Site West Of Clashindarroch Wind Farm Moray

Granted Moray 23/00047/S36 Dealt With By Scottish Executive

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Construct operate and decommission a wind farm with a generating capacity in excess of 50MW consisting of up to 22 wind turbines and associated infrastructure including a battery energy storage facility. Thirteen of the wind turbines have a ground to blade tip height of up to 200m and nine have a ground to blade tip height of up to 180m at

As published by the council, reference 23/00047/S36

Application record

Reference
23/00047/S36
Type
Dealt With By Scottish Executive
Status
Unknown
Decision
Granted As published: Raise No Objections
Received
13 Jan 2023
Validated
13 Jan 2023
Decided
27 Jun 2023
Ward
Speyside Glenlivet
Parish
Dufftown & District
Decision by
Committee - National/Major

Timeline

Dates from the published record

  1. 13 Jan 2023

    Received by Moray

  2. 27 Jun 2023

    Decision issued: Raise No Objections

  3. 5 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Energy Consent Unit Agent

4 applications on PlanIndex · across 2 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Infinergy Ltd Applicant

1 application on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

228 documents on file for this application

  • DETERMINATION DECISION LETTER Decision · 18 Dec 2025
  • STRATEGIC PLANNING AND DEVELOPMENT HOLDING Consultation Response · 13 Jun 2023
  • TRANSPORTATION MANAGER Consultation Response · 02 May 2023
  • MORAY FLOOD RISK MANAGEMENT Consultation Response · 22 Mar 2023
  • ABERDEEN ARCHAEOLOGY SERVICES Consultation Response · 03 Mar 2023
  • CONTAMINATED LAND Consultation Response · 02 Mar 2023
  • PRIVATE WATER SUPPLIES Consultation Response · 02 Mar 2023
  • MORAY ACCESS MANAGER Consultation Response · 28 Feb 2023
  • NON TECHNICAL SUMMARY Supporting Document · 09 Feb 2023
  • DESIGN AND ACCESS STATEMENT Supporting Document · 09 Feb 2023
  • LOCATION PLAN Drawing · 09 Feb 2023
  • PAC REPORT APPENDICES PART 1 Supporting Document · 09 Feb 2023
  • PAC REPORT APPENDICES PART 2 Supporting Document · 09 Feb 2023
  • PAC REPORT APPENDICES PART 3 Supporting Document · 09 Feb 2023
  • PAC REPORT Supporting Document · 09 Feb 2023
  • PLANNING STATEMENT Supporting Document · 09 Feb 2023
  • WRITTEN STATEMENT - CHAPTER 1 INTRODUCTIONS Supporting Document · 09 Feb 2023
  • WRITTEN STATEMENT - CHAPTER 2 SITE DESCRIPTION Supporting Document · 09 Feb 2023
  • WRITTEN STATEMENT - CHAPTER 3 ALTERNATIVES & SCHEME EVOLUTION Supporting Document · 09 Feb 2023
  • WRITTEN STATEMENT - CHAPTER 4 DESCRIPTION OF PROPOSED DEVELOPMENT Supporting Document · 09 Feb 2023
  • WRITTEN STATEMENT - CHAPTER 5 POLICY CONTEXT Supporting Document · 09 Feb 2023
  • WRITTEN STATEMENT - CHAPTER 6 EIA METHODOLOGY SCOPING & CONSULATION Supporting Document · 09 Feb 2023
  • WRITTEN STATEMENT - CHAPTER 7 LANDSCAPE & VISUAL Supporting Document · 09 Feb 2023
  • WRITTEN STATEMENT - CHAPTER 8 ECOLOGY Supporting Document · 09 Feb 2023
  • WRITTEN STATEMENT - CHAPTER 9 ORNITHOLOGY Supporting Document · 09 Feb 2023
  • WRITTEN STATEMENT - CHAPTER 10 CULTURAL HERITAGE Supporting Document · 09 Feb 2023
  • WRITTEN STATEMENT - CHAPTER 11 GEOLOGY & PEAT Supporting Document · 09 Feb 2023
  • WRITTEN STATEMENT - CHAPTER 12 HYDROLOGY & HYDROGEOLOGY Supporting Document · 09 Feb 2023
  • WRITTEN STATEMENT - CHAPTER 13 NOISE Supporting Document · 09 Feb 2023
  • WRITTEN STATEMENT - CHAPTER 14 TRAFFIC & TRANSPORT Supporting Document · 09 Feb 2023
  • WRITTEN STATEMENT - CHAPTER 15 AVIATION Supporting Document · 09 Feb 2023
  • WRITTEN STATEMENT - CHAPTER 16 SOCIO ECONOMICS TOURISM & RECREATION Supporting Document · 09 Feb 2023
  • WRITTEN STATEMENT - CHAPTER 17 SHADOW FLICKER Supporting Document · 09 Feb 2023
  • WRITTEN STATEMENT - CHAPTER 18 TELECOMMUNICATIONS & UTILITIES Supporting Document · 09 Feb 2023
  • WRITTEN STATEMENT - CHAPTER 19 HEALTH & SAFETY Supporting Document · 09 Feb 2023
  • WRITTEN STATEMENT - CHAPTER 20 CLIMATE CHANGE & CARBON BALANCE Supporting Document · 09 Feb 2023
  • WRITTEN STATEMENT - TABLE OF CONTENTS Supporting Document · 09 Feb 2023
  • WRITTEN STATEMENT - CONTRIBUTIONG CONSULATANTS Supporting Document · 09 Feb 2023
  • FIGURES - CHAPTER 2 FIGURE 2.1 GEOGRAPHICAL CONTEXT Supporting Document · 09 Feb 2023
  • FIGURES - CHAPTER 2 FIGURE 2.2 THE SITE IN DETAIL Supporting Document · 09 Feb 2023
  • FIGURES - CHAPTER 3 FIGURE 3.1 INITIAL PRE SCOPING LAYOUT & SCOPING LAYOUT Supporting Document · 09 Feb 2023
  • FIGURES - CHAPTER 3 FIGURE 3.2 SITE CONSTAINTS MAP Supporting Document · 09 Feb 2023
  • FIGURES - CHAPTER 3 FIGURE 3.3 PRE WORKSHOP LAYOUT & WORKSHOP LAYOUT Supporting Document · 09 Feb 2023
  • FIGURES - CHAPTER 3 FIGURE 3.4 LAYOUT (ALTERATIONS 5) & LAYOUT (ALTERATIONS 6) Supporting Document · 09 Feb 2023
  • FIGURES - CHAPTER 3 FIGURE 3.5 SUBSTATION & BATTERY STORAGE LOCATIONS Supporting Document · 09 Feb 2023
  • FIGURES - CHAPTER 3 FIGURE 3.6 BORROW WAORKING SEACH AREA OPTIONS Supporting Document · 09 Feb 2023
  • PROPOSED DEVELOPMENT LAYOUT Drawing · 09 Feb 2023
  • WIND TURBINE 200M Drawing · 09 Feb 2023
  • WIND TURBINE 180 Drawing · 09 Feb 2023
  • FOUNDATION DESIGN Drawing · 09 Feb 2023
  • CRANE HARDSTANDING Drawing · 09 Feb 2023
  • ACCESS TRACK SECTIONS Drawing · 09 Feb 2023
  • CULVERT DETAIL Drawing · 09 Feb 2023
  • CONSTRUCTION COMPOUND Drawing · 09 Feb 2023
  • SUBSTATION & BESS COMPOUND LAYOUT Drawing · 09 Feb 2023
  • SUBSTATION & BESS COMPOUND ELEVATIONS Drawing · 09 Feb 2023
  • SSEN CONTROL BUILDING ELEVATIONS Drawing · 09 Feb 2023
  • CONTROL BUILDING ELEVATIONS Drawing · 09 Feb 2023
  • CABLE TRENCH DETAIL Drawing · 09 Feb 2023
  • BORROW WORKING ONE PRELIMINARY DESIGN Drawing · 09 Feb 2023
  • BORROW WORKING THREE PRELIMINARY DESIGN Drawing · 09 Feb 2023
  • BORROW WORKING FIVE PRELIMINARY DESIGN Drawing · 09 Feb 2023
  • SITE ACCESS JUNCTION Drawing · 09 Feb 2023
  • CHAPTER 4 - FIGURE 4.18 INDICATIVE CONTRUCTION PROGRAMME Supporting Document · 09 Feb 2023
  • CHAPTER 7 - FIGURE 7.1 SITE LOCATION & INITIAL LVIA 35KM STUDY AREA Supporting Document · 09 Feb 2023
  • CHAPTER 7 - FIGURE 7.2 SITE LOCATION & DETAILED 20KM LVIA STUDY AREA Supporting Document · 09 Feb 2023
  • CHAPTER 7 - FIGURE 7.3 CUMULATIVE ZTV CLASHINDARROCH EXTENSION & EXISTING CLASHI Supporting Document · 09 Feb 2023
  • CHAPTER 7 - FIGURE 7.4 CUMULATIVE ZTV CLASHINDARROCH EXTENSION & EXISTING CLASHI Supporting Document · 09 Feb 2023
  • CHAPTER 7 - FIGURE 7.5 BLADE TIP ZONE OF THEORETICAL VISIBILITY TO 35KM WITH VIE Supporting Document · 09 Feb 2023
  • CHAPTER 7 - FIGURE 7.6 BLADE TIP ZONE OF THEORETICAL VISIBILITY TO 20KM WITH VIE Supporting Document · 09 Feb 2023
  • CHAPTER 7 - FIGURE 7.7 HUB HEIGHT ZONE OF THEORETICAL VISIBILITY TO 35KM WITH VI Supporting Document · 09 Feb 2023
  • CHAPTER 7 - FIGURE 7.8 HUB HEIGHT ZONE OF THEORETICAL VISIBILITY TO 20KM WITH VI Supporting Document · 09 Feb 2023
  • CHAPTER 7 - FIGURE 7.9 LIT TURBINE ZONE OF THEORETICAL VISIBILITY TO 35KM WITH V Supporting Document · 09 Feb 2023
  • CHAPTER 7 - FIGURE 7.10 TURBINE LIGHTING INTENSITY TO 20KM WITH VIEWPOINTS Supporting Document · 09 Feb 2023
  • CHAPTER 7 - FIGURE 7.11 LANDSCAPE DESIGNATIONS WITNIN 35KM WITH VIEWPOINTS Supporting Document · 09 Feb 2023
  • CHAPTER 7 - FIGURE 7.12 LANDSCAPE DESIGNATIONS WITNIN 20KM WITH VIEWPOINTS Supporting Document · 09 Feb 2023
  • CHAPTER 7 - FIGURE 7.13 LANDSCAPE DESIGNATIONS WITNIN 20KM WITH BLADE TIP ZTV & Supporting Document · 09 Feb 2023
  • CHAPTER 7 - FIGURE 7.14 LANDSCAPE CHARACTER TYPES WITHIN 35KM WITH VIEWPOINTS Supporting Document · 09 Feb 2023
  • CHAPTER 7 - FIGURE 7.15 LANDSCAPE CHARACTER TYPES WITHIN 20KM WITH VIEWPOINTS Supporting Document · 09 Feb 2023
  • CHAPTER 7 - FIGURE 7.16 LANDSCAPE CHARACTER TYPES WITHIN 20KM WITH BLADE TIP ZTV Supporting Document · 09 Feb 2023
  • CHAPTER 7 - FIGURE 7.17 TOPOGRAPHY WITNIN 35KM WITH VIEWPOINTS Supporting Document · 09 Feb 2023
  • CHAPTER 7 - FIGURE 7.18 LOCAL LANDSCAPE CONTEXT TO 5KM Supporting Document · 09 Feb 2023
  • CHAPTER 7 - FIGURE 7.19 PRINCIPAL VISUAL RECEPTORS WITHIN 35KM WITH VIEWPOINTS Supporting Document · 09 Feb 2023
  • CHAPTER 7 - FIGURE 7.20 PRICIPAL VISUAL RECEPTORS WITHIN 20KM WITH BLADE TIP ZTV Supporting Document · 09 Feb 2023
  • CHAPTER 7 - FIGURE 7.21 BLADE TIP ZONE OF THEORETICAL VISIBILITY TO 35KN (NW QUA Supporting Document · 09 Feb 2023
  • CHAPTER 7 - FIGURE 7.22 BLADE TIP ZONE OF THEORETICAL VISIBILITY TO 35KN (SW QUA Supporting Document · 09 Feb 2023
  • CHAPTER 7 - FIGURE 7.23 BLADE TIP ZONE OF THEORETICAL VISIBILITY TO 35KN (NE QUA Supporting Document · 09 Feb 2023
  • CHAPTER 7 - FIGURE 7.24 BLADE TIP ZONE OF THEORETICAL VISIBILITY TO 35KN (SE QUA Supporting Document · 09 Feb 2023
  • CHAPTER 7 - FIGURE 7.25 HUB HEIGHT ZONE OF THEORETICAL VISIBILITY TO 35KN (NW QU Supporting Document · 09 Feb 2023
  • CHAPTER 7 - FIGURE 7.26 HUB HEIGHT ZONE OF THEORETICAL VISIBILITY TO 35KN (SW QU Supporting Document · 09 Feb 2023
  • CHAPTER 7 - FIGURE 7.27 HUB HEIGHT ZONE OF THEORETICAL VISIBILITY TO 35KN (NE QU Supporting Document · 09 Feb 2023
  • CHAPTER 7 - FIGURE 7.28 HUB HEIGHT ZONE OF THEORETICAL VISIBILITY TO 35KN (SE QU Supporting Document · 09 Feb 2023
  • CHAPTER 7 - FIGURE 7.29 OTHER WIND FARMS WITHIN 35KM WITH VIEWPOINTS Supporting Document · 09 Feb 2023
  • CHAPTER 7 - FIGURE 7.30 OTHER WIND FARMS WITHIN 20KM WITH VIEWPOINTS Supporting Document · 09 Feb 2023
  • CHAPTER 7 - FIGURE 7.31 CZTV OPERATIONAL DORENELL KILDRUMMY UPPER WHEEDLEMONT FA Supporting Document · 09 Feb 2023
  • CHAPTER 7 - FIGURE 7.32 CZTV OPERATIONAL DUMMUIES GREENMYRE CAINBARROW EDINTORE Supporting Document · 09 Feb 2023
  • CHAPTER 7 - FIGURE 7.33 CZTV OPERATIONAL ROTHES I ROTHES II PAULS HILL & BERRY B Supporting Document · 09 Feb 2023
  • CHAPTER 7 - FIGURE 7.34 CZTV CONSENTED AULTMORE LURG HILL HILL OF TOWIE II & MEI Supporting Document · 09 Feb 2023
  • CHAPTER 7 - FIGURE 7.35 CZTV CONSENTED KELLAS PULS HILL II MEIKLE HILL & BERRY B Supporting Document · 09 Feb 2023
  • CHAPTER 7 - FIGURE 7.36 CZTV ON PLANNING CLASHINDARROCH II GARBET & CRAIG WATCH Supporting Document · 09 Feb 2023
  • CHAPTER 7 - FIGURE 7.37 CZTV ON PLANNING ROTHES III & CLASH GOUR Supporting Document · 09 Feb 2023
  • CHAPTER 8 - FIGURE 8.1 STATUTORY DESIGNATED SITES Supporting Document · 09 Feb 2023
  • CHAPTER 8 - FIGURE 8.2 SURVEY AREA Supporting Document · 09 Feb 2023
  • CHAPTER 8 - FIGURE 8.3 HABITATS SURVRY MAP Supporting Document · 09 Feb 2023
  • CHAPTER 9 - FIGURE 9.1 STATUTORY DESIGNATED SITE Supporting Document · 09 Feb 2023
  • CHAPTER10 - FIGURE 10.1 KNOWN CULTURAL HERITAGE ASSTS WITHIN ISA Supporting Document · 09 Feb 2023
  • CHAPTER10 - FIGURE 10.2 CULTURAL HERITAGE VIEWPOINTS WITNIN OSA Supporting Document · 09 Feb 2023
  • CHAPTER11 - FIGURE 11.1 LAND CAPABILITY FOR AGRICULTURE Supporting Document · 09 Feb 2023
  • CHAPTER11 - FIGURE 11.2 BEDROCK GEOLOGY Supporting Document · 09 Feb 2023
  • CHAPTER11 - FIGURE 11.3 SUPERFICIAL GEOLOGY Supporting Document · 09 Feb 2023
  • CHAPTER11 - FIGURE 11.4 SOILS Supporting Document · 09 Feb 2023
  • CHAPTER11 - FIGURE 11.5 INTERPOLATED PEAT DEPTH Supporting Document · 09 Feb 2023
  • CHAPTER11 - FIGURE 11.6 HAZARD RANKING FOR PEAT LANDSLIDE RISK Supporting Document · 09 Feb 2023
  • CHAPTER12 - FIGURE 12.1 SURFACE WATER CATCHMENTS Supporting Document · 09 Feb 2023
  • CHAPTER 12 - FIGURE 12.2 ABSTRACTIONS PRIVATE WATER SUPPLIES & WELLS Supporting Document · 09 Feb 2023
  • CHAPTER 12 - FIGURE 12.3 WATERCOURSE CROSSINGS Supporting Document · 09 Feb 2023
  • CHAPTER 13 - FIGURE 13.1 ESR NOISE MONITORING LOCATIONS Supporting Document · 09 Feb 2023
  • CHAPTER 13 - FIGURE 13.2 WIND TURBINE NOISE AT 10M S CLASINDAROCH EXTENSION Supporting Document · 09 Feb 2023
  • CHAPTER 13 - FIGURE 13.2 WIND TURBINE NOISE AT 10M S CUMULATIVE Supporting Document · 09 Feb 2023
  • CHAPTER 14 - FIGURE 14.1 STUDY AREA ROAD LINKS Supporting Document · 09 Feb 2023
  • CHAPTER 14 - FIGURE 14.2 TRAFFIC COUNT LOCATION PLAN Supporting Document · 09 Feb 2023
  • CHAPTER 14 - FIGURE 14.3 ACCIDENT LOCATION PLAN Supporting Document · 09 Feb 2023
  • CHAPTER 14 - FIGURE 14.4 ABNORMAL INDIVISIBLE ROAD ROUTE Supporting Document · 09 Feb 2023
  • CHAPTER 15 - FIGURE 15.1 AVIATION STUDY AREA & RECEPTOR LOCATIONS Supporting Document · 09 Feb 2023
  • CHAPTER 17 - FIGURE 17.1 SHADOW FLICKER RECEPTORS Supporting Document · 09 Feb 2023
  • CHAPTER 17 - FIGURE 17.2 SHADOW FLICKER EFFECTS Supporting Document · 09 Feb 2023
  • CHAPTER 18 - FIGURE 18.2 FINAL LAYOUT & EE & THREEUK TELECOMMS LINK BUFFER Supporting Document · 09 Feb 2023
  • VOLUME 2 TABLE OF CONTENTS Supporting Document · 09 Feb 2023
  • FIGURE 10.3A- C- HERITAGE VIEWPOINT 1 CRAIG DORNEY HILLFORT Supporting Document · 09 Feb 2023
  • FIGURE 10.4A- C- HERITAGE VIEWPOINT 2 BELDOENEY CASTLE Supporting Document · 09 Feb 2023
  • FIGURE 10.5 - HERITAGE VIEWPOINT 3 BELDOENEY CASTLE Supporting Document · 09 Feb 2023
  • FIGURE 10.6A-C - HERITAGE VIEWPOINT 4 TAP O' NORTH FORT Supporting Document · 09 Feb 2023
  • FIGURE 10.7 - HERITAGE VIEWPOINT 5 TAP O' NORTH FORT Supporting Document · 09 Feb 2023
  • FIGURE 10.8- HERITAGE VIEWPOINT 6 MITHER TAP FORT Supporting Document · 09 Feb 2023
  • FIGURE 10.9A-B - HERITAGE VIEWPOINT 7 WORMY HILLOCK HENGE Supporting Document · 09 Feb 2023
  • FIGURE 10.10 - HERITAGE VIEWPOINT 8 CNOC CAILLICHIE FORT Supporting Document · 09 Feb 2023
  • FIGURE 10.11- HERITAGE VIEWPOINT 9 LULACHS STONE Supporting Document · 09 Feb 2023
  • FIGURE 10.12- HERITAGE VIEWPOINT 10 ORD Supporting Document · 09 Feb 2023
  • FIGURE 10.13- HERITAGE VIEWPOINT 11 GALLOWS HILL Supporting Document · 09 Feb 2023
  • FIGURE 10.14- HERITAGE VIEWPOINT 12 MILL OF NORTH Supporting Document · 09 Feb 2023
  • FIGURE 10.15- HERITAGE VIEWPOINT 13 BELL OF KNOWE Supporting Document · 09 Feb 2023
  • FIGURE 10.16- HERITAGE VIEWPOINT 14 NETHER WHEEDLEMOUNT Supporting Document · 09 Feb 2023
  • FIGURE 10.17 HERITAGE VIEWPOINT 15 CORRSTONE WOOD Supporting Document · 09 Feb 2023
  • FIGURE 10.18 HERITAGE VIEWPOINT 16A DRUMINOR CASTLE Supporting Document · 09 Feb 2023
  • FIGURE 10.19 HERITAGE VIEWPOINT 16B DRUMINOR CASTLE Supporting Document · 09 Feb 2023
  • FIGURE 10.20 HERITAGE VIEWPOINT 17 DRYWELLS HUT CIRCLES Supporting Document · 09 Feb 2023
  • FIGURE 7.38A -C - VIEWPOINT 1 A941 BALCKWATER BRIDGE Supporting Document · 09 Feb 2023
  • FIGURE 7.39A -E - VIEWPOINT 2 MINOR ROAD NEAR BOGHEAD Supporting Document · 09 Feb 2023
  • FIGURE 7.40A-C - VIEWPOINT 3 MINOR ROAD NEAR BACKSIDE Supporting Document · 09 Feb 2023
  • FIGURE 7.41A-C - VIEWPOINT 4 MEIKLE FIRBRIGGS Supporting Document · 09 Feb 2023
  • FIGURE 7.42A-E - VIEWPOINT 5 MINOR ROAD NEAR CABRACH PARISH CHURCH Supporting Document · 09 Feb 2023
  • FIGURE 7.43A-C- VIEWPOINT 6 B9002 NEAR INNESBRAE Supporting Document · 09 Feb 2023
  • FIGURE 7.44A-C- VIEWPOINT 7 A920 BETWEEN HUNTLY & DUFFTOWN Supporting Document · 09 Feb 2023
  • FIGURE 7.45A-C- VIEWPOINT 8 CLASHMACH HILL Supporting Document · 09 Feb 2023
  • FIGURE 7.46A-C- VIEWPOINT 9 TAP O' NORTH Supporting Document · 09 Feb 2023
  • FIGURE 7.47A-C- VIEWPOINT 10 THE BUCK Supporting Document · 09 Feb 2023
  • FIGURE 7.48A-C- VIEWPOINT 11 MEIKLE BALLOCH Supporting Document · 09 Feb 2023
  • FIGURE 7.49A-C- VIEWPOINT 12 BEN AIGAN Supporting Document · 09 Feb 2023
  • FIGURE 7.50A-C- VIEWPOINT 13 BEN RINNES Supporting Document · 09 Feb 2023
  • FIGURE 7.51A-C- VIEWPOINT 14 LADDER HILLS LITTLE GEAL CHARN Supporting Document · 09 Feb 2023
  • FIGURE 7.52A-C- VIEWPOINT 15 CORREN HILLS OLD MILITARY ROAD Supporting Document · 09 Feb 2023
  • VOLUM 3 LANDSCAPE & VISUAL & CULTURAL HERITGATE VISUALS TABLE OF CONTENTS Supporting Document · 09 Feb 2023
  • CHAPTER 4 - APPENDIX 4.1 OCEMP Supporting Document · 09 Feb 2023
  • CHAPTER 6 - APPENDIX 6.1 APP A FIG 1 SITE LOCATION Supporting Document · 09 Feb 2023
  • CHAPTER 6 - APPENDIX 6.1 APP A FIG 4 BLADE TIP ZTV WITH VIEWPOINTS Supporting Document · 09 Feb 2023
  • CHAPTER 6 - APPENDIX 6.1 APP A FIG 11 DESIGN HERITAGE ASSETS IN OSA Supporting Document · 09 Feb 2023
  • CHAPTER 6 - APPENDIX 6.1 APP A FIGURE 2 SCOPING TURBINE LAYOUT Supporting Document · 09 Feb 2023
  • CHAPTER 6 - APPENDIX 6.1 APP A FIGURE 3 LANDSCAPE DESIGNATIONS Supporting Document · 09 Feb 2023
  • CHAPTER 6 - APPENDIX 6.1 APP A FIGURE 5 CUMULATIVE DEVELOPMENTS Supporting Document · 09 Feb 2023
  • CHAPTER 6 - APPENDIX 6.1 APP A FIGURE 6 VP LOCATIONS & VIEWDHEDS Supporting Document · 09 Feb 2023
  • CHAPTER 6 - APPENDIX 6.1 APP A FIGURE 10 HERITAGE ASSETS IN SIA Supporting Document · 09 Feb 2023
  • CHAPTER 6 - APPENDIX 6.1 SCOPING REPORT TEXT Supporting Document · 09 Feb 2023
  • CHAPTER 6 - APPENDIX 6.2 SCOPING OPINION Supporting Document · 09 Feb 2023
  • RVAAS APPENDIX 7.6 - FIGURE 1 RESIDENTAL PROPERTIES WITNIN 2KM Supporting Document · 09 Feb 2023
  • RVAAS APPENDIX 7.6 - FIGURE 2 RESIDENTAIL PROPERTIES WITHIN TURBINE LIGTING INEN Supporting Document · 09 Feb 2023
  • RVAAS APPENDIX 7.6 - FIGURE 3 ANGLE OF VIEW Supporting Document · 09 Feb 2023
  • RVAAS APPENDIX 7.6 - FIGURE 4 29 RVAA WIRELINES Supporting Document · 09 Feb 2023
  • RVAAS APPENDIX 7.6 - RESIDENTAIL VISUAL AMENITY ASSESSMENT Supporting Document · 09 Feb 2023
  • APPENDIX 7.1 -LIVA CRITERIA Supporting Document · 09 Feb 2023
  • APPENDIX 7.2 INFORMATION TO BE READ IN CONJUCTION WITH VISUALISATIONS Supporting Document · 09 Feb 2023
  • APPENDIX 7.3 PRELIMINART ASSESSMENT TO LCTS Supporting Document · 09 Feb 2023
  • APPENDIX 7.4 PRELIMINARY ASSESSMENT OF VISUAL RECEPTORS Supporting Document · 09 Feb 2023
  • APPENDIX 7.5 VIEWPOINT ASSESSMENTS Supporting Document · 09 Feb 2023
  • APPENDIX 7.7 EFFECT ON AIRNGORM NATIONAL PARK SPECIAL LANDSCAPE QUALITES Supporting Document · 09 Feb 2023
  • APPENDIX 7.8 ADDITIONAL WIRELINES Supporting Document · 09 Feb 2023
  • APPENDIX 7.9 ANNES PART 1 MIDDLETON PHOTOGRAPHIC RECORD Supporting Document · 09 Feb 2023
  • APPENDIX 7.9 ANNEX 1 PART 2 EMLEY MOOR MAST PHOTOGRAPHIC RECORD Supporting Document · 09 Feb 2023
  • APPENDIX 7.9 ASSESSMENT OF NIGHTIME LIGHTING ASSESSMENT CRITERIA & METHODOLOGY Supporting Document · 09 Feb 2023
  • CHAPTER 8 - APPENDIX 8.1 - LEGISLATION Supporting Document · 09 Feb 2023
  • CHAPTER 9 - APPENDIX 9.1 LEGISLATION Supporting Document · 09 Feb 2023
  • CHAPTER 9 - APPENDIX 9.2 SURVEY TABLES Supporting Document · 09 Feb 2023
  • CHAPTER 9 - APPENDIX 9.3 COLLISION RISK MODEL Supporting Document · 09 Feb 2023
  • VOLUME 4A APPENDICES (CHAPTER 1-9) TABLE OF CONTENTS Supporting Document · 09 Feb 2023
  • CHAPTER 10 - APPENDIX 10 - ARCHAEOLOGICAL DESK BASES ASSESSMENT & STATE 1 SETTI Supporting Document · 09 Feb 2023
  • CHAPTER 11 - APPENDIX 11.1 FIGURE 1.1 - 1.10 PEAT DEPTH Supporting Document · 09 Feb 2023
  • CHAPTER 11 - APPENDIX 11.1 FIGURE 2.1 - 2.10 SURFACE FIRMNESS Supporting Document · 09 Feb 2023
  • CHAPTER 11 - APPENDIX 11.1 PEAT SURVEY REPORT Supporting Document · 09 Feb 2023
  • CHAPTER 11 - APPENDIX 11.2 FIGURE 1 SLOPE GRADIENT Supporting Document · 09 Feb 2023
  • CHAPTER 11 - APPENDIX 11.2 FIGURE 2 PEAT DEPTH INTERPOLATION Supporting Document · 09 Feb 2023
  • CHAPTER 11 - APPENDIX 11.2 FIGURE 3 SUBSTRATE Supporting Document · 09 Feb 2023
  • CHAPTER 11 - APPENDIX 11.2 FIGURE 4 SLOPE SHAPE Supporting Document · 09 Feb 2023
  • CHAPTER 11 - APPENDIX 11.2 FIGURE 5 DRAINAGE PROXIMITY Supporting Document · 09 Feb 2023
  • CHAPTER 11 - APPENDIX 11.2 FIGURE 6 HISTORIC INSTABILITY Supporting Document · 09 Feb 2023
  • CHAPTER 11 - APPENDIX 11.2 FIGURE 7 LIKLIHOOD OF PEART INSTABILITY Supporting Document · 09 Feb 2023
  • CHAPTER 11 - APPENDIX 11.2 FIGURE 8 POTENTIAL ADVERSE CONSEQUENCES Supporting Document · 09 Feb 2023
  • CHAPTER 11 - APPENDIX 11.2 FIGURE 9.1 - 9.10 PEAT LANDSLIDE RISK Supporting Document · 09 Feb 2023
  • CHAPTER 11 - APPENDIX 11.2 PEAT LANDSLIDE HAZARD RISK ASSESSMENT Supporting Document · 09 Feb 2023
  • CHAPTER 11 - APPENDIX 11.3 OUTLINE PEAT & HABITAT MANAGEMENT PLAN Supporting Document · 09 Feb 2023
  • CHAPTER 11 - APPENDIX 11.4 INPUT TO GEOTECHNICAL REGISTER Supporting Document · 09 Feb 2023
  • CHAPTER 12 - APPENDIX 12.1 COSULATION CORRESPONDENCE Supporting Document · 09 Feb 2023
  • CHAPTER 12 - APPENDIX 12.2 PRIVATE WATER SUPPLIES Supporting Document · 09 Feb 2023
  • CHAPTER 12 - APPENDIX 12.3 HYDROREOLOGICAL CONCEPTUAL SITE MODEL SCHEMATICS Supporting Document · 09 Feb 2023
  • CHAPTER 12 - APPENDIX 12.4 WATERCOURSE CROSSING SCHEDULE Supporting Document · 09 Feb 2023
  • CHAPTER 12 - APPENDIX 12.5 PROPOSED DEVELOPMENT COMPONENTS PER CATCHMENT Supporting Document · 09 Feb 2023
  • CHAPTER 13 - APPENDIX 13.1 FIELD DATA SHEET FOR 2001 NOISE SURVEY Supporting Document · 09 Feb 2023
  • CHAPTER 13 - APPENDIX 13.2 BACKGROUND LEVELS FOR 2021 NOISE LEVELS Supporting Document · 09 Feb 2023
  • CHAPTER 13 - APPENDIX 13.3 WIND TURBINE CO0ORDS TOPO ADJ & MANUFACURER NOISE DAT Supporting Document · 09 Feb 2023
  • CHAPTER 13 - APPENDIX 13.4 WIND FARM NOISE PREDICTIONS AGAINST CUMULATIVE LIMITS Supporting Document · 09 Feb 2023
  • CHAPTER 14 - APPENDIX 14.1 - TRANSPORT ASSESSMENT Supporting Document · 09 Feb 2023
  • CHAPTER 14 - APPENDIX 14.2 CONSTUCTION TRAFFIC MANAGEMENT PLAN Supporting Document · 09 Feb 2023
  • CHAPTER 14 - APPENDIX 14.3 ABNORMAL INDIVISIBLE LOAD ROUTE SURVEY - APPRNDIX B Supporting Document · 09 Feb 2023
  • CHAPTER 14 - APPENDIX 14.3 ABNORMAL INDIVISIBLE LOAD ROUTE SURVEY - APPRNDIX B Supporting Document · 09 Feb 2023
  • CHAPTER 14 - APPENDIX 14.3 ABNORMAL INDIVISIBLE LOAD ROUTE SURVEY - MAIN REPORT Supporting Document · 09 Feb 2023
  • CHAPTER 14 - APPENDIX 14.4 ENVIRONMENTAL APPRAISAL OF OFFSITE ROADWORKS Supporting Document · 09 Feb 2023
  • CHAPTER 15 - APPENDIX 15.1 AVIATION LIGHTING AND MITIGATION REPORT Supporting Document · 09 Feb 2023
  • CHAPTER 17 - APPENDIX 17.1 SHADOWFLICKER GRAPHS FOR EACH AFFECTED DWELLING Supporting Document · 09 Feb 2023
  • CHAPTER 20 - APPENDIX 20.1 CARBON BALANCE Supporting Document · 09 Feb 2023
  • CHAPTER 10 - 20 - VOLUME 4B APPENDICES (CHAPER 10-20) TABLE OF CONTENTS Supporting Document · 09 Feb 2023

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Moray granted permission on 27 June 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.