Planning application
R A Range Hebrides Balivanich Isle Of Benbecula
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Construct temporary (1 year) modular cabins providing communal welfare facilities, comprising one mixed-use building and separate gym, laundry and induction buildings. Creation of temporary replacement parking spaces. Installation of acoustic fencing and additional security fencing.
As published by the council, reference 26/00311/PPD
Application record
- Reference
- 26/00311/PPD
- Type
- Planning Permission (Detailed)
- Status
- Awaiting decision
- Received
- 11 Aug 2026
- Validated
- 24 Aug 2026
- Ward
- Uibhist A Deas,Eirisgeigh,Beinn Faoghla
- Parish
- Benbecula
- Decision by
- Delegate Decision
Timeline
Dates from the published record
-
11 Aug 2026
Received by Na h-Eileanan Siar
-
24 Aug 2026
Validated
Checked as complete and ready for consideration.
-
1 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 19 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Na h-Eileanan Siar took a median of 58 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
16 documents on file for this application
- BUILDING STANDARDS - RESPONSE
- SSEN - RESPONSE
- SG ADVERT
- ROADS - RESPONSE
- HIAL - RESPONSE
- SCOTTISH WATER - RESPONSE
- LIST OF NEIGHBOURS NOTIFIED
- UPDATED LAND OWNERSHIP CERTIFICATE
- 06 SITE PLAN AS EXISTING
- 02 SITE PLAN PROPOSED (WEST)
- 03 SITE PLAN PROPOSED (EAST)
- 01 LOCATION PLAN
- 05 MODULAR BUIDING PLANS
- 04 MODULAR BUILDING ELEVATIONS
- APPLICATION FORM
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Na h-Eileanan Siar for determination, against a statutory target of eight weeks. Over the last year Na h-Eileanan Siar decided full applications in a median of 80 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Eabhal Business Park Balivanich Isle Of Benbecula
99% historically approved · decision due ~26 Nov
Install new photo-voltaic solar panels onto the existing roofs to serve units 1-5 at Eabhal Business Park.
Awaiting decision Full applications 7 docs -
-
-
Ospadal Uibhist Agus Bharraigh Balivanich Isle Of Benbecula HS7 5LA
Erect community equipment service facility
Granted Full applications 11 docs -
-
SGRPID Office Balivanich Isle Of Benbecula HS7 5LA
External overclad and re-roofing works
Granted Full applications 17 docs
Other full applications
In Na h-Eileanan Siar
-
23/00507/PPD Granted
Workshop Carloway Pier Knock Carloway Isle Of Lewis
Site portable unit for a community workshop for marine plastic recycling solutions
-
26/00301/PPD Granted
Storage Container Port Of Ness Ness Isle Of Lewis
Siting of 3x shipping containers.
-
26/00293/PPD Granted
Uig Sands Restaurant Timsgarry Uig Isle Of Lewis HS2 9ET
Erect storage building
-
26/00100/PPD Granted
Alex Murray (Construction) Ltd Blar Buidhe Rathad Shim Stornoway Isle Of Lewis HS1 2UT
Change of use of former care home into suis generis non-domestic multi-occupancy residential use for 27 accommodation rooms and up to 15 staff on site. Associated works including: widen existing vehicular access; expanded parking area; install air source heat pumps; roof mounted solar panels; installed 1.8m high timber fencing; revised window openings and replacement doors; existing timber cladding replaced with cement board; single dormer removed on north elevation. Erect 2no. timber gazebos. Erect plant room.
-
26/00342/PPD Granted
Royal Bank Of Scotland 17 North Beach Stornoway Isle Of Lewis HS1 2XH
Paint front door and handrails black. Remove painted metal panels in select windows and replace with glazing.