Skip to content
PlanIndex Get alerts
Menu

Planning application

DM/2026/00476

Lower House Farm Road From Dovecote Barn To A48 Llanfair Discoed Monmouthshire NP16 6LX

Withdrawn Monmouthshire Agric Notification

Proposal

Agricultural gateway going out from the yard at Lower House Farm. The passing place is already there and the gateway would be at the edge of this going directly out onto the existing road.

As published by the council, reference DM/2026/00476

Timeline

Dates from the published record

  1. 14 Apr 2026

    Received by Monmouthshire

  2. 23 Apr 2026

    Validated

    Checked as complete and ready for consideration.

  3. 10 Jul 2026

    Decision issued: Application Withdrawn

  4. 28 Jul 2026

    Added to PlanIndex

What withdrawal means

The process from here

The applicant withdrew this application before the council decided it, so it carries no planning weight and no fee refund is automatic. Withdrawal often follows officer feedback that a refusal was likely.

The applicant is free to submit a revised application at any time, and many withdrawn schemes return in amended form, so the site is worth watching if the proposal affected you.

About other applications

How this application type works

This application sits outside the common categories, which can include county matters such as minerals and waste, works by statutory undertakers, demolition notifications and other less frequent procedures. The council record linked below sets out the specific procedure that applies, and the description above is taken directly from the published register.

More on other applications in our guide

Nearby applications

Within 500 metres

  • DM/2026/00857 Awaiting decision

    Lower House Farm Road From Dovecote Barn To A48 Llanfair Discoed Monmouthshire NP16 6LX

    Agricultural gateway going out from the yard at Lower House Farm onto the single track road heading to the A48. Proposing putting a farm gateway and short track from the passing place up to the existing track that is already there out the back of the farmyard. The farm track would be in the field directly next to the main farm yard and single track road that heads out of Llanvair Discoed village back to the A48. The passing place is already there and the gateway would be at the edge of this going directly out onto the existing road.

    14 Jul 2026 15m away Other

In Monmouthshire

  • DM/2026/00909 Awaiting decision

    Ty Mawr Farm Bryngwyn Road Dingestow Monmouthshire NP25 4DZ

    The 180 acre landholding at Ty Mawr lies on the watershed between the Rivers Usk and Wye. We hope to add ponds and leaky dams to the land we manage, both to benefit biodiversity and to slow down flows into tributaries of those rivers: the Trothy and the Pontyrhydan Brook. The Ty Mawr fields are a mix of pasture and arable with very little ecological value. The pond proposals at Ty Mawr are designed to compliment those recently constructed on the adjacent Old Lands holding, which flow entirely into the Trothy, as well as establishing initial headwater hydrological control on part of the Pontyrhydan Brook. Ty Mawr is a Demonstration Farm for best practice regenerative farming, including Wildfarmed cereals and nutrient and livestock management with a strong focus on soil health. Ty Mawr holds knowledge exchange workshops for farmers, agronomists and other stakeholders and is therefore an excellent choice for demonstrating how Natural Flood Management can sit alongside arable management. There 7 small ponds, scrapes and leaky dams designed in conjunction with MCC.

    23 Jul 2026 Other
  • DM/2026/00899 Awaiting decision

    Troy View Craig-y-dorth Road Mitchel Troy Common Mitchel Troy Monmouthshire NP25 4RL

    Farm implement shed

    21 Jul 2026 Other
  • DM/2026/00869 Decided

    Ty Mawr Farm Bryngwyn Road Dingestow Monmouthshire NP25 4DZ

    The 180 acre landholding at Ty Mawr lies on the watershed between the Rivers Usk and Wye. We hope to add ponds and leaky dams to the land we manage, both to benefit biodiversity and to slow down flows into tributaries of those rivers: the Trothy and the Pontyrhydan Brook. The Ty Mawr fields are a mix of pasture and arable with very little ecological value. The pond proposals at Ty Mawr are designed to compliment those recently constructed on the adjacent Old Lands holding, which flow entirely into the Trothy, as well as establishing initial headwater hydrological control on part of the Pontyrhydan Brook. Ty Mawr is a Demonstration Farm for best practice regenerative farming, including Wildfarmed cereals and nutrient and livestock management with a strong focus on soil health. Ty Mawr holds knowledge exchange workshops for farmers, agronomists and other stakeholders and is therefore an excellent choice for demonstrating how Natural Flood Management can sit alongside arable management. There 7 small ponds, scrapes and leaky dams designed in conjunction with MCC. Why necessary for agriculture: To improve whole farm holistic management and enhance biodiversity and on going water management. Why designed for agriculture: To improve whole farm holistic management and enhance biodiversity and on going water management.

    16 Jul 2026 Other
  • DM/2026/00768 Decided

    Upper Court Farm King Road Penpergwm Monmouthshire NP7 9AS

    Proposed new general purpose agricultural and associated works.

    23 Jun 2026 Other
  • DM/2026/00887 Awaiting decision

    Land Adjacent To Wyastone Leys Fishery A40 Trunk Road From Hardwick Roundabout To Monmouth Monmouthshire

    Replacement general-purpose agricultural building and associated works.

    20 Jul 2026 Other