Planning application
Land At Greens Of Rothes Rothes Moray
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Proposed 100,000 tonnes per annum malt producing facility on
As published by the council, reference 21/01901/EIA
Application record
- Reference
- 21/01901/EIA
- Type
- Environmental Impact Assessment
- Status
- Decided
- Decision
- Permitted
- Received
- 3 Dec 2021
- Validated
- 8 Dec 2021
- Decided
- 16 Feb 2023
- Ward
- Speyside Glenlivet
- Parish
- Speyside
- Decision by
- Committee - National/Major
Site history
Applications at this address on the Moray register
This site has had 5 applications since 2021: 2 approved, 0 refused.
-
23/02089/EIA Granted
Land At Greens Of Rothes Rothes Moray
Heat power and water connections between CoRDE Energy Centre and proposed new maltings and the installation of treated process water outfall on
-
21/01903/EIA Withdrawn
Land At Greens Of Rothes Rothes Moray
Install pipeline from proposed maltings with discharge point at River Spey (Option B) on
-
21/01902/EIA Withdrawn
Land At Greens Of Rothes Rothes Moray
Install pipeline from proposed maltings with discharge point at River Spey (Option A) on
-
21/01904/EIA Withdrawn
Land At Greens Of Rothes Rothes Moray
Heat and power connection between Rothes CoRDE and proposed maltings on
Timeline
Dates from the published record
-
3 Dec 2021
Received by Moray
-
8 Dec 2021
Validated
Checked as complete and ready for consideration.
-
16 Feb 2023
Decision issued: Permitted
-
24 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
37 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Moray granted permission on 16 February 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Land At Greens Of Rothes Rothes Moray
Heat and power connection between Rothes CoRDE and proposed maltings on
Withdrawn Outline -
Land At Greens Of Rothes Rothes Moray
Heat power and water connections between CoRDE Energy Centre and proposed new maltings and the installation of treated process water outfall on
Granted Outline 13 docs -
Burncrook Warehouses Station Street Rothes Aberlour Moray AB38 7AD
96% historically approved · decision due ~20 Oct
Hazardous substance consent on
Awaiting decision Other 16 docs -
Land To The East Of North Street Rothes Aberlour Moray
Proposed 60GWH low impact anaerobic digestion facility and associated development on
Decided Outline 2 docs -
Rothes Corde Ltd North Street Rothes Aberlour Moray AB38 7BW
Construct an energy centre comprising a single storey steel-framed metal-clad building containing heat exchangers and a back-up boiler associated external works include a biomass storage slab and a material storage slab at
Granted Full applications 10 docsSmall domestic -
Land At Greens Of Rothes Rothes Moray
Install pipeline from proposed maltings with discharge point at River Spey (Option B) on
Withdrawn Outline
Other outline applications
In Moray
-
26/01032/PPP Awaiting decision
Maryhill Farm Drybridge Buckie Moray AB56 5JB
Erect dwellinghouse and garage at
-
26/00988/SCN Decided
Sheriffmill Motor Co Ltd Sheriffmill Road Elgin Moray IV30 6UH
Demolish existing buildings and erect new multi-purpose van and truck services centre comprising Classes 4 and 5 formation of external parking area landscaping improved access SUDS and associated works at
-
26/00896/SCN Decided
Scottish Water Treatment Plant Moycroft Road Elgin Moray IV30 1XZ
Intallation of 719 no. photovoltaic ground based panels and 3 no. solar inverters on land at
-
26/00463/PPP Withdrawn
Moss Of Barmuckity Workshop Elgin Moray IV30 8QW
Erect 2no replacement dwellings and an additional single dwellinghouse at
-
26/00176/PPP Withdrawn
Land Opposite 8 Nelson Terrace Keith Moray
Erect 1no dwelling on