Planning application
Site West Of Clashindarroch Wind Farm Moray
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Construct operate and decommission a wind farm with a generating capacity in excess of 50MW consisting of up to 22 wind turbines and associated infrastructure including a battery energy storage facility. Thirteen of the wind turbines have a ground to blade tip height of up to 200m and nine have a ground to blade tip height of up to 180m at
As published by the council, reference 23/00047/S36
Application record
- Reference
- 23/00047/S36
- Type
- Dealt With By Scottish Executive
- Status
- Unknown
- Decision
- Granted As published: Raise No Objections
- Received
- 13 Jan 2023
- Validated
- 13 Jan 2023
- Decided
- 27 Jun 2023
- Ward
- Speyside Glenlivet
- Parish
- Dufftown & District
- Decision by
- Committee - National/Major
Timeline
Dates from the published record
-
13 Jan 2023
Received by Moray
-
27 Jun 2023
Decision issued: Raise No Objections
-
5 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Energy Consent Unit Agent
4 applications on PlanIndex · across 2 councils
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordInfinergy Ltd Applicant
1 application on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
228 documents on file for this application
- DETERMINATION DECISION LETTER
- STRATEGIC PLANNING AND DEVELOPMENT HOLDING
- TRANSPORTATION MANAGER
- MORAY FLOOD RISK MANAGEMENT
- ABERDEEN ARCHAEOLOGY SERVICES
- CONTAMINATED LAND
- PRIVATE WATER SUPPLIES
- MORAY ACCESS MANAGER
- NON TECHNICAL SUMMARY
- DESIGN AND ACCESS STATEMENT
- LOCATION PLAN
- PAC REPORT APPENDICES PART 1
- PAC REPORT APPENDICES PART 2
- PAC REPORT APPENDICES PART 3
- PAC REPORT
- PLANNING STATEMENT
- WRITTEN STATEMENT - CHAPTER 1 INTRODUCTIONS
- WRITTEN STATEMENT - CHAPTER 2 SITE DESCRIPTION
- WRITTEN STATEMENT - CHAPTER 3 ALTERNATIVES & SCHEME EVOLUTION
- WRITTEN STATEMENT - CHAPTER 4 DESCRIPTION OF PROPOSED DEVELOPMENT
- WRITTEN STATEMENT - CHAPTER 5 POLICY CONTEXT
- WRITTEN STATEMENT - CHAPTER 6 EIA METHODOLOGY SCOPING & CONSULATION
- WRITTEN STATEMENT - CHAPTER 7 LANDSCAPE & VISUAL
- WRITTEN STATEMENT - CHAPTER 8 ECOLOGY
- WRITTEN STATEMENT - CHAPTER 9 ORNITHOLOGY
- WRITTEN STATEMENT - CHAPTER 10 CULTURAL HERITAGE
- WRITTEN STATEMENT - CHAPTER 11 GEOLOGY & PEAT
- WRITTEN STATEMENT - CHAPTER 12 HYDROLOGY & HYDROGEOLOGY
- WRITTEN STATEMENT - CHAPTER 13 NOISE
- WRITTEN STATEMENT - CHAPTER 14 TRAFFIC & TRANSPORT
- WRITTEN STATEMENT - CHAPTER 15 AVIATION
- WRITTEN STATEMENT - CHAPTER 16 SOCIO ECONOMICS TOURISM & RECREATION
- WRITTEN STATEMENT - CHAPTER 17 SHADOW FLICKER
- WRITTEN STATEMENT - CHAPTER 18 TELECOMMUNICATIONS & UTILITIES
- WRITTEN STATEMENT - CHAPTER 19 HEALTH & SAFETY
- WRITTEN STATEMENT - CHAPTER 20 CLIMATE CHANGE & CARBON BALANCE
- WRITTEN STATEMENT - TABLE OF CONTENTS
- WRITTEN STATEMENT - CONTRIBUTIONG CONSULATANTS
- FIGURES - CHAPTER 2 FIGURE 2.1 GEOGRAPHICAL CONTEXT
- FIGURES - CHAPTER 2 FIGURE 2.2 THE SITE IN DETAIL
- FIGURES - CHAPTER 3 FIGURE 3.1 INITIAL PRE SCOPING LAYOUT & SCOPING LAYOUT
- FIGURES - CHAPTER 3 FIGURE 3.2 SITE CONSTAINTS MAP
- FIGURES - CHAPTER 3 FIGURE 3.3 PRE WORKSHOP LAYOUT & WORKSHOP LAYOUT
- FIGURES - CHAPTER 3 FIGURE 3.4 LAYOUT (ALTERATIONS 5) & LAYOUT (ALTERATIONS 6)
- FIGURES - CHAPTER 3 FIGURE 3.5 SUBSTATION & BATTERY STORAGE LOCATIONS
- FIGURES - CHAPTER 3 FIGURE 3.6 BORROW WAORKING SEACH AREA OPTIONS
- PROPOSED DEVELOPMENT LAYOUT
- WIND TURBINE 200M
- WIND TURBINE 180
- FOUNDATION DESIGN
- CRANE HARDSTANDING
- ACCESS TRACK SECTIONS
- CULVERT DETAIL
- CONSTRUCTION COMPOUND
- SUBSTATION & BESS COMPOUND LAYOUT
- SUBSTATION & BESS COMPOUND ELEVATIONS
- SSEN CONTROL BUILDING ELEVATIONS
- CONTROL BUILDING ELEVATIONS
- CABLE TRENCH DETAIL
- BORROW WORKING ONE PRELIMINARY DESIGN
- BORROW WORKING THREE PRELIMINARY DESIGN
- BORROW WORKING FIVE PRELIMINARY DESIGN
- SITE ACCESS JUNCTION
- CHAPTER 4 - FIGURE 4.18 INDICATIVE CONTRUCTION PROGRAMME
- CHAPTER 7 - FIGURE 7.1 SITE LOCATION & INITIAL LVIA 35KM STUDY AREA
- CHAPTER 7 - FIGURE 7.2 SITE LOCATION & DETAILED 20KM LVIA STUDY AREA
- CHAPTER 7 - FIGURE 7.3 CUMULATIVE ZTV CLASHINDARROCH EXTENSION & EXISTING CLASHI
- CHAPTER 7 - FIGURE 7.4 CUMULATIVE ZTV CLASHINDARROCH EXTENSION & EXISTING CLASHI
- CHAPTER 7 - FIGURE 7.5 BLADE TIP ZONE OF THEORETICAL VISIBILITY TO 35KM WITH VIE
- CHAPTER 7 - FIGURE 7.6 BLADE TIP ZONE OF THEORETICAL VISIBILITY TO 20KM WITH VIE
- CHAPTER 7 - FIGURE 7.7 HUB HEIGHT ZONE OF THEORETICAL VISIBILITY TO 35KM WITH VI
- CHAPTER 7 - FIGURE 7.8 HUB HEIGHT ZONE OF THEORETICAL VISIBILITY TO 20KM WITH VI
- CHAPTER 7 - FIGURE 7.9 LIT TURBINE ZONE OF THEORETICAL VISIBILITY TO 35KM WITH V
- CHAPTER 7 - FIGURE 7.10 TURBINE LIGHTING INTENSITY TO 20KM WITH VIEWPOINTS
- CHAPTER 7 - FIGURE 7.11 LANDSCAPE DESIGNATIONS WITNIN 35KM WITH VIEWPOINTS
- CHAPTER 7 - FIGURE 7.12 LANDSCAPE DESIGNATIONS WITNIN 20KM WITH VIEWPOINTS
- CHAPTER 7 - FIGURE 7.13 LANDSCAPE DESIGNATIONS WITNIN 20KM WITH BLADE TIP ZTV &
- CHAPTER 7 - FIGURE 7.14 LANDSCAPE CHARACTER TYPES WITHIN 35KM WITH VIEWPOINTS
- CHAPTER 7 - FIGURE 7.15 LANDSCAPE CHARACTER TYPES WITHIN 20KM WITH VIEWPOINTS
- CHAPTER 7 - FIGURE 7.16 LANDSCAPE CHARACTER TYPES WITHIN 20KM WITH BLADE TIP ZTV
- CHAPTER 7 - FIGURE 7.17 TOPOGRAPHY WITNIN 35KM WITH VIEWPOINTS
- CHAPTER 7 - FIGURE 7.18 LOCAL LANDSCAPE CONTEXT TO 5KM
- CHAPTER 7 - FIGURE 7.19 PRINCIPAL VISUAL RECEPTORS WITHIN 35KM WITH VIEWPOINTS
- CHAPTER 7 - FIGURE 7.20 PRICIPAL VISUAL RECEPTORS WITHIN 20KM WITH BLADE TIP ZTV
- CHAPTER 7 - FIGURE 7.21 BLADE TIP ZONE OF THEORETICAL VISIBILITY TO 35KN (NW QUA
- CHAPTER 7 - FIGURE 7.22 BLADE TIP ZONE OF THEORETICAL VISIBILITY TO 35KN (SW QUA
- CHAPTER 7 - FIGURE 7.23 BLADE TIP ZONE OF THEORETICAL VISIBILITY TO 35KN (NE QUA
- CHAPTER 7 - FIGURE 7.24 BLADE TIP ZONE OF THEORETICAL VISIBILITY TO 35KN (SE QUA
- CHAPTER 7 - FIGURE 7.25 HUB HEIGHT ZONE OF THEORETICAL VISIBILITY TO 35KN (NW QU
- CHAPTER 7 - FIGURE 7.26 HUB HEIGHT ZONE OF THEORETICAL VISIBILITY TO 35KN (SW QU
- CHAPTER 7 - FIGURE 7.27 HUB HEIGHT ZONE OF THEORETICAL VISIBILITY TO 35KN (NE QU
- CHAPTER 7 - FIGURE 7.28 HUB HEIGHT ZONE OF THEORETICAL VISIBILITY TO 35KN (SE QU
- CHAPTER 7 - FIGURE 7.29 OTHER WIND FARMS WITHIN 35KM WITH VIEWPOINTS
- CHAPTER 7 - FIGURE 7.30 OTHER WIND FARMS WITHIN 20KM WITH VIEWPOINTS
- CHAPTER 7 - FIGURE 7.31 CZTV OPERATIONAL DORENELL KILDRUMMY UPPER WHEEDLEMONT FA
- CHAPTER 7 - FIGURE 7.32 CZTV OPERATIONAL DUMMUIES GREENMYRE CAINBARROW EDINTORE
- CHAPTER 7 - FIGURE 7.33 CZTV OPERATIONAL ROTHES I ROTHES II PAULS HILL & BERRY B
- CHAPTER 7 - FIGURE 7.34 CZTV CONSENTED AULTMORE LURG HILL HILL OF TOWIE II & MEI
- CHAPTER 7 - FIGURE 7.35 CZTV CONSENTED KELLAS PULS HILL II MEIKLE HILL & BERRY B
- CHAPTER 7 - FIGURE 7.36 CZTV ON PLANNING CLASHINDARROCH II GARBET & CRAIG WATCH
- CHAPTER 7 - FIGURE 7.37 CZTV ON PLANNING ROTHES III & CLASH GOUR
- CHAPTER 8 - FIGURE 8.1 STATUTORY DESIGNATED SITES
- CHAPTER 8 - FIGURE 8.2 SURVEY AREA
- CHAPTER 8 - FIGURE 8.3 HABITATS SURVRY MAP
- CHAPTER 9 - FIGURE 9.1 STATUTORY DESIGNATED SITE
- CHAPTER10 - FIGURE 10.1 KNOWN CULTURAL HERITAGE ASSTS WITHIN ISA
- CHAPTER10 - FIGURE 10.2 CULTURAL HERITAGE VIEWPOINTS WITNIN OSA
- CHAPTER11 - FIGURE 11.1 LAND CAPABILITY FOR AGRICULTURE
- CHAPTER11 - FIGURE 11.2 BEDROCK GEOLOGY
- CHAPTER11 - FIGURE 11.3 SUPERFICIAL GEOLOGY
- CHAPTER11 - FIGURE 11.4 SOILS
- CHAPTER11 - FIGURE 11.5 INTERPOLATED PEAT DEPTH
- CHAPTER11 - FIGURE 11.6 HAZARD RANKING FOR PEAT LANDSLIDE RISK
- CHAPTER12 - FIGURE 12.1 SURFACE WATER CATCHMENTS
- CHAPTER 12 - FIGURE 12.2 ABSTRACTIONS PRIVATE WATER SUPPLIES & WELLS
- CHAPTER 12 - FIGURE 12.3 WATERCOURSE CROSSINGS
- CHAPTER 13 - FIGURE 13.1 ESR NOISE MONITORING LOCATIONS
- CHAPTER 13 - FIGURE 13.2 WIND TURBINE NOISE AT 10M S CLASINDAROCH EXTENSION
- CHAPTER 13 - FIGURE 13.2 WIND TURBINE NOISE AT 10M S CUMULATIVE
- CHAPTER 14 - FIGURE 14.1 STUDY AREA ROAD LINKS
- CHAPTER 14 - FIGURE 14.2 TRAFFIC COUNT LOCATION PLAN
- CHAPTER 14 - FIGURE 14.3 ACCIDENT LOCATION PLAN
- CHAPTER 14 - FIGURE 14.4 ABNORMAL INDIVISIBLE ROAD ROUTE
- CHAPTER 15 - FIGURE 15.1 AVIATION STUDY AREA & RECEPTOR LOCATIONS
- CHAPTER 17 - FIGURE 17.1 SHADOW FLICKER RECEPTORS
- CHAPTER 17 - FIGURE 17.2 SHADOW FLICKER EFFECTS
- CHAPTER 18 - FIGURE 18.2 FINAL LAYOUT & EE & THREEUK TELECOMMS LINK BUFFER
- VOLUME 2 TABLE OF CONTENTS
- FIGURE 10.3A- C- HERITAGE VIEWPOINT 1 CRAIG DORNEY HILLFORT
- FIGURE 10.4A- C- HERITAGE VIEWPOINT 2 BELDOENEY CASTLE
- FIGURE 10.5 - HERITAGE VIEWPOINT 3 BELDOENEY CASTLE
- FIGURE 10.6A-C - HERITAGE VIEWPOINT 4 TAP O' NORTH FORT
- FIGURE 10.7 - HERITAGE VIEWPOINT 5 TAP O' NORTH FORT
- FIGURE 10.8- HERITAGE VIEWPOINT 6 MITHER TAP FORT
- FIGURE 10.9A-B - HERITAGE VIEWPOINT 7 WORMY HILLOCK HENGE
- FIGURE 10.10 - HERITAGE VIEWPOINT 8 CNOC CAILLICHIE FORT
- FIGURE 10.11- HERITAGE VIEWPOINT 9 LULACHS STONE
- FIGURE 10.12- HERITAGE VIEWPOINT 10 ORD
- FIGURE 10.13- HERITAGE VIEWPOINT 11 GALLOWS HILL
- FIGURE 10.14- HERITAGE VIEWPOINT 12 MILL OF NORTH
- FIGURE 10.15- HERITAGE VIEWPOINT 13 BELL OF KNOWE
- FIGURE 10.16- HERITAGE VIEWPOINT 14 NETHER WHEEDLEMOUNT
- FIGURE 10.17 HERITAGE VIEWPOINT 15 CORRSTONE WOOD
- FIGURE 10.18 HERITAGE VIEWPOINT 16A DRUMINOR CASTLE
- FIGURE 10.19 HERITAGE VIEWPOINT 16B DRUMINOR CASTLE
- FIGURE 10.20 HERITAGE VIEWPOINT 17 DRYWELLS HUT CIRCLES
- FIGURE 7.38A -C - VIEWPOINT 1 A941 BALCKWATER BRIDGE
- FIGURE 7.39A -E - VIEWPOINT 2 MINOR ROAD NEAR BOGHEAD
- FIGURE 7.40A-C - VIEWPOINT 3 MINOR ROAD NEAR BACKSIDE
- FIGURE 7.41A-C - VIEWPOINT 4 MEIKLE FIRBRIGGS
- FIGURE 7.42A-E - VIEWPOINT 5 MINOR ROAD NEAR CABRACH PARISH CHURCH
- FIGURE 7.43A-C- VIEWPOINT 6 B9002 NEAR INNESBRAE
- FIGURE 7.44A-C- VIEWPOINT 7 A920 BETWEEN HUNTLY & DUFFTOWN
- FIGURE 7.45A-C- VIEWPOINT 8 CLASHMACH HILL
- FIGURE 7.46A-C- VIEWPOINT 9 TAP O' NORTH
- FIGURE 7.47A-C- VIEWPOINT 10 THE BUCK
- FIGURE 7.48A-C- VIEWPOINT 11 MEIKLE BALLOCH
- FIGURE 7.49A-C- VIEWPOINT 12 BEN AIGAN
- FIGURE 7.50A-C- VIEWPOINT 13 BEN RINNES
- FIGURE 7.51A-C- VIEWPOINT 14 LADDER HILLS LITTLE GEAL CHARN
- FIGURE 7.52A-C- VIEWPOINT 15 CORREN HILLS OLD MILITARY ROAD
- VOLUM 3 LANDSCAPE & VISUAL & CULTURAL HERITGATE VISUALS TABLE OF CONTENTS
- CHAPTER 4 - APPENDIX 4.1 OCEMP
- CHAPTER 6 - APPENDIX 6.1 APP A FIG 1 SITE LOCATION
- CHAPTER 6 - APPENDIX 6.1 APP A FIG 4 BLADE TIP ZTV WITH VIEWPOINTS
- CHAPTER 6 - APPENDIX 6.1 APP A FIG 11 DESIGN HERITAGE ASSETS IN OSA
- CHAPTER 6 - APPENDIX 6.1 APP A FIGURE 2 SCOPING TURBINE LAYOUT
- CHAPTER 6 - APPENDIX 6.1 APP A FIGURE 3 LANDSCAPE DESIGNATIONS
- CHAPTER 6 - APPENDIX 6.1 APP A FIGURE 5 CUMULATIVE DEVELOPMENTS
- CHAPTER 6 - APPENDIX 6.1 APP A FIGURE 6 VP LOCATIONS & VIEWDHEDS
- CHAPTER 6 - APPENDIX 6.1 APP A FIGURE 10 HERITAGE ASSETS IN SIA
- CHAPTER 6 - APPENDIX 6.1 SCOPING REPORT TEXT
- CHAPTER 6 - APPENDIX 6.2 SCOPING OPINION
- RVAAS APPENDIX 7.6 - FIGURE 1 RESIDENTAL PROPERTIES WITNIN 2KM
- RVAAS APPENDIX 7.6 - FIGURE 2 RESIDENTAIL PROPERTIES WITHIN TURBINE LIGTING INEN
- RVAAS APPENDIX 7.6 - FIGURE 3 ANGLE OF VIEW
- RVAAS APPENDIX 7.6 - FIGURE 4 29 RVAA WIRELINES
- RVAAS APPENDIX 7.6 - RESIDENTAIL VISUAL AMENITY ASSESSMENT
- APPENDIX 7.1 -LIVA CRITERIA
- APPENDIX 7.2 INFORMATION TO BE READ IN CONJUCTION WITH VISUALISATIONS
- APPENDIX 7.3 PRELIMINART ASSESSMENT TO LCTS
- APPENDIX 7.4 PRELIMINARY ASSESSMENT OF VISUAL RECEPTORS
- APPENDIX 7.5 VIEWPOINT ASSESSMENTS
- APPENDIX 7.7 EFFECT ON AIRNGORM NATIONAL PARK SPECIAL LANDSCAPE QUALITES
- APPENDIX 7.8 ADDITIONAL WIRELINES
- APPENDIX 7.9 ANNES PART 1 MIDDLETON PHOTOGRAPHIC RECORD
- APPENDIX 7.9 ANNEX 1 PART 2 EMLEY MOOR MAST PHOTOGRAPHIC RECORD
- APPENDIX 7.9 ASSESSMENT OF NIGHTIME LIGHTING ASSESSMENT CRITERIA & METHODOLOGY
- CHAPTER 8 - APPENDIX 8.1 - LEGISLATION
- CHAPTER 9 - APPENDIX 9.1 LEGISLATION
- CHAPTER 9 - APPENDIX 9.2 SURVEY TABLES
- CHAPTER 9 - APPENDIX 9.3 COLLISION RISK MODEL
- VOLUME 4A APPENDICES (CHAPTER 1-9) TABLE OF CONTENTS
- CHAPTER 10 - APPENDIX 10 - ARCHAEOLOGICAL DESK BASES ASSESSMENT & STATE 1 SETTI
- CHAPTER 11 - APPENDIX 11.1 FIGURE 1.1 - 1.10 PEAT DEPTH
- CHAPTER 11 - APPENDIX 11.1 FIGURE 2.1 - 2.10 SURFACE FIRMNESS
- CHAPTER 11 - APPENDIX 11.1 PEAT SURVEY REPORT
- CHAPTER 11 - APPENDIX 11.2 FIGURE 1 SLOPE GRADIENT
- CHAPTER 11 - APPENDIX 11.2 FIGURE 2 PEAT DEPTH INTERPOLATION
- CHAPTER 11 - APPENDIX 11.2 FIGURE 3 SUBSTRATE
- CHAPTER 11 - APPENDIX 11.2 FIGURE 4 SLOPE SHAPE
- CHAPTER 11 - APPENDIX 11.2 FIGURE 5 DRAINAGE PROXIMITY
- CHAPTER 11 - APPENDIX 11.2 FIGURE 6 HISTORIC INSTABILITY
- CHAPTER 11 - APPENDIX 11.2 FIGURE 7 LIKLIHOOD OF PEART INSTABILITY
- CHAPTER 11 - APPENDIX 11.2 FIGURE 8 POTENTIAL ADVERSE CONSEQUENCES
- CHAPTER 11 - APPENDIX 11.2 FIGURE 9.1 - 9.10 PEAT LANDSLIDE RISK
- CHAPTER 11 - APPENDIX 11.2 PEAT LANDSLIDE HAZARD RISK ASSESSMENT
- CHAPTER 11 - APPENDIX 11.3 OUTLINE PEAT & HABITAT MANAGEMENT PLAN
- CHAPTER 11 - APPENDIX 11.4 INPUT TO GEOTECHNICAL REGISTER
- CHAPTER 12 - APPENDIX 12.1 COSULATION CORRESPONDENCE
- CHAPTER 12 - APPENDIX 12.2 PRIVATE WATER SUPPLIES
- CHAPTER 12 - APPENDIX 12.3 HYDROREOLOGICAL CONCEPTUAL SITE MODEL SCHEMATICS
- CHAPTER 12 - APPENDIX 12.4 WATERCOURSE CROSSING SCHEDULE
- CHAPTER 12 - APPENDIX 12.5 PROPOSED DEVELOPMENT COMPONENTS PER CATCHMENT
- CHAPTER 13 - APPENDIX 13.1 FIELD DATA SHEET FOR 2001 NOISE SURVEY
- CHAPTER 13 - APPENDIX 13.2 BACKGROUND LEVELS FOR 2021 NOISE LEVELS
- CHAPTER 13 - APPENDIX 13.3 WIND TURBINE CO0ORDS TOPO ADJ & MANUFACURER NOISE DAT
- CHAPTER 13 - APPENDIX 13.4 WIND FARM NOISE PREDICTIONS AGAINST CUMULATIVE LIMITS
- CHAPTER 14 - APPENDIX 14.1 - TRANSPORT ASSESSMENT
- CHAPTER 14 - APPENDIX 14.2 CONSTUCTION TRAFFIC MANAGEMENT PLAN
- CHAPTER 14 - APPENDIX 14.3 ABNORMAL INDIVISIBLE LOAD ROUTE SURVEY - APPRNDIX B
- CHAPTER 14 - APPENDIX 14.3 ABNORMAL INDIVISIBLE LOAD ROUTE SURVEY - APPRNDIX B
- CHAPTER 14 - APPENDIX 14.3 ABNORMAL INDIVISIBLE LOAD ROUTE SURVEY - MAIN REPORT
- CHAPTER 14 - APPENDIX 14.4 ENVIRONMENTAL APPRAISAL OF OFFSITE ROADWORKS
- CHAPTER 15 - APPENDIX 15.1 AVIATION LIGHTING AND MITIGATION REPORT
- CHAPTER 17 - APPENDIX 17.1 SHADOWFLICKER GRAPHS FOR EACH AFFECTED DWELLING
- CHAPTER 20 - APPENDIX 20.1 CARBON BALANCE
- CHAPTER 10 - 20 - VOLUME 4B APPENDICES (CHAPER 10-20) TABLE OF CONTENTS
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Moray granted permission on 27 June 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Moray's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
Land Between Black Hill And Mount Of Haddoch Moray
Erection of temporary meteorological mast of maximum height of 80m for a period of up to three years on
Granted Full applications 5 docs -
Land Between Black Hill And Mount Of Haddoch Cabrach Huntly Moray
Install a temporary meteorological mast of maximum height 90 metres for a period of up to three years on
Granted Full applications 5 docs