Planning application
Site B Wester Burthill Farm Roseisle Elgin Moray
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Revise house design approved under ref 16/00081/APP on
As published by the council, reference 26/01054/APP
Application record
- Reference
- 26/01054/APP
- Type
- Application for Planning Permission
- Status
- Awaiting decision
- Received
- 20 Aug 2026
- Validated
- 28 Aug 2026
- Ward
- Heldon And Laich
- Parish
- Heldon
- Decision by
- Delegated Power
Comment by 15 September 2026
The council is taking comments on this application until then. Have your say on Moray's portal.
Timeline
Dates from the published record
-
20 Aug 2026
Received by Moray
-
28 Aug 2026
Validated
Checked as complete and ready for consideration.
-
29 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 23 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Moray took a median of 82 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with Moray for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Plot 4 Wester Buthill Farm Roseisle Elgin Moray
97% historically approved · decision due ~23 Oct
Revise house design approved under 07/00666/FUL on
Awaiting decision Full applications 7 docs -
Site A Wester Buthill Farm Roseisle Elgin Moray
97% historically approved · decision due ~23 Oct
Revise house design approved under ref 08/00397FUL and 13/00238/APP on
Awaiting decision Full applications 7 docs -
Bruntland View Wester Buthill Roseisle Elgin Moray IV30 5YQ
Proposed internal alterations attic conversion and formation of balcony at
Granted Full applications Loft or dormer 6 docs -
3 The Old Steading Mid Buthill Roseisle Elgin Moray IV30 5YQ
Partial loft conversion at
Granted Full applications Loft or dormer 4 docs
Other full applications applications
In Moray
-
26/00390/APP Granted
Brodieshill Farmhouse Forres Moray IV36 2QU
Change of use of children's play unit to letting unit at
-
25/01064/APP Granted
Dunes 100 Metres East Of Last Beach Hut Hopeman East Beach Moray
Retrospective consent to site and operate a mobile sauna for 4 days a week on
-
26/00677/APP Granted
Rothes Tennis Club Rothes Recreation Park Station Street Rothes Moray
Change existing metal halide floodlighting to LED at
-
26/01105/APP Awaiting decision
27 Cuthil Road Keith Moray AB55 5AS
Retrospective application to replace timber garage with steel framed metal clad garage at
-
26/00757/APP Granted
Tarnash Farm Keith Moray AB55 5PB
Change of use from agricultural land to equestrian land with construction of riding area fencing and lighting poles at