Planning application
Pod 3 Borve Berneray Isle Of North Uist
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Change of use of Land to site a caravan (pod) for use for short term holiday let with associated access and infrastructure
As published by the council, reference 26/00227/PPD
Application record
- Reference
- 26/00227/PPD
- Type
- Planning Permission (Detailed)
- Status
- Decided
- Decision
- Granted As published: Application Permitted with conditions
- Received
- 15 Jun 2026
- Validated
- 23 Jun 2026
- Decided
- 2 Sep 2026
- Ward
- Uibhist A Tuath
- Parish
- Berneray
- Decision by
- Delegated Decision
Timeline
Dates from the published record
-
15 Jun 2026
Received by Na h-Eileanan Siar
-
23 Jun 2026
Validated
Checked as complete and ready for consideration.
-
27 Jul 2026
Added to PlanIndex
-
2 Sep 2026
Decision issued: Application Permitted with conditions
Related applications
Cases linked to this one on the register
- Scottishbuildingwarrant: 26/00216/AL_4 (Pending Consideration)
Documents
Plans, drawings, consultee responses and the officer's report
16 documents on file for this application
- 01 APPROVED LOCATION PLAN
- 02 APPROVED SITE PLAN
- DECISION NOTICE
- REPORT ON HANDLING
- ROADS - RESPONSE
- SG ADVERT 02.07.26
- HES - RESPONSE
- ENVIRONMENTAL HEALTH - RESPONSE
- ARCHAEOLOGY - RESPONSE
- SCOTTISH WATER - RESPONSE
- 04 FLOOR PLAN
- 03 ELEVATION
- LIST OF NEIGHBOURS NOTIFIED
- BUILDING STANDARDS - RESPONSE
- APPLICATION FORM
- PLANNING STATEMENT
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Na h-Eileanan Siar granted permission on 2 September 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
-
Small domestic
-
Borve Berneray Isle Of North Uist HS6 5BJ
New Village Septic Tank and Constructed Wetlands (East)
Granted Full applications -
Small domestic
-
-
Seaview 11 Borve Berneray Isle Of North Uist HS6 5BJ
Raise wall head and replace corrugated iron roof with fibre cement slates
Granted Full applications
Other full applications
In Na h-Eileanan Siar
-
23/00507/PPD Granted
Workshop Carloway Pier Knock Carloway Isle Of Lewis
Site portable unit for a community workshop for marine plastic recycling solutions
-
26/00301/PPD Granted
Storage Container Port Of Ness Ness Isle Of Lewis
Siting of 3x shipping containers.
-
26/00293/PPD Granted
Uig Sands Restaurant Timsgarry Uig Isle Of Lewis HS2 9ET
Erect storage building
-
26/00100/PPD Granted
Alex Murray (Construction) Ltd Blar Buidhe Rathad Shim Stornoway Isle Of Lewis HS1 2UT
Change of use of former care home into suis generis non-domestic multi-occupancy residential use for 27 accommodation rooms and up to 15 staff on site. Associated works including: widen existing vehicular access; expanded parking area; install air source heat pumps; roof mounted solar panels; installed 1.8m high timber fencing; revised window openings and replacement doors; existing timber cladding replaced with cement board; single dormer removed on north elevation. Erect 2no. timber gazebos. Erect plant room.
-
26/00342/PPD Granted
Royal Bank Of Scotland 17 North Beach Stornoway Isle Of Lewis HS1 2XH
Paint front door and handrails black. Remove painted metal panels in select windows and replace with glazing.