Planning application
Care Unit 1 Rubha Doigheag Eochar Isle Of South Uist HS8 5RL
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Install air source heat pump
As published by the council, reference 12/00120/PPD
Application record
- Reference
- 12/00120/PPD
- Type
- Planning Permission (Detailed)
- Status
- Decided
- Decision
- Granted As published: Application Permitted with conditions
- Received
- 1 Mar 2012
- Validated
- 8 Mar 2012
- Decided
- 16 Apr 2012
- Ward
- Barraigh Agus Uibhist A Deas
- Decision by
- Delegate Decision
- Postcode
- HS8 5RL
Timeline
Dates from the published record
-
1 Mar 2012
Received by Na h-Eileanan Siar
-
8 Mar 2012
Validated
Checked as complete and ready for consideration.
-
16 Apr 2012
Decision issued: Application Permitted with conditions
-
1 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Tuzo Surveys Agent, a surveying firm
2 applications on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
11 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Na h-Eileanan Siar granted permission on 16 April 2012, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Walking Path Clachan Eochar Isle Of South Uist
99% historically approved · decision due ~6 Jul
Construction of a 3m (min) wide path (conventional footway and boardwalk), including crossings over public road. (Amendment to previous consent 23/00351/PPD)
Awaiting decision Full applications 9 docs -
Church Buaile Dubh Eochar Isle Of South Uist HS8 5RQ
Conversion of Category C Listed church building to residential dwelling. Partial demolition of boundary wall. Extension to side and rear. Internal alterations. Rooflights to existing roof. Replacement of doors and windows.
Granted Heritage and listed buildings Extension Loft or dormer +3 17 docsSmall domestic -
Church Buaile Dubh Eochar Isle Of South Uist HS8 5RQ
Convert Church to house and erect extension
Granted Full applications Extension 21 docs
Other full applications
In Na h-Eileanan Siar
-
23/00507/PPD Granted
Workshop Carloway Pier Knock Carloway Isle Of Lewis
Site portable unit for a community workshop for marine plastic recycling solutions
-
26/00301/PPD Granted
Storage Container Port Of Ness Ness Isle Of Lewis
Siting of 3x shipping containers.
-
26/00293/PPD Granted
Uig Sands Restaurant Timsgarry Uig Isle Of Lewis HS2 9ET
Erect storage building
-
26/00100/PPD Granted
Alex Murray (Construction) Ltd Blar Buidhe Rathad Shim Stornoway Isle Of Lewis HS1 2UT
Change of use of former care home into suis generis non-domestic multi-occupancy residential use for 27 accommodation rooms and up to 15 staff on site. Associated works including: widen existing vehicular access; expanded parking area; install air source heat pumps; roof mounted solar panels; installed 1.8m high timber fencing; revised window openings and replacement doors; existing timber cladding replaced with cement board; single dormer removed on north elevation. Erect 2no. timber gazebos. Erect plant room.
-
26/00342/PPD Granted
Royal Bank Of Scotland 17 North Beach Stornoway Isle Of Lewis HS1 2XH
Paint front door and handrails black. Remove painted metal panels in select windows and replace with glazing.