Planning application
Stornoway Airport Housing Development Melbost Point Isle Of Lewis
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Phased housing development to erect 94 houses on brownfield site with associated roads and infrastructure.
As published by the council, reference 25/00457/PPDM
Application record
- Reference
- 25/00457/PPDM
- Type
- Planning Permission (Detailed) Maj-Nat
- Status
- Decided
- Decision
- Granted As published: Application Permitted with conditions
- Received
- 8 Dec 2025
- Validated
- 11 Dec 2025
- Decided
- 23 Jun 2026
- Ward
- Steòrnabhagh A Deas
- Parish
- Sandwick
- Decision by
- Committe / Comhairle Decision
Site history
Applications at this address on the Na h-Eileanan Siar register
This site has had 3 applications since 2025: 2 approved, 0 refused.
-
25/00457/SCR_L Decided
Stornoway Airport Housing Development Melbost Point Isle Of Lewis
Phased housing development to erect 94 houses on brownfield site with associated roads and infrastructure.
-
25/00336/PAN Granted
Stornoway Airport Housing Development Melbost Point Isle Of Lewis
Proposed major housing development of 94 houses, roads, infrastructure, and recreation space (phased development).
Timeline
Dates from the published record
-
8 Dec 2025
Received by Na h-Eileanan Siar
-
11 Dec 2025
Validated
Checked as complete and ready for consideration.
-
23 Jun 2026
Decision issued: Application Permitted with conditions
-
27 Jul 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
- Scottishbuildingwarrant: 26/00118/ER_1MP (Approved)
- Scottishbuildingwarrant: 26/00217/AMDMP1 (Pending Consideration)
Who's behind it
Company information only, from the register and Companies House
CalMax Construction Ltd Applicant, a construction firm registered in Isle Of Lewis
Active · incorporated 1999 · Isle Of Lewis
9 applications on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
163 documents on file for this application
- 107 APPROVED TOPOGRAPHICAL SURVEY
- 104 APPROVED PHASING MASTERPLAN
- 105 APPROVED PHASE 1 AND 2 SITE PLAN
- 113 APPROVED PHASE 1 AND 2 LONGITUDINAL SECTION
- 111 APPROVED PHASE 1 AND 2 FOUL SEWER DRAINAGE
- 109 APPROVED PHASE 1 AND 2 SURFACE WATER DRAINAGE
- 108 APPROVED SITE SECTIONS A-A AND B-B
- 106 APPROVED PHASE 3 SITE PLAN
- 114 APPROVED PHASE 3 LONGITUDINAL SECTION
- 112 APPROVED PHASE 3 FOUL SEWER DRAINAGE
- 110 APPROVED PHASE 3 SURFACE WATER DRAINAGE
- 02 APPROVED SITE PLAN - PLANNING BOUNDARY
- 03 APPROVED SITE PLAN - GENERAL LAYOUT
- 08 APPROVED SITE PLAN - BOUNDARIES AND LEVEL CHANGES
- 07 APPROVED SITE PLAN - AMENITY AND CONNECTIVITY
- 04 APPROVED SITE PLAN - HOUSE TYPE LAYOUT
- 05 APPROVED SITE PLAN - SIGNAGE AND ROAD TREATMENT
- 10 APPROVED PLOTS 1 AND 2 - 2B4P - FLOOR PLAN
- 09 APPROVED PLOTS 1 AND 2 - 2B4P ELEVATIONS - A
- 12 APPROVED PLOTS 3 AND 4 - 2B4P - FLOOR PLAN
- 11 APPROVED PLOTS 3 AND 4 - 2B4P ELEVATIONS E
- 13 APPROVED PLOTS 5 AND 6 - 4B6P ELEVATIONS B2
- 16 APPROVED PLOTS 7 AND 8 - 3B5P - FLOOR PLAN
- 15 APPROVED PLOTS 7 AND 8 - 3B5P ELEVATIONS N
- 18 APPROVED PLOTS 9 AND 10 - 2B4P - FLOOR PLAN
- 17 APPROVED PLOTS 9 AND 10 - 2B4P ELEVATIONS M
- 20 APPROVED PLOTS 11 AND 12 - 2B4P - FLOOR PLAN
- 19 APPROVED PLOTS 11 AND 12 - 2B4P ELEVATIONS C2
- 21 APPROVED PLOTS 13 AND 14 - 4B6P ELEVATIONS E
- 24 APPROVED PLOTS 15 AND 16 - 2B4P - FLOOR PLAN
- 23 APPROVED PLOTS 15 AND 16 - 2B4P ELEVATIONS O
- 25 APPROVED PLOTS 17 AND 18 - 4B6P ELEVATIONS C
- 27 APPROVED PLOTS 19 AND 20 - 4B6P ELEVATIONS O2
- 30 APPROVED PLOTS 21 AND 22 - 2B4P - FLOOR PLAN
- 29 APPROVED PLOTS 21 AND 22 - 2B4P ELEVATIONS E
- 32 APPROVED PLOTS 23 AND 24 - 2B4P - FLOOR PLAN
- 31 APPROVED PLOTS 23 AND 24 - 2B4P ELEVATIONS M
- 34 APPROVED PLOTS 25 AND 26 - 2B4P - FLOOR PLAN
- 33 APPROVED PLOTS 25 AND 26 - 2B4P ELEVATIONS C
- 36 APPROVED PLOTS 27 AND 28 - 3B5P - FLOOR PLAN
- 35 APPROVED PLOTS 27 AND 28 - 3B5P ELEVATIONS N
- 38 APPROVED PLOTS 29 AND 39 - 2B4P - FLOOR PLAN
- 37 APPROVED PLOTS 29 AND 30 - 2B4P ELEVATIONS O
- 40 APPROVED PLOTS 31 AND 32 - 3B5P - FLOOR PLAN
- 39 APPROVED PLOTS 31 AND 32 - 3B5P ELEVATIONS E
- 42 APPROVED PLOTS 33 AND 34 - 3B5P - FLOOR PLAN
- 41 APPROVED PLOTS 33 AND 34 - 3B5P ELEVATIONS A
- 44 APPROVED PLOTS 35 AND 36 - 3B5P - FLOOR PLAN
- 43 APPROVED PLOTS 35 AND 36 - 3B5P ELEVATIONS B
- 46 APPROVED PLOTS 37 AND 38 - 2B4P - FLOOR PLAN
- 45 APPROVED PLOTS 37 AND 38 - 2B4P ELEVATIONS N
- 48 APPROVED PLOTS 39 AND 40 - 3B5P - FLOOR PLAN
- 47 APPROVED PLOTS 39 AND 40 - 3B5P ELEVATIONS M
- 50 APPROVED PLOTS 41 AND 42 - 3B5P - FLOOR PLAN
- 49 APPROVED PLOTS 41 AND 42 - 3B5P ELEVATIONS STEPPED D
- 52 APPROVED PLOTS 43 AND 44 - 3B5P - FLOOR PLAN
- 51 APPROVED PLOTS 43 AND 44 - 3B5P ELEVATIONS M
- 54 APPROVED PLOTS 45 AND 46 - 2B4P - FLOOR PLAN
- 53 APPROVED PLOTS 45 AND 46 - 2B4P ELEVATIONS A
- 56 APPROVED PLOTS 47 AND 48 - 2B4P - FLOOR PLAN
- 55 APPROVED PLOTS 47 AND 48 - 2B4P ELEVATIONS N
- 58 APPROVED PLOTS 49 AND 50 - 2B4P - FLOOR PLAN
- 57 APPROVED PLOTS 49 AND 50 - 2B4P ELEVATIONS O
- 60 APPROVED PLOTS 51 AND 52 - 2B4P - FLOOR PLAN
- 59 APPROVED PLOTS 51 AND 52 - 2B4P ELEVATIONS M
- 62 APPROVED PLOTS 53 AND 54 - 3B5P - FLOOR PLAN
- 61 APPROVED PLOTS 53 AND 54 - 3B5P ELEVATIONS D
- 64 APPROVED PLOTS 55 AND 56 - 2B4P - FLOOR PLAN
- 63 APPROVED PLOTS 55 AND 56 - 2B4P ELEVATIONS STEPPED A
- 66 APPROVED PLOTS 57 AND 58 - 2B4P - FLOOR PLAN
- 65 APPROVED PLOTS 57 AND 58 - 2B4P ELEVATIONS E
- 68 APPROVED PLOTS 59 AND 60 - 2B4P - FLOOR PLAN
- 67 APPROVED PLOTS 59 AND 60 - 2B4P ELEVATIONS C
- 70 APPROVED PLOTS 61 AND 62 - 2B4P - FLOOR PLAN
- 69 APPROVED PLOTS 61 AND 62 - 2B4P ELEVATIONS M
- 72 APPROVED PLOTS 63 AND 64 - 3B5P - FLOOR PLAN
- 71 APPROVED PLOTS 63 AND 64 - 3B5P ELEVATIONS N
- 74 APPROVED PLOTS 65 AND 66 - 3B5P - FLOOR PLAN
- 73 APPROVED PLOTS 65 AND 66 - 3B5P ELEVATIONS O
- 76 APPROVED PLOTS 67 AND 68 - 2B4P - FLOOR PLAN
- 75 APPROVED PLOTS 67 AND 68 - 2B4P ELEVATIONS C2
- 78 APPROVED PLOTS 69 AND 70 - 3B5P - FLOOR PLAN
- 77 APPROVED PLOTS 69 AND 70 - 3B5P ELEVATIONS N
- 80 APPROVED PLOTS 71 AND 72 - 2B4P - FLOOR PLAN
- 79 APPROVED PLOTS 71 AND 72 - 2B4P ELEVATIONS M
- 82 APPROVED PLOTS 73 AND 74 - 2B4P - FLOOR PLAN
- 81 APPROVED PLOTS 73 AND 74 - 2B4P ELEVATIONS C
- 84 APPROVED PLOTS 75 AND 76 - 3B5P - FLOOR PLAN
- 83 APPROVED PLOTS 75 AND 76 - 3B5P ELEVATIONS B
- 85 APPROVED PLOTS 77 AND 78 - 4B6P ELEVATIONS O2
- 87 APPROVED PLOTS 79 AND 80 - 4B6P ELEVATIONS C2
- 90 APPROVED PLOTS 81 AND 82 - 3B5P - FLOOR PLAN
- 89 APPROVED PLOTS 81 AND 82 - 3B5P ELEVATIONS D
- 91 APPROVED PLOTS 83 AND 84 - 4B6P ELEVATIONS B2
- 94 APPROVED PLOTS 85 AND 86 - 2B4P - FLOOR PLAN
- 93 APPROVED PLOTS 85 AND 86 - 2B4P ELEVATIONS O
- 96 APPROVED PLOTS 87 AND 88 - 3B5P - FLOOR PLAN
- 95 APPROVED PLOTS 87 AND 88 - 3B5P ELEVATIONS N
- 98 APPROVED PLOTS 89 AND 90 - 3B5P - FLOOR PLAN
- 97 APPROVED PLOTS 89 AND 90 - 3B5P ELEVATIONS M
- 99 APPROVED PLOTS 91 AND 92 - 4B6P ELEVATIONS E
- 102 APPROVED PLOTS 93 AND 94 - 3B5P - FLOOR PLAN
- 101 APPROVED PLOTS 93 AND 94 - 3B5P ELEVATIONS B
- 01 APPROVED LOCATION PLAN
- 103 APPROVED SITE PLAN - FINISHES
- 06 APPROVED SITE PLAN - PLAYPARK DETAILS
- 14 APPROVED PLOTS 5 AND 6 - 4B6P - FLOOR PLAN
- 22 APPROVED PLOTS 13 AND 14 - 4B6P - FLOOR PLAN
- 26 APPROVED PLOTS 17 AND 18 - 4B6P - FLOOR PLAN
- 28 APPROVED PLOTS 19 AND 20 - 4B6P - FLOOR PLAN
- 86 APPROVED PLOTS 77 AND 78 - 4B6P - FLOOR PLAN
- 88 APPROVED PLOTS 79 AND 80 - 4B6P - FLOOR PLAN
- 92 APPROVED PLOTS 83 AND 84 - 4B6P - FLOOR PLAN
- 100 APPROVED PLOTS 91 AND 92 - 4B6P - FLOOR PLAN
- 115 APPROVED EMERGENCY EGRESS ROUTE
- DECISION NOTICE
- PLANNING APPLICATION BOARD MINUTES
- TENURE AND HANDOVER STRATEGY
- REPORT TO COMHAIRLE 01.04.26
- APPENDIX 1 - CONDITIONS
- APPENDIX 2 - PLANS
- APPENDIX 3 - CONSULTATION RESPONSES
- APPENDIX 4A - REPRESENTATIONS
- APPENDIX 4B - REPRESENTATION
- APPENDIX 4C - REPRESENTATION-ADDITIONAL COMMENTS
- APPENDIX 4D - ADDITIONAL TO REP 06
- LOCAL FLOOD RISK MANAGEMENT PLAN
- SCREENING OPINION - REF 25/00457/SCR_L
- BUILDING STANDARDS RESPONSE
- ROADS CONSULT RESPONSE
- CNES FLOOD RISK RESPONSE
- CNES HOUSING RESPONSE
- PLANNING SUPPORT STATEMENT
- PLANNING SUPPORT STATEMENT ADDENDUM
- COMMUNITY BENEFIT STATEMENT
- FLOOD RISK MAP OVERLAY
- FLOOD RISK CONSULTANT'S REPORT
- SANDWICK COMMUNITY COUNCIL
- HIAL RESPONSE UPDATED
- HIAL
- SEPA RESPONSE
- ARCHAEOLOGICAL RESPONSE:
- SG ADVERT 18.12.25
- SSEN
- SCOTTISH WATER
- SEPA RESPONSE
- EDUCATION
- ENVIRONMENTAL HEALTH
- NATS SAFEGUARDING
- CLEANSING
- LIST OF NEIGHBOURS NOTIFIED
- FINISHES SCHEDULE
- FRA - SURFACE WATER PIPE NETWORK DESIGN CALCULATIONS
- FRA - DETENTION BASIN CAPACITY DESIGN PHASE 1 AND 2 CALCULATIONS
- FRA - DETENTION BASIN CAPACITY DESIGN PHASE 3 CALCULATIONS
- FRA - SURFACE WATER PIPE NETWORK DESIGN PHASE 3 CALCULATIONS
- APPLICATION FORM
- DESIGN AND ACCESS STATEMENT
- BIRD MANAGEMENT PLAN
- PAC REPORT
- FRA - COASTAL FLOOD RISK CALCULATIONS
- FLOOD RISK ASSESSMENT (FRA))
- FRA - TIDE LEVEL CALCULATIONS
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Na h-Eileanan Siar granted permission on 23 June 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Stornoway Airport Housing Development Melbost Point Isle Of Lewis
Phased housing development to erect 94 houses on brownfield site with associated roads and infrastructure.
Decided Outline 12 docsMajor scheme
Other full applications
In Na h-Eileanan Siar
-
23/00507/PPD Granted
Workshop Carloway Pier Knock Carloway Isle Of Lewis
Site portable unit for a community workshop for marine plastic recycling solutions
-
26/00301/PPD Granted
Storage Container Port Of Ness Ness Isle Of Lewis
Siting of 3x shipping containers.
-
26/00293/PPD Granted
Uig Sands Restaurant Timsgarry Uig Isle Of Lewis HS2 9ET
Erect storage building
-
26/00100/PPD Granted
Alex Murray (Construction) Ltd Blar Buidhe Rathad Shim Stornoway Isle Of Lewis HS1 2UT
Change of use of former care home into suis generis non-domestic multi-occupancy residential use for 27 accommodation rooms and up to 15 staff on site. Associated works including: widen existing vehicular access; expanded parking area; install air source heat pumps; roof mounted solar panels; installed 1.8m high timber fencing; revised window openings and replacement doors; existing timber cladding replaced with cement board; single dormer removed on north elevation. Erect 2no. timber gazebos. Erect plant room.
-
26/00342/PPD Granted
Royal Bank Of Scotland 17 North Beach Stornoway Isle Of Lewis HS1 2XH
Paint front door and handrails black. Remove painted metal panels in select windows and replace with glazing.