Planning application
Kellas Drum Wind Farm Elgin Moray
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Construct and operate wind farm and battery storage with associated infrastructure at
As published by the council, reference 24/00486/S36
Application record
- Reference
- 24/00486/S36
- Type
- Dealt With By Scottish Executive
- Status
- Unknown
- Decision
- Granted As published: Raise No Objections
- Received
- 21 Mar 2024
- Validated
- 21 Mar 2024
- Decided
- 27 May 2025
- Ward
- Speyside Glenlivet
- Parish
- Heldon
- Decision by
- Committee - Other/Scheme of Delegation
Timeline
Dates from the published record
-
21 Mar 2024
Received by Moray
-
27 May 2025
Decision issued: Raise No Objections
-
5 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
EPower Limited Agent
2 applications on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordKellas Drum Limited Applicant, registered in Edinburgh
Active · incorporated 2022 · Edinburgh
1 application on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
66 documents on file for this application
- DECISION LETTER & ANNEXES 1 & 2
- ANNEXE 3 SITE LAYOUT PLAN
- ANNEXE 4 - APPROPRIATE ASSESSMENT - LOCH SPYNIE SPA
- ANNEXE 4 - APPROPRIATE ASSESSMENT - MORAY & NAIRN COAST SPA
- CONSULTATION RESPONSE TO ECU
- COMMITEE REPORT
- PRIVATE WATER SUPPLIES
- MORAY FLOOD RISK MANAGEMENT
- CONTAMINATED LAND
- ABERDEENSHIRE COUNCIL ARCHAEOLOGY SERVICE
- COVERING LETTER
- COVER PAGE - VOLUME 1 PREFACE & NTS
- COVER PAGE - VOLUME 2 EIA MAIN TEXT
- COVER PAGE - VOLUME 3 TECHNICAL APPENDICES
- COVER PAGE - VOLUME 4 VIGURES
- DESIGN AND ACCESS STATEMENT
- PLANNING STATEMENT
- PRE APPLICATION CONSULTATION RESPONSE
- VOLUME 1 - NON TECHNICAL SUMMARY
- VOLUME 2 - CHAPTER 01 INTRODUCATION
- VOLUME 2 - CHAPTER 02 EIA APPROACH & METHODOLOGY
- VOLUME 2 - CHAPTER 03 DESCRIPTION OF DEVELOPMENT
- VOLUME 2 - CHAPTER 04 PLANNING & ENERGY POLICY
- VOLUME 2 - CHAPTER 05 LANDSCAPE AND VISUAL IMPACT ASSESSMENT
- VOLUME 2 - CHAPTER 08 HYDROLOGY HYDROGEOLOGY & GEOLOGY INCLUDING PEAT
- VOLUME 2 - CHAPTER 09 TRANSPORT & ACCESS
- VOLUME 2 - CHAPTER 10 CULTURAL HERITAGE
- VOLUME 2 - CHAPTER 11 NOISE
- VOLUME 2 - CHAPTER 12 SOCIO ECONOMIC TOURISM & RECREATION
- VOLUME 2 - CHAPTER 13 CLIMATE CHANGE & CARBON BALANCE
- VOLUME 2 - CHAPTER 14 OTHER CONSIDERATIONS
- VOLUME 2 - CHAPTER 15 SCHEDULE OF MITIGATION
- VOLUME 2 - CHAPTER 16 SUMMARY OF PREDICTED RESIDUAL EFFECTS
- VOLUME 3 - TECHNIVAL APPENDIX 3-1 BOWRROW PIT APPRAISAL
- VOLUME 3 - TECHNICAL APPENDIX 3-2 FORESTRY
- VOLUME 3 - TECHNICAL APPENDIX 5-1 METHODOLOGY FOR LVIA
- VOLUME 3 - TECHNICAL APPENDIX 5-2 LANDSCAPE CHARACTER ASSESSMENT
- VOLUME 3 - TECHNICAL APPENDIX 5-3 ASSESSMENT OF VISUAL EFFECTS
- VOLUME 3 - TECHNICAL APPENDIX 5-4 CUMULATIVE ASSESSMENT
- VOLUME 3 - TECHNICAL APPENDIX 5-5 IMPLICATIONS FRO DESIGN LANDSCAPES
- VOLUME 3 - TECHNICAL APPENDIX 5- 6 RVAA
- VOLUME 3 - TECHNICAL APPENDIX 5- 7 AVIATION LIGHTING ASSESSMENT
- VOLUME 3 - TECHNICAL APPENDIX 5- 8 COMPARISON WITH THE CONSENTED KELLAS WIND FAR
- VOLUME 3 - TECHNICAL APPENDIX 6-1 EXTENDED PAHSE 1 HABBITAT & NVC SURVEY
- VOLUME 3 - TECHNICAL APPENDIX 6-3 PROTECTED MAMMALSSURVEY
- VOLUME 3 - TECHNICAL APPENDIX 6- 4 OUTLINE HMBEP
- VOLUME 3 - TECHNICAL APPENDIX 6- 5 MARINE SCIENCE SCOTLAND CHECKLIST
- VOLUME 3 - TECHNICAL APPENDIX 8-1 PEAT SURVEY RESULTS
- VOLUME 3 - TECHNICAL APPENDIX 8- 2 WATERCOURSE CROSSING SCHEDULE
- VOLUME 3 - TECHNICAL APPENDIX 8- 3 PEAT LANDSLIDE HAZARD RISK ASSESSMENT
- VOLUME 3 - TECHNICAL APPENDIX 8- 4 PEAT MANAGEMENT PLAN
- VOLUME 3 - TECHNICAL APPENDIX 9-1 ABNORMAL LOADS ASSESSMENT
- VOLUME 3 - TECHNICAL APPENDIX 9- 2 ABNORMAL LOADS ASSESSMENT - ALTERNATIVE
- VOLUME 3 - TECHNICAL APPENDIX 9- 3 FRAMEWORK CONSTRUCTION TRAFFIC MANAGEMENT PLA
- VOLUME 3 - TECHNICAL APPENDIX 10-1 HERITAGE ASSET & EVENT GAZETTEER
- VOLUME 3 - TECHNICAL APPENDIX 10-2 PHOTOGRAPHIC PLATES
- VOLUME 3 - TECHNICAL APPENDIX 10-3 SETTING ASSESSMENT
- VOLUME 3 - TECHNICAL APPENDIX 11-1 STAKEHOLDER CORRESPONDANCE
- VOLUME 3 - TECHNICAL APPENDIX 11- 2 BASELINE NOISE MEASUREMENTS
- VOLUME 3 - TECHNICAL APPENDIX 11- 3 NOISE PREDICATION METHODOLOGY
- VOLUME 3 - TECHNICAL APPENDIX 11- 4 CUMULATIVE PREDICTION TURBINE DETAILS
- VOLUME 3 - TECHNICAL APPENDIX 13-1 CARBON CALCULATOR INPUTS
- VOLUME 3 - TECHNICAL APPENDIX 14-1 VIATION LIGHTING & MITIGATION REPORT
- VOLUME 3 - TECHNICAL APPENDIX 14-2 IFP SAFEGUARDING - INVERNESS AIRPORT
- VOLUME 3 - TECHNICAL APPENDIX 14- 3 RADAR LINE OF SIGHT ASSESSMENT - INVERNESS A
- VOLUME 3 - TECHNICAL APPENDIX 15-1 OUTLINE CONSTRUCTION ENVIRONMENTAL MANAGEMEN
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Moray granted permission on 27 May 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Moray's portal will say. Our guide explains the common types.