Planning application
6 Seapark Lane Kinloss Forres Moray IV36 3SZ
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Retrospective consent to site ancillary accommodation at
As published by the council, reference 26/00991/APP
Application record
- Reference
- 26/00991/APP
- Type
- Application for Planning Permission
- Status
- Awaiting decision
- Received
- 7 Aug 2026
- Validated
- 10 Aug 2026
- Ward
- Forres
- Parish
- Findhorn & Kinloss
- Decision by
- Delegated Power
- Postcode
- IV36 3SZ
Site history
Applications at this address on the Moray register
This site has had 2 applications since 2021: 1 approved, 0 refused.
-
21/01836/APP Granted
6 Seapark Lane Kinloss Forres Moray IV36 3SZ
Siting of 1 residential caravan and 1 storage caravan during house construction at
Timeline
Dates from the published record
-
7 Aug 2026
Received by Moray
-
10 Aug 2026
Validated
Checked as complete and ready for consideration.
-
16 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 5 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Moray took a median of 82 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
- Application: 17/00780/APP (Decided)
- Application: 21/01836/APP (Decided)
Documents
Plans, drawings, consultee responses and the officer's report
13 documents on file for this application
- FORRES GAZETTE - 26.08.2026
- MORAY FLOOD RISK MANAGEMENT
- TRANSPORTATION MANAGER
- ENVIRONMENTAL HEALTH
- CONTAMINATED LAND
- SCOTTISH WATER
- FLOOR PLAN OF ANCILLARY ACCOMMODATION
- DRAINAGE PLAN
- ELEVATIONS
- LOCATION PLAN
- APPLICATION FOR PLANNING PERMISSION
- SUPPORTING STATEMENT
- SITE PLAN
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Moray for determination, against a statutory target of eight weeks. Over the last year Moray decided full applications in a median of 92 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
6 Seapark Lane Kinloss Forres Moray IV36 3SZ
Siting of 1 residential caravan and 1 storage caravan during house construction at
Granted Full applications 6 docs -
Woodland To West Of Seapark House Seapark Estate Kinloss Forres Moray
Section 42 application to develop land without compliance with conditions 12 of planning permission 15/01605/PPP to amend the means of vehicular egress/exit from the site by altering the boundary walling to No 7 Seapark Road thus creating an acceptable visibility splay at
Granted Full applications 5 docs -
Plot 3 And Plot 6 Seapark House Kinloss Moray
Erect 2no dwellinghouse and garages on
Granted Full applications 18 docsSeveral homes -
Domestic
-
Green Garth Seapark Road Kinloss Forres Moray IV36 3TJ
Erect porch to front of property at
Granted Full applications Extension 6 docsSmall domestic -
Plot 1 R3 Kinloss Forres Moray
Rotate position house on Plot 1 previously approved on 17/01906/APP on
Granted Full applications 6 docs
Other full applications
In Moray
-
26/00390/APP Granted
Brodieshill Farmhouse Forres Moray IV36 2QU
Change of use of children's play unit to letting unit at
-
25/01064/APP Granted
Dunes 100 Metres East Of Last Beach Hut Hopeman East Beach Moray
Retrospective consent to site and operate a mobile sauna for 4 days a week on
-
26/00677/APP Granted
Rothes Tennis Club Rothes Recreation Park Station Street Rothes Moray
Change existing metal halide floodlighting to LED at
-
26/01105/APP Awaiting decision
27 Cuthil Road Keith Moray AB55 5AS
Retrospective application to replace timber garage with steel framed metal clad garage at
-
26/00757/APP Granted
Tarnash Farm Keith Moray AB55 5PB
Change of use from agricultural land to equestrian land with construction of riding area fencing and lighting poles at