Planning application
Craigard House 5 Tolstachaolais Isle Of Lewis HS2 9DW
Works: Extension Roofing Demolition Windows or glazing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Exisitng bay window to be demolished and new conservatory constructed. Construct extension above existing kitchen. New roof and gable end on existing Black House.
As published by the council, reference 10/00600/PPD
Application record
- Reference
- 10/00600/PPD
- Type
- Planning Permission (Detailed)
- Status
- Decided
- Decision
- Application Permitted with conditions
- Received
- 4 Nov 2010
- Validated
- 10 Nov 2010
- Decided
- 7 Jan 2011
- Ward
- Sgir' Uige Agus Ceann A Tuath Nan Loch
- Decision by
- Delegated Decision
- Postcode
- HS2 9DW
Timeline
Dates from the published record
-
4 Nov 2010
Received by Na h-Eileanan Siar
-
10 Nov 2010
Validated
Checked as complete and ready for consideration.
-
7 Jan 2011
Decision issued: Application Permitted with conditions
-
1 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
-
Aros Tolstachaolais Isle Of Lewis HS2 9DW
Alterations and extension to existing house
Granted Full applications Extension 6 docs -
-
-
-
Calanna 8B Tolstachaolais Isle Of Lewis HS2 9DW
Erect House and construct Access Road
Granted Full applications
Other full applications applications
In Na h-Eileanan Siar
-
23/00507/PPD Granted
Workshop Carloway Pier Knock Carloway Isle Of Lewis
Site portable unit for a community workshop for marine plastic recycling solutions
-
26/00082/PPD Granted
Creed Lodge Lochs Road Lochs Isle Of Lewis HS2 9JN
Erect small single storey extension to Grade C listed building. Replace existing windows.
-
26/00229/PPD Granted
8 Leanish Castlebay Isle Of Barra HS9 5UW
Extension to rear of property
-
26/00227/PPD Granted
Pod 3 Borve Berneray Isle Of North Uist
Change of use of Land to site a caravan (pod) for use for short term holiday let with associated access and infrastructure
-
26/00222/PPD Granted
Chalets 244 Bruernish Northbay Isle Of Barra
Change of use of land to Site 2no. Caravans (pods) to be used for short term let & create access road and parking and install drainage