Skip to content
PlanIndex Get alerts
Menu

Planning application

SGN Ltd 1 Newton Gateway Stornoway Isle Of Lewis

Granted Na h-Eileanan Siar 25/00333/PPD Planning Permission (Detailed)

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of Class 4 office building with associated access, drainage and landscaping.

As published by the council, reference 25/00333/PPD

Application record

Reference
25/00333/PPD
Type
Planning Permission (Detailed)
Status
Decided
Decision
Granted As published: Application Permitted with conditions
Received
19 Sep 2025
Validated
7 Oct 2025
Decided
8 Dec 2025
Ward
Steòrnabhagh A Deas
Parish
Stornoway
Decision by
Delegate Decision

Timeline

Dates from the published record

  1. 19 Sep 2025

    Received by Na h-Eileanan Siar

  2. 7 Oct 2025

    Validated

    Checked as complete and ready for consideration.

  3. 8 Dec 2025

    Decision issued: Application Permitted with conditions

  4. 27 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Redline Planning Agent, a planning consultancy registered in Motherwell

Dissolved · incorporated 2011 · Motherwell

15 applications on PlanIndex · across 7 councils · 100% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

SGN Ltd Applicant, registered in Dunmow

Active · incorporated 2016 · Dunmow

10 applications on PlanIndex · across 5 councils · 100% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

40 documents on file for this application

  • 12 APPROVED DRAINAGE DETAIL Drawing · 08 Dec 2025
  • 01 APPROVED LOCATION PLAN Drawing · 08 Dec 2025
  • 16 APPROVED PLANTING PLAN Drawing · 08 Dec 2025
  • 11 APPROVED PROPOSED DRAINAGE LAYOUT 2 Drawing · 08 Dec 2025
  • 03 APPROVED PROPOSED ELEVATIONS Drawing · 08 Dec 2025
  • 06 APPROVED PROPOSED LEVELS Drawing · 08 Dec 2025
  • 04 APPROVED PROPOSED FLOOR PLAN Drawing · 08 Dec 2025
  • 05 APPROVED SITE SECTIONS Drawing · 08 Dec 2025
  • ROADS ACCESS DRAWING Drawing · 08 Dec 2025
  • 02A APPROVED PROPSOED SITE LAYOUT Drawing · 08 Dec 2025
  • DECISION NOTICE Decision Notice · 08 Dec 2025
  • REPORT ON HANDLING Report - Delegated · 08 Dec 2025
  • ROADS Consultation · 20 Nov 2025
  • ROAD OPEING APPLICATION FORM Other · 20 Nov 2025
  • ROAD DRAINAGE/FLOODS/INFRASTRUCTURE Consultation · 18 Nov 2025
  • BUILDING STANDARDS RESPONSE Consultation · 17 Nov 2025
  • ENVIRONMENTAL HEALTH Consultation · 27 Oct 2025
  • SG ADVERT Other · 23 Oct 2025
  • SCOTTISH WATER Consultation · 16 Oct 2025
  • NATS - RESPONSE Consultation · 10 Oct 2025
  • BIODIVERSITY STATEMENT Supporting Information · 19 Sep 2025
  • BUILDING VISUALISATION Supporting Information · 19 Sep 2025
  • 10 CONSTRUCTION DETAIL Drawing · 19 Sep 2025
  • SUPPORTING STATEMENT Supporting Information · 19 Sep 2025
  • DRAINAGE STRATEGY Supporting Information · 19 Sep 2025
  • 17 EXISTING DRAINAGE AND UTILITIES Drawing · 19 Sep 2025
  • 15 EXTENT OF CONTAMINATION Drawing · 19 Sep 2025
  • GAS BARRIER SPEC Supporting Information · 19 Sep 2025
  • GAS VENT MAT SPEC Supporting Information · 19 Sep 2025
  • GEOTECH SITE APPRAISAL Supporting Information · 19 Sep 2025
  • 09 KERBING LAYOUT Drawing · 19 Sep 2025
  • MAINTENANCE SCHEDULE Supporting Information · 19 Sep 2025
  • MANHOLE SCHEDULE Supporting Information · 19 Sep 2025
  • APPLICATION FORM Application Form · 19 Sep 2025
  • 14 POST DEVELOPMENT SURFACE WATER ROUTE Drawing · 19 Sep 2025
  • 13 PRE DEVELOPMENT SURFACE WATER ROUTE Drawing · 19 Sep 2025
  • PROPOSED DRAINAGE NOTES Supporting Information · 19 Sep 2025
  • 08 ROAD AND PAVEMENT LAYOUT Drawing · 19 Sep 2025
  • 07 SWEPT PATH Drawing · 19 Sep 2025
  • VIEWPOINTS Supporting Information · 19 Sep 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Na h-Eileanan Siar granted permission on 8 December 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Na h-Eileanan Siar

  • 23/00507/PPD Granted

    Workshop Carloway Pier Knock Carloway Isle Of Lewis

    Site portable unit for a community workshop for marine plastic recycling solutions

    Received 12 Nov, published by the council 4 Aug 2026 Full applications
  • 26/00301/PPD Granted

    Storage Container Port Of Ness Ness Isle Of Lewis

    Siting of 3x shipping containers.

    Received 5 Aug, published by the council 22 Aug 2026 Full applications
  • 26/00293/PPD Granted

    Uig Sands Restaurant Timsgarry Uig Isle Of Lewis HS2 9ET

    Erect storage building

    Received 27 Jul, published by the council 4 Aug 2026 Full applications
  • 26/00100/PPD Granted

    Alex Murray (Construction) Ltd Blar Buidhe Rathad Shim Stornoway Isle Of Lewis HS1 2UT

    Change of use of former care home into suis generis non-domestic multi-occupancy residential use for 27 accommodation rooms and up to 15 staff on site. Associated works including: widen existing vehicular access; expanded parking area; install air source heat pumps; roof mounted solar panels; installed 1.8m high timber fencing; revised window openings and replacement doors; existing timber cladding replaced with cement board; single dormer removed on north elevation. Erect 2no. timber gazebos. Erect plant room.

    Received 13 Mar, published by the council 27 Jul 2026 Full applications
  • 26/00342/PPD Granted

    Royal Bank Of Scotland 17 North Beach Stornoway Isle Of Lewis HS1 2XH

    Paint front door and handrails black. Remove painted metal panels in select windows and replace with glazing.

    Received 28 Aug, published by the council 1 Sep 2026 Full applications