Planning application
Blackhillock, Peterhead And Kintore Electricity Substation Keith Moray
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Upgrade 106km of existing 275kV overhead line between
As published by the council, reference 19/00244/S37
Application record
- Reference
- 19/00244/S37
- Type
- Section 37 SE Energy Consent Unit
- Status
- Permitted
- Decision
- Granted As published: Raise No Objections
- Received
- 7 Mar 2019
- Validated
- 14 Mar 2019
- Decided
- 22 May 2019
- Ward
- Keith And Cullen
- Decision by
- Answer to PE/ID or application
Timeline
Dates from the published record
-
7 Mar 2019
Received by Moray
-
14 Mar 2019
Validated
Checked as complete and ready for consideration.
-
22 May 2019
Decision issued: Raise No Objections
-
5 Oct 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
19 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Moray granted permission on 22 May 2019, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Moray's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
Land 480M North Of Blackhillock Electricity Substation Denwell Road Keith Moray
Install a synchronous compensator on
Withdrawn Full applications -
Blackhillock Sub-station Keith Moray
Installation of synchronous compensator with associated electrical bay equipment access landscaping and drainage on land at
Decided Outline 3 docs -
Land South Of Blackhillock Substation Keith Moray
Installation of a synchronous compensator and ancillary infrastructure on
Withdrawn Full applications -
Land South Of Blackhillock Substation Keith Moray
Installation of a synchronous compensator and ancillary infrastructure at
Decided Outline -
Blackhillock Electricity Substation Keith Moray
Install a battery energy storage system (BESS) with assocaited infrastucture at
Decided Outline