Derwen Plant Ltd Neath Abbey Wharf Neath Abbey Wharf Access Road Skewen Neath Port Talbot SA10 6BL

Awaiting decision Neath Port Talbot Full Plans

Proposal

Part retrospective application for the proposed installation of portable concrete manufacturing plant to be used in association with the existing business and the general public (amended Site Location Plan submitted 08/06/2026) (Amended drawings/plans (site plan, swept path, parking arrangements, drainage plan) submitted 08/06/2026) (Amended supporting documents (noise assessment, tree survey, drainage statement, covering letter, GIS, FCA, planning and transport statement) submitted 08/06/2026

As published by the council, reference P2025/0811

Timeline

Dates from the published record

  1. 18 Nov 2025

    Received by Neath Port Talbot

  2. 8 Jun 2026

    Validated

    Checked as complete and ready for consideration.

  3. 28 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Neath Port Talbot for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • P2025/0754 Granted

    Cardonnel Court Cardonnel Road Skewen Neath Port Talbot SA10 6BS

    Construction of a residential care facility with associated works

    24 Oct 2025 226m away Full applications
  • P2026/0403 Awaiting decision

    Cardonnel Court Cardonnel Road Skewen Neath Port Talbot SA10 6BS

    Details submitted pursuant to condition 4 (Construction Environmental Management Plan) of planning permission P2025/0754 dated 16.06.2026 (for construction of a residential care facility with associated works) SIGNED VERSION OF CEMP RECEIVED

    17 Jun 2026 231m away Conditions

In Neath Port Talbot

  • P2026/0404 Withdrawn

    3 Tai'r Ynys Fawr Pontrhydyfen Neath Port Talbot SA12 9RU

    Rear single storey bedroom, shower room and porch extension

    17 Jun 2026 Full applications
  • P2026/0159 Granted

    44 Leyshon Road Gwaun Cae Gurwen Neath Port Talbot SA18 1EN

    Proposed two storey rear extension (amended location and site plan received 24/06/2026).

    18 Mar 2026 Full applications
  • P2026/0263 Granted

    3 Heol Y Gwrgan Margam Neath Port Talbot SA13 2DG

    Retention and completion of a detached garage

    27 Apr 2026 Full applications
  • P2026/0491 Awaiting decision

    7 Plas Road Rhos Pontardawe Neath Port Talbot SA8 3HD

    Retrospective application for a single storey rear extension in addition to a raised decking area.

    22 Jul 2026 Full applications
  • P2026/0353 Granted

    61 Neath Road Briton Ferry Neath Port Talbot SA11 2DX

    Proposed replacement of a uPVC framed shop front to aluminium

    1 Jun 2026 Full applications