Skip to content
PlanIndex Get alerts
Menu

Planning application

Mary Kirk Alves Elgin Moray IV30 8UY

Granted Moray 25/01382/APP Application for Planning Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Amend design for previously approved conversion of church to dwellinghouse under planning consent 22/01839/APP and propose additional garage storage building and garden shed at

As published by the council, reference 25/01382/APP

Application record

Reference
25/01382/APP
Type
Application for Planning Permission
Status
Decided
Decision
Permitted
Received
21 Oct 2025
Validated
21 Oct 2025
Decided
27 Mar 2026
Ward
Heldon And Laich
Parish
Heldon
Decision by
Delegated Power
Postcode
IV30 8UY

Site history

Applications at this address on the Moray register

This site has had 3 applications since 2025: 2 approved, 0 refused.

  • 26/00131/LBC Granted

    Mary Kirk Alves Elgin Moray IV30 8UY

    Reduce height of part of cemetery wall separating the old cemetery from

    Decided 17 Mar 2026 Heritage and listed buildings
  • 25/01034/LBC Withdrawn

    Mary Kirk Alves Elgin Moray IV30 8UY

    Remove existing roof structure and replace with new roof structure based on traditional main trusses purlins and intermediate rafters at

    Decided 10 Feb 2026 Heritage and listed buildings

Timeline

Dates from the published record

  1. 21 Oct 2025

    Received by Moray

  2. 27 Mar 2026

    Decision issued: Permitted

  3. 27 Jul 2026

    Added to PlanIndex

Cases linked to this one on the register

  • Application: 11/00070/APP (Decided)
  • Application: 14/00509/APP (Decided)
  • Application: 22/01839/APP (Decided)
  • Application: 22/01916/LBC (Decided)
  • Application: 25/00842/LBC (Decided)
  • Application: 25/01034/LBC

Documents

Plans, drawings, consultee responses and the officer's report

16 documents on file for this application

  • NOTIFICATION OF INITIATION OF DEVELOPMENT Correspondence to Council · 30 Mar 2026
  • DECISION NOTICE - APPROVED Decision · 27 Mar 2026
  • REPORT OF HANDLING Decision · 27 Mar 2026
  • PROPOSED EAST AND WEST ELEVATIONS Approved Plan · 18 Mar 2026
  • PROPOSED NORTH AND SOUTH ELEVATIONS Approved Plan · 18 Mar 2026
  • PROPOSED SITE LAYOUT Approved Plan · 16 Feb 2026
  • SITE PLAN Approved Plan · 13 Feb 2026
  • SITE PLAN 1-500 Approved Plan · 13 Feb 2026
  • PROPOSED FLOOR PLANS Approved Plan · 21 Oct 2025
  • PROPOSED ROOF PLAN Approved Plan · 21 Oct 2025
  • PROPOSED ANCILLARY BUILDINGS Approved Plan · 21 Oct 2025
  • EXISTING FLOOR PLANS Drawing · 21 Oct 2025
  • EXISTING ROOF PLAN Drawing · 21 Oct 2025
  • EXISTING EAST AND WEST ELEVATIONS Drawing · 21 Oct 2025
  • EXISTING NORTH AND SOUTH ELEVATIONS Drawing · 21 Oct 2025
  • LOCATION PLAN Approved Plan · 21 Oct 2025

Trade members open them from here.

Open the documents

What this grant of permission means

Moray granted permission on 27 March 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Alves Old Parish Church Alves Moray

    25/00842/LBC Submitted 11 Jul 2025 9m away

    Convert church to a dwellinghouse and replace slate roof at

    Granted Heritage and listed buildings Roofing 12 docs
    Domestic
  • Mary Kirk Alves Elgin Moray IV30 8UY

    25/01034/LBC Submitted 21 Aug 2025 9m away

    Remove existing roof structure and replace with new roof structure based on traditional main trusses purlins and intermediate rafters at

    Withdrawn Heritage and listed buildings Roofing
  • Alves Old Parish Church Alves Moray

    22/01916/LBC Submitted 19 Dec 2022 9m away

    Convert church to dwellinghouse at

    Granted Heritage and listed buildings 21 docs
    Domestic
  • Mary Kirk Alves Elgin Moray IV30 8UY

    26/00131/LBC Submitted 3 Feb 2026 10m away

    Reduce height of part of cemetery wall separating the old cemetery from

    Granted Heritage and listed buildings 5 docs

In Moray

  • 26/00659/APP Granted

    The Lairds Apartment Brodie Castle Brodie Forres Moray IV36 2TE

    Change of use from short term let to apartment/rooms to be used as part of castle tour

    27 May 2026 Full applications
  • 26/00723/APP Granted

    6 Cuttlebrae Cottages Clochan Buckie Moray AB56 5HS

    Demolish existing extension erect new extension and alterations to dwellinghouse at

    9 Jun 2026 Full applications
  • 26/00260/APP Granted

    Glen Keith Distillery Station Road Keith Moray AB55 5BU

    Proposed extension to form chiller room at

    27 Feb 2026 Full applications
  • 26/00925/APP Granted

    214 Seatown Cullen Buckie Moray AB56 4SJ

    Alter and extend dwellinghouse at

    24 Jul 2026 Full applications
  • 26/01173/APP Awaiting decision

    Maryfield Findhorn Forres Moray IV36 3YY

    Renewal planning consent 23/00839/APP to alter dwellinghouse to form attic accommodation at

    14 Sep 2026 Full applications