Skip to content
PlanIndex Get alerts
Menu

Planning application

Edinglassie Mains Glass Huntly Moray AB54 4YB

Granted Moray 24/01892/LBC Listed Building Consent

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Proposed repairs and new metal roof finish over part of the steading at

As published by the council, reference 24/01892/LBC

Application record

Reference
24/01892/LBC
Type
Listed Building Consent
Status
Decided
Decision
Granted As published: Permitted
Received
20 Dec 2024
Validated
6 Jan 2025
Decided
11 Jul 2025
Ward
Speyside Glenlivet
Parish
Dufftown & District
Decision by
Delegated Power
Postcode
AB54 4YB

Site history

Applications at this address on the Moray register

This site has had 2 applications since 2024: 2 approved, 0 refused.

  • 24/01897/APP Granted

    Edinglassie Mains Glass Huntly Moray AB54 4YB

    Proposed repairs and new metal roof finish over part of the steading at

    Decided 11 Jul 2025 Full applications

Timeline

Dates from the published record

  1. 20 Dec 2024

    Received by Moray

  2. 6 Jan 2025

    Validated

    Checked as complete and ready for consideration.

  3. 11 Jul 2025

    Decision issued: Permitted

  4. 5 Aug 2026

    Added to PlanIndex

Cases linked to this one on the register

  • Application: 10/00708/APP (Decided)
  • Application: 10/00709/APP (Decided)
  • Application: 10/01490/APP (Decided)
  • Application: 24/01897/APP (Decided)

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

  • REPORT OF HANDLING Decision · 11 Jul 2025
  • DECISION NOTICE - APPROVED Decision · 11 Jul 2025
  • FLOOR PLAN Approved Plan · 20 Dec 2024
  • ROOF PLAN Approved Plan · 20 Dec 2024
  • ELEVATIONS Approved Plan · 20 Dec 2024
  • SITE AND LOCATION PLAN Approved Plan · 20 Dec 2024

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Moray granted permission on 11 July 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Moray

  • 26/00747/LBC Granted

    8 Cothall Cottages Forres Moray IV36 2SQ

    Provide secondary glazing to windows at

    Received 12 Jun, published by the council 27 Jul 2026 Heritage and listed buildings
  • 26/00985/LBC Granted

    Mahanaim-balnagone 20 King Street Elgin Moray IV30 1EU

    Remove cement pointing and repoint with breathable lime mortar on north and west elevations at

    Received 6 Aug, published by the council 24 Aug 2026 Heritage and listed buildings
  • 26/00430/LBC Granted

    45 Findhorn Forres Moray IV36 3YF

    Addition of roof light replace existing windows slates and gutters and remove existing cement render and apply new lime harl render at

    Received 9 Apr, published by the council 27 Jul 2026 Heritage and listed buildings
  • 26/00906/LBC Granted

    11 Reidhaven Street Elgin Moray IV30 1QG

    Erect replacement sun lounge at

    Received 21 Jul, published by the council 16 Aug 2026 Heritage and listed buildings
  • 26/01182/LBC Awaiting decision

    5 Bank Lane Forres Moray IV36 1NU

    Repair chimney at

    Received 14 Sep, published by the council 30 Sep 2026 Heritage and listed buildings