Skip to content
PlanIndex Get alerts
Menu

Planning application

Hopeman Lodge Lodge Road Hopeman Elgin Moray IV30 5YA

Granted Moray 22/01578/LBC Listed Building Consent

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Amendment consent ref 16/00306/LBC to alter and extend dwellinghouse at

As published by the council, reference 22/01578/LBC

Application record

Reference
22/01578/LBC
Type
Listed Building Consent
Status
Decided
Decision
Granted As published: Permitted
Received
26 Oct 2022
Validated
30 Nov 2022
Decided
4 May 2023
Ward
Heldon And Laich
Parish
Hopeman & Covesea
Decision by
Delegated Power
Postcode
IV30 5YA

Site history

Applications at this address on the Moray register

This site has had 3 applications since 2022: 2 approved, 0 refused.

  • 26/01073/LBC Awaiting decision

    Hopeman Lodge Lodge Road Hopeman Elgin Moray IV30 5YA

    Listed Building Consent to alter and extend dwelling and add traditional lime harl at

    Submitted 24 Aug 2026 Heritage and listed buildings
  • 22/01577/APP Granted

    Hopeman Lodge Lodge Road Hopeman Elgin Moray IV30 5YA

    Amendment consent ref 16/00345/APP to alter and extend dwellinghouse at

    Decided 4 May 2023 Full applications

Timeline

Dates from the published record

  1. 26 Oct 2022

    Received by Moray

  2. 30 Nov 2022

    Validated

    Checked as complete and ready for consideration.

  3. 4 May 2023

    Decision issued: Permitted

  4. 11 Aug 2026

    Added to PlanIndex

Cases linked to this one on the register

1 later application on the register refers to this one:

  • 26/01073/LBC Awaiting decision

    Hopeman Lodge Lodge Road Hopeman Elgin Moray IV30 5YA

    Listed Building Consent to alter and extend dwelling and add traditional lime harl at

    Submitted 24 Aug 2026 Heritage and listed buildings
  • Application: 16/00306/LBC (Decided)
  • Application: 16/00345/APP (Decided)
  • Application: 22/01577/APP (Decided)
  • Application: 95/01475/LBC (Decided)
  • Application: 98/01276/OUT (Decided)
  • Application: 98/01277/OUT (Decided)
  • Application: 98/01278/OUT (Decided)
  • Application: 98/01279/FUL (Decided)

Who's behind it

Company information only, from the register and Companies House

Wittets Limited Agent, registered in Moray

Active · incorporated 1981 · Moray

81 applications on PlanIndex · 97% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

24 documents on file for this application

  • DECISION NOTICE - APPROVED Decision · 04 May 2023
  • REPORT OF HANDLING Decision · 04 May 2023
  • PROPOSED ELEVATIONS - APPROVED Amended Drawing · 02 May 2023
  • REPLACEMENT WINDOW SCHEDULE - APPROVED Drawing · 21 Apr 2023
  • EXISTING WINDOW SCHEDULE Drawing · 04 Apr 2023
  • PROPOSED LOWER GROUND FLOOR PLAN - APPROVED Amended Drawing · 22 Feb 2023
  • PROPOSED UPPER GROUND FLOOR PLAN - APPROVED Amended Drawing · 22 Feb 2023
  • PROPOSED SITE PLAN - APPROVED Amended Drawing · 22 Feb 2023
  • PROPOSED ROOF PLAN - APPROVED Amended Drawing · 22 Feb 2023
  • PROPOSED SECTION AA CC - APPROVED Amended Drawing · 22 Feb 2023
  • PROPOSED SECTION BB - APPROVED Amended Drawing · 22 Feb 2023
  • PROPOSED SITE LAYOUT - APPROVED Amended Drawing · 22 Feb 2023
  • EXISTING LOWER GROUND FLOOR PLAN Drawing · 26 Oct 2022
  • EXISTING UPPER GROUND FLOOR PLAN Drawing · 26 Oct 2022
  • EXISTING FIRST FLOOR PLAN Drawing · 26 Oct 2022
  • EXISTING ELEVATIONS Drawing · 26 Oct 2022
  • EXISTING ROOF PLAN Drawing · 26 Oct 2022
  • EXISTING SITE PLAN Drawing · 26 Oct 2022
  • EXISTING OUTBUILDINGS Drawing · 26 Oct 2022
  • EXISTING CROSS SECTIONS AA - CC Drawing · 26 Oct 2022
  • EXISTING CROSS SECTIONS BB - DD Drawing · 26 Oct 2022
  • PROPOSED OUTBUILDINGS - ELEVATIONS AND FLOOR PLANS - APPROVED Drawing · 26 Oct 2022
  • EXISTING OUTBUILDINGS ELEVATIONS Drawing · 26 Oct 2022
  • LOCATION PLAN - APPROVED Drawing · 26 Oct 2022

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Moray granted permission on 4 May 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Moray

  • 26/00747/LBC Granted

    8 Cothall Cottages Forres Moray IV36 2SQ

    Provide secondary glazing to windows at

    Received 12 Jun, published by the council 27 Jul 2026 Heritage and listed buildings
  • 26/00985/LBC Granted

    Mahanaim-balnagone 20 King Street Elgin Moray IV30 1EU

    Remove cement pointing and repoint with breathable lime mortar on north and west elevations at

    Received 6 Aug, published by the council 24 Aug 2026 Heritage and listed buildings
  • 26/00430/LBC Granted

    45 Findhorn Forres Moray IV36 3YF

    Addition of roof light replace existing windows slates and gutters and remove existing cement render and apply new lime harl render at

    Received 9 Apr, published by the council 27 Jul 2026 Heritage and listed buildings
  • 26/00906/LBC Granted

    11 Reidhaven Street Elgin Moray IV30 1QG

    Erect replacement sun lounge at

    Received 21 Jul, published by the council 16 Aug 2026 Heritage and listed buildings
  • 26/01182/LBC Awaiting decision

    5 Bank Lane Forres Moray IV36 1NU

    Repair chimney at

    Received 14 Sep, published by the council 30 Sep 2026 Heritage and listed buildings