Planning application
York Tower Elgin Moray
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Remove and replace 2no antennas on existing support pole install 1no equipment cabinet and ancillary development including installation of 1no GPS mode at
As published by the council, reference 23/00324/LBC
Application record
- Reference
- 23/00324/LBC
- Type
- Listed Building Consent
- Status
- Decided
- Decision
- Granted As published: Permitted
- Received
- 24 Feb 2023
- Validated
- 24 Feb 2023
- Decided
- 31 Mar 2023
- Ward
- Heldon And Laich
- Parish
- Heldon
- Decision by
- Delegated Power
Timeline
Dates from the published record
-
24 Feb 2023
Received by Moray
-
31 Mar 2023
Decision issued: Permitted
-
5 Aug 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
- Application: 02/02329/FUL (Decided)
- Application: 02/02330/LBC (Decided)
- Application: 06/01014/FUL (Decided)
- Application: 06/01041/LBC (Decided)
- Application: 22/01793/APP (Decided)
- Application: 22/01794/LBC (Decided)
- Application: 96/01747/FUL (Decided)
- Application: 96/01763/LBC (Decided)
Who's behind it
Company information only, from the register and Companies House
Clarke Telecom Ltd Agent, a telecoms contractor registered in Leeds
Active · incorporated 2011 · Leeds
492 applications on PlanIndex · across 127 councils · 81% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
- DECISION NOTICE - APPROVED
- REPORT OF HANDLING
- ANTENNA LAYOUT - APPROVED
- SITE AND LOCATION PLAN - APPROVED
- EQUIPMENT LAYOUT - APPROVED
- EXISTING SITE ELEVATION
- EXISTING SITE PLAN
- LOCATION PLAN - APPROVED
- PROPOSED ELEVATIONS - APPROVED
- PROPOSED SITE PLAN - APPROVED
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Moray granted permission on 31 March 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Site At Newton Elgin Moray
Revise house design and site boundary on planning consent 18/01134/APP to erect dwellinghouse on
Granted Full applications 9 docsDomestic -
Site At Newton Elgin Moray
Erect dwellinghouse and detached garage on
Granted Full applications 12 docsDomestic -
-
Site Within The Grounds Of Newton House Newton Elgin Moray
Revise house design and site boundary on planning consent 16/01132/APP to erect dwellinghouse on
Granted Full applications 9 docsDomestic -
Site At Newton Elgin Moray
Revise house design access route and plot boundaries on ref 18/00555/APP to erect dwellinghouse and garage on
Granted Full applications 11 docsDomestic -
Site At Newton Elgin Moray
Revise house design approved under ref 21/01534/APP on
Granted Full applications 14 docs
Other heritage and listed building applications
In Moray
-
26/00747/LBC Granted
8 Cothall Cottages Forres Moray IV36 2SQ
Provide secondary glazing to windows at
-
26/00985/LBC Granted
Mahanaim-balnagone 20 King Street Elgin Moray IV30 1EU
Remove cement pointing and repoint with breathable lime mortar on north and west elevations at
-
26/00430/LBC Granted
45 Findhorn Forres Moray IV36 3YF
Addition of roof light replace existing windows slates and gutters and remove existing cement render and apply new lime harl render at
-
26/00906/LBC Granted
11 Reidhaven Street Elgin Moray IV30 1QG
Erect replacement sun lounge at
-
26/01182/LBC Awaiting decision
5 Bank Lane Forres Moray IV36 1NU
Repair chimney at