Planning application
Direct Laundry Ltd 3 - 5 Gordon Street Forres Moray IV36 1DY
Works: New dwelling Demolition Several homes
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Demolish existing disused laundry buildings and construct 2 townhouses and 6 flats with associated site works at
As published by the council, reference 20/00590/APP
Application record
- Reference
- 20/00590/APP
- Type
- Application for Planning Permission
- Status
- Decided
- Decision
- Granted As published: Permitted
- Received
- 12 May 2020
- Validated
- 12 May 2020
- Decided
- 19 Jan 2022
- Ward
- Forres
- Decision by
- Delegated Power
- Postcode
- IV36 1DY
Site history
Applications at this address on the Moray register
This site has had 3 applications since 2019: 2 approved, 0 refused.
-
20/00591/CON Granted
Direct Laundry Ltd 3 - 5 Gordon Street Forres Moray IV36 1DY
Demolish existing disused laundry building at
-
19/01379/APP Withdrawn
Direct Laundry Ltd 3 - 5 Gordon Street Forres Moray IV36 1DY
Demolish existing disused laundry buildings and construct 3 townhouses and 7 flats with associated site works.
Timeline
Dates from the published record
-
12 May 2020
Received by Moray
-
19 Jan 2022
Decision issued: Permitted
-
9 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Wittets Limited Agent, registered in Moray
Active · incorporated 1981 · Moray
81 applications on PlanIndex · 97% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
12 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Moray granted permission on 19 January 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Direct Laundry Ltd 3 - 5 Gordon Street Forres Moray IV36 1DY
Demolish existing disused laundry building at
Granted Heritage and listed buildings Demolition 7 docs -
Direct Laundry Ltd 3 - 5 Gordon Street Forres Moray IV36 1DY
Demolish existing disused laundry buildings and construct 3 townhouses and 7 flats with associated site works.
Withdrawn Full applications New dwelling DemolitionSeveral homes -
10 Burngreen Lane Forres Moray IV36 1WR
Replace two existing external doors with flood mitigation doors at
Granted Full applications 10 docs -
8 Burngreen Lane Forres Moray IV36 1WR
Replace two existing external doors with flood mitigation doors at
Granted Full applications 16 docs -
98 Dunedin Place North Road Forres Moray IV36 1AJ
Proposed extension to rear of property at
Granted Full applications Extension 6 docs -
6 Burngreen Lane Forres Moray IV36 1WR
Replace two existing external doors with flood mitigation doors at
Granted Full applications 15 docs
Other full applications
In Moray
-
26/00863/APP Granted
30 - 32 Mid Street Keith Moray
Internal alterations and extensions for two townhouses at
-
26/00898/APP Granted
4 Seafield Place Cullen Buckie Moray AB56 4TF
Erect single storey extension at
-
26/00868/APP Granted
The Breamou Inn 1 Cooper Street Hopeman Elgin Moray IV30 5SD
Alter and extend existing bar/restaurant at
-
26/00840/APP Granted
30 Crown Street Portgordon Buckie Moray AB56 5RD
Single storey rear extension including surface water soakaway at
-
26/00979/APP Granted
Delnabo Keepers Cottage Tomintoul Ballindalloch Moray AB37 9HT
Extend dwellinghouse at