Planning application

Land Near Quarrywood Elgin Moray

Refused Moray 25/00469/APP Application for Planning Permission

Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.

Proposal

Form a battery energy storage facility comprising battery storage units ancillary buildings and equipment and associated works on

As published by the council, reference 25/00469/APP

Application record

Reference
25/00469/APP
Type
Application for Planning Permission
Status
Decided
Decision
Refuse
Received
30 Apr 2025
Validated
27 May 2025
Decided
17 Jul 2026
Ward
Heldon And Laich
Parish
Heldon
Decision by
Committee - National/Major

Timeline

Dates from the published record

  1. 30 Apr 2025

    Received by Moray

  2. 27 May 2025

    Validated

    Checked as complete and ready for consideration.

  3. 17 Jul 2026

    Decision issued: Refuse

  4. 5 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

19 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What refusal means

The process from here

The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.

Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

In Moray

  • 26/00390/APP Granted

    Brodieshill Farmhouse Forres Moray IV36 2QU

    Change of use of children's play unit to letting unit at

    1 Apr 2026 Full applications
  • 25/01064/APP Granted

    Dunes 100 Metres East Of Last Beach Hut Hopeman East Beach Moray

    Retrospective consent to site and operate a mobile sauna for 4 days a week on

    28 Aug 2025 Full applications
  • 26/00677/APP Granted

    Rothes Tennis Club Rothes Recreation Park Station Street Rothes Moray

    Change existing metal halide floodlighting to LED at

    29 May 2026 Full applications
  • 26/01105/APP Awaiting decision

    27 Cuthil Road Keith Moray AB55 5AS

    Retrospective application to replace timber garage with steel framed metal clad garage at

    1 Sep 2026 Full applications
  • 26/00757/APP Granted

    Tarnash Farm Keith Moray AB55 5PB

    Change of use from agricultural land to equestrian land with construction of riding area fencing and lighting poles at

    16 Jun 2026 Full applications