath Port Talbot SA10 7BQ

    Details to be agreed in association with conditions 2 (mine gas risk assessment), 3 (contamination), 5 (gigabit infrastructure), 6 (intrusive site investigations), 10 (car parking), 11 (external materials) and 12 (tree planting) of P2025/0206 (two storey dwelling) granted on 21/5/25. (Updated / revised information received 06.05.26) (Condition 7 removed from application)

    26 Sep 2025 Conditions
  • P2026/0201 Granted

    Caewern House Dwr Y Felin Road Caewern Neath Neath Port Talbot SA10 7RH

    Details submitted pursuant to condition 11 (Written Scheme of Investigation for historic building recording) of planning permission P2024/0301 dated 11.09.2025 (for demolition of Caewern House and construction of 36 no. affordable residential flats)

    31 Mar 2026 Conditions
  • P2026/0266 Granted

    Land At Heol Crwys Cwmavon Neath Port Talbot SA12 9NT

    Details to be agreed in association with Condition 16 (Verification) of application P2023/0369 determined 16.02.2024.

    27 Apr 2026 Conditions
  • P2025/0630 Granted

    Muga Adjacent To Afan Lido Football Club The Princess Margaret Way Aberavon

    Discharge of condition 12 (Noise) and condition 13 (Lighting) of planning permission P2024/0194 for the re-development of existing Multi-Use Games Area (MUGA) to an all-weather third-generation ('3G') pitch, spectator stand, changing rooms and clubhouse, sustainable drainage and associated works.

    2 Sep 2025 Conditions