Planning application
Land South Of Marypark Ballindalloch Moray
Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.
Proposal
Construction of a 70 MWe electrolytic hydrogen production facility and associated ancillary infrastructure including water supply and wastewater pipeline on
As published by the council, reference 25/00203/EIA
Application record
- Reference
- 25/00203/EIA
- Type
- Environmental Impact Assessment
- Status
- Decided
- Decision
- Refused As published: Refuse
- Received
- 24 Feb 2025
- Validated
- 3 Mar 2025
- Decided
- 15 Oct 2025
- Ward
- Speyside Glenlivet
- Parish
- Glenlivet
- Decision by
- Committee - National/Major
Timeline
Dates from the published record
-
24 Feb 2025
Received by Moray
-
3 Mar 2025
Validated
Checked as complete and ready for consideration.
-
15 Oct 2025
Decision issued: Refuse
-
5 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
62 documents on file for this application
- DECISION NOTICE - REFUSED
- REPORT
- INFORMATION PACK
- DRAINAGE GENERAL ARRANGEMENT
- SITE LAYOUT DRAWING
- NATURE POSITIVE BIODIVERSITY REPORT
- BIODIVERSITY METRIC CALC (WITHOUT OFF SITE)
- BIODIVERSITY METRIC CALC (WITH OFF SITE)
- LANDSCAPE AND VISUAL IMPACT ASSESSMENT (LVIA) - VOLUME 3, APPENDIX F.1 (PART 1)
- HARD LANDSCAPING LAYOUT
- VOLUME 4: FIGURES
- APPENDIX F2: LANDSCAPE AND VISUAL IMPACT ASSESSMENT (LVIA) METHODOLOGY
- SPEYSIDE HYDROGEN EIA VOLUME 1 - NON-TECHNICAL SUMMARY
- VOLUME 2: EIAR CHAPTER 19 - CONCLUSION AND SCHEDULE OF MITIGATION
- VOLUME 3 - APPENDIX A1: OUTLINE CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN
- VOLUME 3 - APPENDIX J1: FLOOD RISK ASSESSMENT
- APPENDIX J4: WATER QUALITY IMPACT ASSESSMENT
- NATURE POSITIVE BIODIVERSITY REPORT
- PLANNING STATEMENT
- PRELIMINARY INCIDENT MANAGEMENT PLAN
- VOLUME 2: EIAR CHAPTER 16 - WATER RESOURCES
- VOLUME 4: FIGURES
- COMPRESSOR BUILDING FLOOR AND ROOF PLANS SECTION AND 3D VIEW
- HARD LANDSCAPING PLAN
- LOCATION PLAN
- SOUTHERN ELECTROLYSER BUILDING - NORTHEAST AND SOUTHWEST ELEVATIONS
- ADMIN AND CONTROL BUILDING ELEVATIONS
- ADMIN AND CONTROL BUILDING FLOOR PLANS
- SPEYSIDE HYDROGEN ADMIN AND CONTROL BUILDING ROOF PLAN
- ADMIN AND CONTROL BUILDING SECTIONS
- VISUALS - AERIAL 2
- NIGHT AERIAL 1
- CARBON BALANCE ASSESSMENT
- CARBON MANAGEMENT AND REPORTING PLAN
- COMMUNITY WEALTH BUILDING PLAN
- COMPRESSOR BUILDING ELEVATIONS
- DESIGN AND ACCESS STATEMENT
- DNO BUILDING ELEVATIONS
- DNO BUILDING ROOF AND FLOOR PLAN AND SECTIONS
- DRAINAGE DETAILS SHEET 1
- DRAINAGE DETAILS SHEET 2
- DRAINAGE DETAILS SHEET 3
- DRAINAGE DETAILS SHEET 4
- DRAINAGE DETAILS SHEET 5
- DRAINAGE DETAILS SHEET 6
- DRAINAGE DETAILS SHEET 7
- DRAINAGE DETAILS SHEET 8
- DRAINAGE STRATEGY
- VOLUME 2: EIAR CHAPTER 10 - LANDSCAPE AND VISUAL
- VOLUME 2: EIAR CHAPTER 11 - MATERIALS AND WASTE
- VOLUME 2: EIAR CHAPTER 12 - NOISE AND VIBRATION
- VOLUME 2: EIAR CHAPTER 13 - POPULATION AND HUMAN HEALTH
- VOLUME 2: EIAR CHAPTER 14 - SOILS
- VOLUME 2: EIAR CHAPTER 15 - TRANSPORT AND MOVEMENT
- VOLUME 2: EIAR CHAPTER 17 - ACCIDENTS AND DISASTERS
- VOLUME 2: EIAR CHAPTER 18 - CUMULATIVE EFFECTS
- VOLUME 2: EIAR CHAPTER 5 - AIR QUALITY
- VOLUME 2: EIAR CHAPTER 7 - TERRESTRIAL ECOLOGY
- VOLUME 2: EIAR CHAPTER 9 - CULTURAL HERITAGE
- APPENDIX C1: PRELIMINARY AQUATIC ECOLOGY ASSESSMENT
- APPENDIX C2: AQUATIC ECOLOGY BASELINE ASSESSMENT
- VOLUME 3 - APPENDIX C3: INVASICE NON-NATIVE SPECIES BIOSECURITY MANAGEMENT PLAN
- APPENDIX E1: HISTORIC ENVIRONMENT DESK BASED ASSESSMENT
- APPENDIX F1: LANDSCAPE AND VISUAL IMPACT ASSESSMENT
- LANDSCAPE AND VISUAL IMPACT ASSESSMENT (LVIA) - VOLUME 3, APPENDIX F.1 (PART 2)
- APPENDIX G1: NOISE SURVEY CALIBRATION CERTFICATES
- APPENDIX G2: NOISE SURVEY MEASUREMENT DATA
- APPENDIX H1: SOIL RESOURCE SURVEY REPORT
- APPENDIX I1: OUTLINE CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP)
- APPENDIX I2: ROAD SAFETY AUDIT
- APPENDIX J2: GROUNDWATER RESOURCE IMPACT ASSESSMENT
- VOLUME 3 - APPENDIX J3: HYDROMORPHOLOGY IMPACT ASSESSMENT
- APPENDIX K1: LONGLIST OF DEVELOPMENTS
- VOLUME 2: EIAR CHAPTER 8 - CLIMATE RESILIENCE
- PROPOSED GROUND LEVELS
- GROUND VIEW 2 YEARS
- GROUND VIEW 20 YEARS
- GROUND VIEW 20 YEARS - NIGHT VIEW
- LANDSCAPE MITIGATION PLAN
- MV SUBSTATION ELEVATIONS
- MV SUBSTATION FLOOR PLAN
- MV SUBSTATION ROOF PLAN
- MV SUBSTATION SECTIONS
- NORTHERN ELECTROLYSER BUIDLING SE AND NW ELEVATIONS
- NORTHERN ELECTROLYSER BUILDING FLOOR PLAN
- NORTHERN ELECTROLYSER BUILDING ROOF PLAN
- NORTHERN ELECTROLYSER BUILDING SECTIONS
- NORTHERN ELECTROLYSER BUILDING SW AND NE ELEVATIONS
- PRE-APPLICATION CONSULTATION REPORT
- PRELIMINARY ARBOROCULTURAL APPRAISAL
- PROPOSED LOCATION PLAN
- RAW WATER AND EFFLUENT DISCHARGE PIPES LONGITUDINAL SECTIONS
- RAW WATER AND EFFLUENT DISCHARGE PIPES PLAN
- RAW WATER AND EFFLUENT DISCHARGE PIPES KIOSK DETAILS 2
- RAW WATER BOOSTER STATION DETAILS
- SECURITY CABIN - PLANS, SECTIONS AND ELEVATIONS
- EXTERNAL WORKS ? SECURITY FENCE GENERAL ARRANGEMENT
- SITE ELEVATION ? SHEET 1 OF 2
- SITE ELEVATION - SHEET 2 OF 2
- SITE SECTIONS - SHEET 1 OF 2
- SITE SECTIONS - SHEET 2 OF 2
- SOUTHERN ELECTROLYSER BUILDING - SOUTHEAST AND NORTHWEST ELEVATIONS
- SOUTHERN ELECTROLYSER BUILDING - FLOOR PLAN
- SOUTHERN ELECTROLYSER BUILDING - ROOF PLAN
- SOUTHERN ELECTROLYSER BUILDING - SECTIONS
- EXTERNAL WORKS - SWEPT PATH ANALYSIS - SHEET 1
- EXTERNAL WORKS - VEHICLE SWEPT PATH - SHEET 2
- EXTERNAL WORKS - VEHICLE SWEPT PATH - SHEET 3
- TRANSPORT STATEMENT
- CIVIL ENGINEERING - TYPICAL CONSTRUCTION DETAILS - SHEET 1
- CIVIL ENGINEERING - TYPICAL CONSTRUCTION DETAILS - SHEET 2
- CIVIL ENGINEERING - TYPICAL FENCING DETAILS - SHEET 1
- CIVIL ENGINEERING - TYPICAL FENCING DETAILS - SHEET 2
- CIVIL ENGINEERING - TYPICAL FENCING DETAILS - SHEET 3
- APPENDIX B1: CONSTRUCTION DUST RISK ASSESSMENT
- APPENDIX B2: ROAD SOURCE MODEL VERIFICATION
- VOLUME 3 - APPENDIX D1: PRELIMINARY ECOLOGICAL APPRAISAL REPORT
- APPENDIX E2: HISTORIC EIA TABLES
- WAREHOUSE/WORKSHOP BUILDING - ELEVATIONS
- WAREHOUSE/WORKSHOP BUILDING - FLOOR AND ROOF PLANS
- WAREHOUSE/WORKSHOP BUILDING - SECTIONS
- VOLUME 2: EIAR CHAPTERS 1-4 - INTRODUCTORY CHAPTERS
- VOLUME 3 - APPENDIX D3: BREEDING BIRD SURVEY REPORT
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this refusal means
Moray refused this application for the reasons on the decision notice; only the applicant can appeal, and refused schemes often return in revised form. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
B9138 West Of Marypark Ballindalloch
Creation of a temporary opening/access on
Granted Full applications 6 docs
Other outline applications
In Moray
-
26/01247/PPP Awaiting decision
Garden Ground Of West Park House Nairn Road Forres Moray
Form 2no dwellinghouse plots in garden ground of
-
26/01191/SCO Awaiting decision
Parkmore Lime Quarry Dufftown Keith Moray AB55 4DL
EIA scoping report related to a proposed planning application for Parkmore Quarry. The proposed development involves a limited lateral extension to the quarry together with deepening of the quarry within the existing extraction footprint and is aimed at optimising the extraction of the high quality limestone reserves at the quarry. The quarry operates under Planning Permission 05/00413/MIN which expires on 21st February 2042.
-
26/01191/SCN Awaiting decision
Parkmore Lime Quarry Dufftown Keith Moray AB55 4DL
EIA scoping report related to a proposed planning application for Parkmore Quarry. The proposed development involves a limited lateral extension to the quarry together with deepening of the quarry within the existing extraction footprint and is aimed at optimising the extraction of the high quality limestone reserves at the quarry. The quarry operates under Planning Permission 05/00413/MIN which expires on 21st February 2042.
-
25/01648/PPP Withdrawn
Land Between Brae Croft And Gillymule Farm Grange Keith AB55 6TJ
Erect a dwelling and detached garage on
-
26/01133/PPP Awaiting decision
Site Adjacent To Westerton Croft Grange Keith Moray
Erect dwellinghouse and detached garage/carport on