Skip to content
PlanIndex Get alerts
Menu

Planning application

Coel Na Mara 26 Queen's Drive Cullen Buckie Moray AB56 4XF

Granted Moray 22/01770/APP Application for Planning Permission

Works: Extension Loft or dormer

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Convert garage to living accommodation roof dormer extension and alter existing vehicular access at

As published by the council, reference 22/01770/APP

Application record

Reference
22/01770/APP
Type
Application for Planning Permission
Status
Decided
Decision
Permitted
Received
28 Nov 2022
Validated
28 Nov 2022
Decided
16 Mar 2023
Ward
Keith And Cullen
Parish
Cullen & Deskford
Decision by
Delegated Power
Postcode
AB56 4XF

Timeline

Dates from the published record

  1. 28 Nov 2022

    Received by Moray

  2. 16 Mar 2023

    Decision issued: Permitted

  3. 5 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In Moray

  • 26/00390/APP Granted

    Brodieshill Farmhouse Forres Moray IV36 2QU

    Change of use of children's play unit to letting unit at

    1 Apr 2026 Full applications
  • 25/01064/APP Granted

    Dunes 100 Metres East Of Last Beach Hut Hopeman East Beach Moray

    Retrospective consent to site and operate a mobile sauna for 4 days a week on

    28 Aug 2025 Full applications
  • 26/00677/APP Granted

    Rothes Tennis Club Rothes Recreation Park Station Street Rothes Moray

    Change existing metal halide floodlighting to LED at

    29 May 2026 Full applications
  • 26/01105/APP Awaiting decision

    27 Cuthil Road Keith Moray AB55 5AS

    Retrospective application to replace timber garage with steel framed metal clad garage at

    1 Sep 2026 Full applications
  • 26/00757/APP Granted

    Tarnash Farm Keith Moray AB55 5PB

    Change of use from agricultural land to equestrian land with construction of riding area fencing and lighting poles at

    16 Jun 2026 Full applications