Skip to content
PlanIndex Get alerts
Menu

Planning application

R1 Kinneddar Lossiemouth Moray

Granted Moray 23/00796/APP Application for Planning Permission

Works: New dwelling

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Move plots 1 and 2 to add in plot 3/3a split former apartment 9B into two 1Bed apartments amend house types on plots 119-123 and 126-130 at

As published by the council, reference 23/00796/APP

Application record

Reference
23/00796/APP
Type
Application for Planning Permission
Status
Decided
Decision
Permitted
Received
15 May 2023
Validated
25 May 2023
Decided
24 Aug 2023
Ward
Heldon And Laich
Parish
Lossiemouth
Decision by
Delegated Power

Timeline

Dates from the published record

  1. 15 May 2023

    Received by Moray

  2. 25 May 2023

    Validated

    Checked as complete and ready for consideration.

  3. 24 Aug 2023

    Decision issued: Permitted

  4. 5 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

17 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Kinneddar Bothy Lossiemouth Moray

    26/00087/APP Submitted 26 Jan 2026 127m away

    97% historically approved · decision due ~25 Mar

    Demolish existing house and erect new dwellinghouse at

    Awaiting decision Full applications Demolition 17 docs
    Domestic
  • R1 Kinneddar Lossiemouth Moray

    22/00161/APP Submitted 7 Feb 2022 278m away

    S42 to vary condition 1 (delivery of affordable housing) 8-11 (phasing) and condition 30 (drainage) of application reference 19/00100/APP at

    Granted Full applications 22 docs
  • R1 Kinneddar Lossiemouth Moray

    22/01484/S75 Submitted 11 Oct 2022 278m away

    Update the legal agreement to make reference to 22/00161/APP at

    Granted 2 docs
  • Roselea Cottage Coulardbank Road Lossiemouth Moray IV31 6FD

    25/01401/APP Submitted 24 Oct 2025 323m away

    Alter and extend dwellinghouse at

    Granted Full applications 4 docs
    Domestic
  • Land East Of RAF Lossiemouth Lossiemouth Moray IV31 6SD

    23/01758/APP Submitted 3 Oct 2023 339m away

    Section 42 application to vary condition 1 of 20/01193/APP to allow an extension of time of the planning permission for a further 36 months for the siting of a welfare cabin on

    Granted Full applications 10 docs
  • Land East Of RAF Lossiemouth Lossiemouth Moray

    21/01697/APP Submitted 26 Oct 2021 374m away

    Amended planning consent 21/00303/APP to include the addition of a traffic light and tactile paving on

    Granted Full applications 10 docs

In Moray

  • 26/00390/APP Granted

    Brodieshill Farmhouse Forres Moray IV36 2QU

    Change of use of children's play unit to letting unit at

    1 Apr 2026 Full applications
  • 25/01064/APP Granted

    Dunes 100 Metres East Of Last Beach Hut Hopeman East Beach Moray

    Retrospective consent to site and operate a mobile sauna for 4 days a week on

    28 Aug 2025 Full applications
  • 26/00677/APP Granted

    Rothes Tennis Club Rothes Recreation Park Station Street Rothes Moray

    Change existing metal halide floodlighting to LED at

    29 May 2026 Full applications
  • 26/01105/APP Awaiting decision

    27 Cuthil Road Keith Moray AB55 5AS

    Retrospective application to replace timber garage with steel framed metal clad garage at

    1 Sep 2026 Full applications
  • 26/00757/APP Granted

    Tarnash Farm Keith Moray AB55 5PB

    Change of use from agricultural land to equestrian land with construction of riding area fencing and lighting poles at

    16 Jun 2026 Full applications