Planning application

214 Seatown Cullen Buckie Moray AB56 4SJ

Granted Moray 23/01401/LBC Listed Building Consent

Works: Extension Roofing Demolition Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolish existing extension erect new extension refurbish existing single glazed sash & case windows replace existing casement window W5 with new double glazed painted timber casement replace concrete tile roof with new roof construction with pantile finish replace door and internal alterations at

As published by the council, reference 23/01401/LBC

Application record

Reference
23/01401/LBC
Type
Listed Building Consent
Status
Decided
Decision
Granted As published: Permitted
Received
18 Aug 2023
Validated
21 Aug 2023
Decided
10 Nov 2023
Ward
Keith And Cullen
Parish
Cullen & Deskford
Decision by
Delegated Power
Postcode
AB56 4SJ

Site history

Applications at this address on the Moray register

This site has had 5 applications since 2022: 5 approved, 0 refused.

  • 26/00926/LBC Granted

    214 Seatown Cullen Buckie Moray AB56 4SJ

    Alter and extend dwellinghouse at

    Decided 14 Sep 2026 Heritage and listed buildings
  • 26/00925/APP Granted

    214 Seatown Cullen Buckie Moray AB56 4SJ

    Alter and extend dwellinghouse at

    Decided 14 Sep 2026 Full applications
  • 23/01400/APP Granted

    214 Seatown Cullen Buckie Moray AB56 4SJ

    Demolish existing extension erect new extension refurbish existing single glazed sash & case windows replace existing casement window W5 with new double glazed painted timber casement replace concrete tile roof with new roof construction with pantile finish replace door and internal alterations at

    Decided 13 Nov 2023 Full applications
  • 22/00183/APP Granted

    214 Seatown Cullen Buckie Moray AB56 4SJ

    Demolish existing extension erect new extension refurbish existing single glazed sash & case windows replace concrete tile roof with new roof construction with pantile finish and replace door

    Decided 27 May 2022 Full applications

Timeline

Dates from the published record

  1. 18 Aug 2023

    Received by Moray

  2. 21 Aug 2023

    Validated

    Checked as complete and ready for consideration.

  3. 10 Nov 2023

    Decision issued: Permitted

  4. 5 Aug 2026

    Added to PlanIndex

Cases linked to this one on the register

  • Application: 05/01358/FUL (Decided)
  • Application: 05/01359/LBC (Decided)
  • Application: 22/00183/APP (Decided)
  • Application: 22/00184/LBC (Decided)
  • Application: 23/01400/APP (Decided)

Who's behind it

Company information only, from the register and Companies House

Ross Cowie Architect Agent, an architecture practice registered in Buckie

Active · incorporated 2011 · Buckie

19 applications on PlanIndex · across 2 councils · 100% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

  • DECISION NOTICE - APPROVED Decision · 10 Nov 2023
  • REPORT OF HANDLING Decision · 10 Nov 2023
  • PROPOSED FLOOR PLANS - APPROVED Drawing · 18 Aug 2023
  • PROPOSED ELEVATIONS - APPROVED Drawing · 18 Aug 2023
  • PROPOSED SECTIONS - APPROVED Drawing · 18 Aug 2023
  • EXISTING ELEVATIONS Drawing · 18 Aug 2023
  • EXISTING FLOOR PLANS Drawing · 18 Aug 2023
  • LOCATION PLAN - APPROVED Drawing · 18 Aug 2023
  • SITE PLAN - APPROVED Drawing · 18 Aug 2023

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Moray granted permission on 10 November 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 214 Seatown Cullen Buckie Moray AB56 4SJ

    23/01400/APP Submitted 18 Aug 2023 50 yards away

    Demolish existing extension erect new extension refurbish existing single glazed sash & case windows replace existing casement window W5 with new double glazed painted timber casement replace concrete tile roof with new roof construction with pantile finish replace door and internal alterations at

    Granted Full applications Extension Roofing +2 9 docs
  • 214 Seatown Cullen Buckie Moray AB56 4SJ

    26/00926/LBC Submitted 24 Jul 2026 50 yards away

    Alter and extend dwellinghouse at

    Granted Heritage and listed buildings 7 docs
    Domestic
  • 214 Seatown Cullen Buckie Moray AB56 4SJ

    26/00925/APP Submitted 24 Jul 2026 50 yards away

    Alter and extend dwellinghouse at

    Granted Full applications 9 docs
    Domestic
  • 214 Seatown Cullen Buckie Moray AB56 4SJ

    22/00183/APP Submitted 9 Feb 2022 50 yards away

    Demolish existing extension erect new extension refurbish existing single glazed sash & case windows replace concrete tile roof with new roof construction with pantile finish and replace door

    Granted Full applications Extension Roofing +2 9 docs
  • Homelea 188 Seatown Cullen Buckie Moray AB56 4SJ

    24/00077/CON Submitted 18 Jan 2024 50 yards away

    Demolish dwellinghouse at

    Granted Heritage and listed buildings Demolition 4 docs
    Domestic
  • Homelea 188 Seatown Cullen Buckie Moray AB56 4SJ

    24/00076/APP Submitted 18 Jan 2024 50 yards away

    Demolish existing dwelling and erection of replacement dwellinghouse at

    Granted Full applications Demolition 6 docs
    Domestic

In Moray

  • 26/00747/LBC Granted

    8 Cothall Cottages Forres Moray IV36 2SQ

    Provide secondary glazing to windows at

    Received 12 Jun, published by the council 27 Jul 2026 Heritage and listed buildings
  • 26/00985/LBC Granted

    Mahanaim-balnagone 20 King Street Elgin Moray IV30 1EU

    Remove cement pointing and repoint with breathable lime mortar on north and west elevations at

    Received 6 Aug, published by the council 24 Aug 2026 Heritage and listed buildings
  • 26/00430/LBC Granted

    45 Findhorn Forres Moray IV36 3YF

    Addition of roof light replace existing windows slates and gutters and remove existing cement render and apply new lime harl render at

    Received 9 Apr, published by the council 27 Jul 2026 Heritage and listed buildings
  • 26/00906/LBC Granted

    11 Reidhaven Street Elgin Moray IV30 1QG

    Erect replacement sun lounge at

    Received 21 Jul, published by the council 16 Aug 2026 Heritage and listed buildings
  • 26/01182/LBC Awaiting decision

    5 Bank Lane Forres Moray IV36 1NU

    Repair chimney at

    Received 14 Sep, published by the council 30 Sep 2026 Heritage and listed buildings