Planning application
Glenernie Cottage Tolbooth Street Forres Moray IV36 1PH
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Installation of uPVC flood door and 3no airbricks at
As published by the council, reference 25/00959/LBC
Application record
- Reference
- 25/00959/LBC
- Type
- Listed Building Consent
- Status
- Decided
- Decision
- Permitted
- Received
- 7 Aug 2025
- Validated
- 18 Aug 2025
- Decided
- 21 Oct 2025
- Ward
- Forres
- Parish
- Forres
- Decision by
- Delegated Power
- Postcode
- IV36 1PH
Site history
Applications at this address on the Moray register
This site has had 2 applications since 2025: 2 approved, 0 refused.
-
25/00960/APP Granted
Glenernie Cottage Tolbooth Street Forres Moray IV36 1PH
Installation of uPVC flood door and 3no airbricks at
Timeline
Dates from the published record
-
7 Aug 2025
Received by Moray
-
18 Aug 2025
Validated
Checked as complete and ready for consideration.
-
21 Oct 2025
Decision issued: Permitted
-
27 Jul 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
- Application: 01/00600/LBC (Decided)
- Application: 13/00736/APP (Decided)
- Application: 13/00737/LBC (Decided)
- Application: 25/00960/APP (Decided)
Who's behind it
Company information only, from the register and Companies House
Scottish Water Applicant, registered in Glasgow
Active · incorporated 2000 · Glasgow
133 applications on PlanIndex · across 22 councils · 99% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
- DECISION NOTICE - APPROVED
- REPORT OF HANDLING
- EXISTING ELEVATION
- EXISTING FRONT DOOR
- EXISTING SITE PLAN
- LOCATION PLAN
- PROPOSED ELEVATIONS
- PROPOSED FRONT DOOR
- PROPOSED SITE PLAN
Trade members open them from here.
Open the documentsWhat this grant of permission means
Moray granted permission on 21 October 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Glenernie Cottage Tolbooth Street Forres Moray IV36 1PH
Installation of uPVC flood door and 3no airbricks at
Granted Full applications 11 docs -
Fern Villa Tolbooth Street Forres Moray IV36 1PH
Installation of 1no Smart Airbrick at
Granted Full applications 8 docs -
1A Fern Villa Tolbooth Street Forres Moray IV36 1PH
Installation of 3no Smart Airbricks at
Granted Full applications 9 docs -
32 Tolbooth Street Forres Moray IV36 1PH
Installation of a uPVC flood door at
Granted Heritage and listed buildings 9 docs -
32 Tolbooth Street Forres Moray IV36 1PH
Installation of a uPVC flood door at
Granted Full applications 11 docs -
Ferndale Tolbooth Street Forres Moray IV36 1PH
Installation of 8no Smart Airbricks at
Granted Full applications 8 docs
Other heritage and listed building applications
In Moray
-
26/00926/LBC Granted
214 Seatown Cullen Buckie Moray AB56 4SJ
Alter and extend dwellinghouse at
-
26/01167/LBC Awaiting decision
94 High Street Elgin Moray IV30 1BJ
Installation of combined defibrillator and bleed kit cabinet to external wall of Nationwide Building Society branch
-
26/01131/LBC Awaiting decision
St Giles And St Columbas South Church Office Duff Avenue Elgin Moray IV30 1QS
Replace existing plain glass window on the south elevation with a new stain glass window at
-
26/01072/LBC Awaiting decision
52 Seafield Street Cullen Buckie Moray AB56 4SW
Installation of secondary glazing to windows at
-
26/00782/LBC Granted
Spynie Parish Church Elgin Moray IV30 8XJ
Remove wooden pews benches partitions platforms and steps wood panelling within existing church at