Planning application
Land To West Of Station Road Dufftown Moray
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Install a turning space and a pedestrian access track on
As published by the council, reference 26/00194/APP
Application record
- Reference
- 26/00194/APP
- Type
- Application for Planning Permission
- Status
- Decided
- Decision
- Granted As published: Permitted
- Received
- 13 Feb 2026
- Validated
- 17 Feb 2026
- Decided
- 7 May 2026
- Ward
- Speyside Glenlivet
- Parish
- Dufftown & District
- Decision by
- Delegated Power
Timeline
Dates from the published record
-
13 Feb 2026
Received by Moray
-
17 Feb 2026
Validated
Checked as complete and ready for consideration.
-
7 May 2026
Decision issued: Permitted
-
27 Jul 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Dalcour Maclaren Ltd Agent, registered in Bicester
Active · incorporated 2003 · Bicester
420 applications on PlanIndex · across 90 councils · 67% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordScotland Gas Networks Applicant, registered in Edinburgh
Active · incorporated 2004 · Edinburgh
1 application on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
12 documents on file for this application
- DECISION NOTICE - APPROVED
- REPORT OF HANDLING
- DRAINAGE CONSTRUCTION DETAILS
- PROPOSED DRAINAGE LAYOUT
- CONSTRUCTION DETAILS (SHEET 2 OF 2)
- SITE ENTRANCE LONGITUDINAL SECTION
- VEHICLE TRACKING AT TURNING SPACE
- VISIBILITY LONGITUDINAL SECTIONS
- JUNCTION VISIBILITY SPLAY LAYOUT
- LOCATION PLAN
- PROPOSED GROUND INVESTIGATION LAYOUT
- SITE LAYOUT PLAN
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Moray granted permission on 7 May 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Balvenie Gardens Dufftown Keith Moray AB55 4BD
Alterations and change of use from residential property to commercial office space at
Granted Full applications 6 docs -
Glenfiddich Distillery Castle Road Dufftown Keith Moray AB55 4DH
Part internal refurbishment of existing building extension and associated external works
Granted Full applications Extension 11 docs -
1 And 2 Balvenie Distillery Cottages Dufftown Keith Moray AB55 4BB
Alterations and change of use at cottages from residential cottages used for storage to commercial offices and archive storage at Glenfiddich Distillery
Granted Full applications 9 docs -
Balvenie Distillery Dufftown Keith Moray AB55 4BB
96% historically approved · decision due ~31 Mar
Hazardous Substance Consent increase in ethanol and diesel at
Awaiting decision Other 14 docs
Other full applications
In Moray
-
26/00863/APP Granted
30 - 32 Mid Street Keith Moray
Internal alterations and extensions for two townhouses at
-
26/00898/APP Granted
4 Seafield Place Cullen Buckie Moray AB56 4TF
Erect single storey extension at
-
26/00868/APP Granted
The Breamou Inn 1 Cooper Street Hopeman Elgin Moray IV30 5SD
Alter and extend existing bar/restaurant at
-
26/00840/APP Granted
30 Crown Street Portgordon Buckie Moray AB56 5RD
Single storey rear extension including surface water soakaway at
-
26/00979/APP Granted
Delnabo Keepers Cottage Tomintoul Ballindalloch Moray AB37 9HT
Extend dwellinghouse at