Skip to content
PlanIndex Get alerts
Menu

Planning application

Land At Greens Of Rothes Rothes Moray

Granted Moray 21/01901/EIA Environmental Impact Assessment

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Proposed 100,000 tonnes per annum malt producing facility on

As published by the council, reference 21/01901/EIA

Application record

Reference
21/01901/EIA
Type
Environmental Impact Assessment
Status
Decided
Decision
Permitted
Received
3 Dec 2021
Validated
8 Dec 2021
Decided
16 Feb 2023
Ward
Speyside Glenlivet
Parish
Speyside
Decision by
Committee - National/Major

Site history

Applications at this address on the Moray register

This site has had 5 applications since 2021: 2 approved, 0 refused.

  • 23/02089/EIA Granted

    Land At Greens Of Rothes Rothes Moray

    Heat power and water connections between CoRDE Energy Centre and proposed new maltings and the installation of treated process water outfall on

    Decided 18 Apr 2024 Outline
  • 21/01903/EIA Withdrawn

    Land At Greens Of Rothes Rothes Moray

    Install pipeline from proposed maltings with discharge point at River Spey (Option B) on

    Decided 22 Apr 2024 Outline
  • 21/01902/EIA Withdrawn

    Land At Greens Of Rothes Rothes Moray

    Install pipeline from proposed maltings with discharge point at River Spey (Option A) on

    Decided 22 Apr 2024 Outline
  • 21/01904/EIA Withdrawn

    Land At Greens Of Rothes Rothes Moray

    Heat and power connection between Rothes CoRDE and proposed maltings on

    Decided 22 Apr 2024 Outline

Timeline

Dates from the published record

  1. 3 Dec 2021

    Received by Moray

  2. 8 Dec 2021

    Validated

    Checked as complete and ready for consideration.

  3. 16 Feb 2023

    Decision issued: Permitted

  4. 24 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

37 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Moray granted permission on 16 February 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Moray

  • 26/01032/PPP Awaiting decision

    Maryhill Farm Drybridge Buckie Moray AB56 5JB

    Erect dwellinghouse and garage at

    14 Aug 2026 Outline
  • 26/00988/SCN Decided

    Sheriffmill Motor Co Ltd Sheriffmill Road Elgin Moray IV30 6UH

    Demolish existing buildings and erect new multi-purpose van and truck services centre comprising Classes 4 and 5 formation of external parking area landscaping improved access SUDS and associated works at

    6 Aug 2026 Outline
  • 26/00896/SCN Decided

    Scottish Water Treatment Plant Moycroft Road Elgin Moray IV30 1XZ

    Intallation of 719 no. photovoltaic ground based panels and 3 no. solar inverters on land at

    17 Jul 2026 Outline
  • 26/00463/PPP Withdrawn

    Moss Of Barmuckity Workshop Elgin Moray IV30 8QW

    Erect 2no replacement dwellings and an additional single dwellinghouse at

    15 Apr 2026 Outline
  • 26/00176/PPP Withdrawn

    Land Opposite 8 Nelson Terrace Keith Moray

    Erect 1no dwelling on

    10 Feb 2026 Outline