Planning application
Freelands Lossiemouth Moray IV31 6QP
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Alter and extend dwellinghouse at
As published by the council, reference 22/01788/APP
Application record
- Reference
- 22/01788/APP
- Type
- Application for Planning Permission
- Status
- Decided
- Decision
- Permitted
- Received
- 30 Nov 2022
- Validated
- 16 Dec 2022
- Decided
- 2 Feb 2023
- Ward
- Heldon And Laich
- Parish
- Lossiemouth
- Decision by
- Delegated Power
- Postcode
- IV31 6QP
Timeline
Dates from the published record
-
30 Nov 2022
Received by Moray
-
16 Dec 2022
Validated
Checked as complete and ready for consideration.
-
2 Feb 2023
Decision issued: Permitted
-
5 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in Moray
58 applications on PlanIndex · 100% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Norland Stotfield Road Lossiemouth Moray IV31 6QP
Erection of 2no self catering apartments at
Granted Full applications New dwelling 8 docs -
Norland Stotfield Road Lossiemouth Moray IV31 6QP
Change of use of B&B and extensions to form 6 separate apartments at
Withdrawn Full applications New dwelling Extension -
Norland Stotfield Road Lossiemouth Moray IV31 6QP
Change of use and development to form 8 separate apartments at
Withdrawn Full applications New dwelling -
Norland Stotfield Road Lossiemouth Moray IV31 6QP
Erection of 2no self-catering apartments (east wing) at
Refused Full applications New dwelling 10 docs -
Moray Golf Club Stotfield Road Lossiemouth Moray IV31 6QS
Erect a fascia sign at Golf Professional Shop
Granted Advertising 4 docs -
Moray Golf Club Stotfield Road Lossiemouth Moray IV31 6QS
Demolish existing shop and erect new golf pro shop at
Granted Full applications Demolition 9 docs
Other full applications applications
In Moray
-
26/00390/APP Granted
Brodieshill Farmhouse Forres Moray IV36 2QU
Change of use of children's play unit to letting unit at
-
25/01064/APP Granted
Dunes 100 Metres East Of Last Beach Hut Hopeman East Beach Moray
Retrospective consent to site and operate a mobile sauna for 4 days a week on
-
26/00677/APP Granted
Rothes Tennis Club Rothes Recreation Park Station Street Rothes Moray
Change existing metal halide floodlighting to LED at
-
26/01105/APP Awaiting decision
27 Cuthil Road Keith Moray AB55 5AS
Retrospective application to replace timber garage with steel framed metal clad garage at
-
26/00757/APP Granted
Tarnash Farm Keith Moray AB55 5PB
Change of use from agricultural land to equestrian land with construction of riding area fencing and lighting poles at