Planning application
Studio East Camp Balivanich Isle Of Benbecula
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erect art therapy studio with associated surface water drainage and access path
As published by the council, reference 25/00390/PPD
Application record
- Reference
- 25/00390/PPD
- Type
- Planning Permission (Detailed)
- Status
- Decided
- Decision
- Granted As published: Application Permitted
- Received
- 23 Oct 2025
- Validated
- 29 Oct 2025
- Decided
- 24 Apr 2026
- Ward
- Uibhist A Deas,Eirisgeigh,Beinn Faoghla
- Parish
- Benbecula
- Decision by
- Delegate Decision
Timeline
Dates from the published record
-
23 Oct 2025
Received by Na h-Eileanan Siar
-
29 Oct 2025
Validated
Checked as complete and ready for consideration.
-
24 Apr 2026
Decision issued: Application Permitted
-
27 Jul 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Studio Hebridies Architecture Ltd Agent, an architecture practice
5 applications on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
16 documents on file for this application
- 02A APPROVED LOCATION PLAN 1-500
- 04A APPROVED ELEVATIONS AND FLOOR PLAN
- 05 APPROVED TOPOGRAPHICAL LEVELS
- 03B APPROVED SITE PLAN
- 01B APPROVED LOCATION PLAN 1-1250
- DECISION NOTICE
- REPORT ON HANDLING
- FLOOD RESPONSE
- ROADS - RESPONSE
- HIAL - RESPONSE
- PLANNING STATEMENT
- SG ADVERT 06 NOV 2025
- BUILDING STANDARDS - RESPONSE
- HIAL - RESPONSE
- LIST OF NEIGHBOURS NOTIFIED
- APPLICATION FORM
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Na h-Eileanan Siar granted permission on 24 April 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
22A Balivanich Isle Of Benbecula
99% historically approved · decision due ~27 Nov
Form new access road and erect house
Awaiting decision Outline 7 docs -
-
-
Ospadal Uibhist Agus Bharraigh Balivanich Isle Of Benbecula HS7 5LA
Erect community equipment service facility
Granted Full applications 11 docs -
-
SGRPID Office Balivanich Isle Of Benbecula HS7 5LA
External overclad and re-roofing works
Granted Full applications 17 docs
Other full applications
In Na h-Eileanan Siar
-
23/00507/PPD Granted
Workshop Carloway Pier Knock Carloway Isle Of Lewis
Site portable unit for a community workshop for marine plastic recycling solutions
-
26/00301/PPD Granted
Storage Container Port Of Ness Ness Isle Of Lewis
Siting of 3x shipping containers.
-
26/00293/PPD Granted
Uig Sands Restaurant Timsgarry Uig Isle Of Lewis HS2 9ET
Erect storage building
-
26/00100/PPD Granted
Alex Murray (Construction) Ltd Blar Buidhe Rathad Shim Stornoway Isle Of Lewis HS1 2UT
Change of use of former care home into suis generis non-domestic multi-occupancy residential use for 27 accommodation rooms and up to 15 staff on site. Associated works including: widen existing vehicular access; expanded parking area; install air source heat pumps; roof mounted solar panels; installed 1.8m high timber fencing; revised window openings and replacement doors; existing timber cladding replaced with cement board; single dormer removed on north elevation. Erect 2no. timber gazebos. Erect plant room.
-
26/00342/PPD Granted
Royal Bank Of Scotland 17 North Beach Stornoway Isle Of Lewis HS1 2XH
Paint front door and handrails black. Remove painted metal panels in select windows and replace with glazing.