Planning application
25/00471/LBC
Comman Eachdraidh Uibhist A Tuath Old Carinish School Carinish Carinish Isle Of North Uist HS6 5EJ
Proposal
Replace 8no uPVC windows with timber sash and case windows.
As published by the council, reference 25/00471/LBC
Timeline
Dates from the published record
-
15 Dec 2025
Received by Na h-Eileanan Siar
-
25 Feb 2026
Decision issued: Application Permitted
-
27 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About heritage and listed buildings applications
How this application type works
Heritage applications concern listed buildings and conservation areas. Listed building consent is needed for works, inside or out, that affect the special interest of a listed building, and carrying out such works without consent is a criminal offence. The council weighs harm to the heritage asset against any public benefit of the proposal.
More on heritage and listed buildings applications in our guide
Nearby applications
Within 500 metres
-
26/00177/LBC Awaiting decision
Comann Eachdraidh Uibhist A Tuath Old Carinish School Carinish Clachan Isle Of North Uist HS6 5EJ
Alter and extend heritage centre, removing raised floors, internal steps and lift in the original school building restore original floor levels, install underfloor heating in these areas, install upgraded wall and roof insulation, extend the collection resource centre, new entrance and additional exhibition area, convert boiler room to launderette, install roof mounted PV panels, upgrade schoolhouse for use as heritage holiday let including new windows, doors, insulation and re-slating the roof.
-
26/00152/PPD Awaiting decision
Comann Eachdraidh Uibhist A Tuath Old Carinish School Carinish Clachan Isle Of North Uist HS6 5EJ
Alterations and extensions to: heritage centre, collection resource centre, exhibition area, boundary wall; provision of: launderette, additional parking; installation of: new roof, roof mounted PV panels, air source heat pumps, ground source heat pump bore holes, steps, defibrillator unit, hardstanding for food trailer, cattle grid, gate; replacement windows and works to schoolhouse for use as a heritage holiday let; construct shed.
-
25/00463/PPD Awaiting decision
Kennels 19 Carinish Carinish Isle Of North Uist
Erection of dog boarding kennels and associated works.
-
25/00422/PPD Granted
Pod 2 Carinish Carinish Isle Of North Uist
Change of use of land to site 1 timber framed pod (caravan) for holiday accommodation. Install drainage, access and parking area
Other heritage and listed buildings applications
In Na h-Eileanan Siar
-
26/00256/LBC Awaiting decision
87 Horve Castlebay Isle Of Barra HS9 5XE
Refurbishment of existing black house, replacement of roof structure, roof covering, deconstruction and replacement of defective chimney. Replacement of external windows, doors and roof lights. Internal refurbishment.
-
26/00242/LBC Awaiting decision
Gowancroft 4 Goathill Crescent Stornoway Isle Of Lewis HS1 2TA
Internal alterations; convert window opening to door opening; install 3no. external vents.
-
26/00238/LBC Awaiting decision
10 Ormiclate Daliburgh Isle Of South Uist HS8 5SB
Erect residential annexe and external decking within curtilage of Category C listed dwellinghouse, to include part removal of boundary wall.
-
26/00194/LBC Awaiting decision
Ty Cymro Rushgarry Berneray Isle Of North Uist HS6 5BQ
Erection of annexe to provide ancillary accommodation to dwelling within the footprint of existing stone wall enclosure.
-
26/00177/LBC Awaiting decision
Comann Eachdraidh Uibhist A Tuath Old Carinish School Carinish Clachan Isle Of North Uist HS6 5EJ
Alter and extend heritage centre, removing raised floors, internal steps and lift in the original school building restore original floor levels, install underfloor heating in these areas, install upgraded wall and roof insulation, extend the collection resource centre, new entrance and additional exhibition area, convert boiler room to launderette, install roof mounted PV panels, upgrade schoolhouse for use as heritage holiday let including new windows, doors, insulation and re-slating the roof.