Skip to content
PlanIndex Get alerts
Menu

Planning application

DM/2025/01414

Land At Old Porth-Gwyn Abergavenny NP7 8PS

Decided Monmouthshire Agric Notification

Proposal

Proposed new agricultural building for the dry storage of machinery and hay.

As published by the council, reference DM/2025/01414

Timeline

Dates from the published record

  1. 5 Nov 2025

    Received by Monmouthshire

  2. 18 Nov 2025

    Decision issued: Acceptable

  3. 28 Jul 2026

    Added to PlanIndex

After the decision

The process from here

The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.

If permission was granted, work must normally begin within five years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.

About other applications

How this application type works

This application sits outside the common categories, which can include county matters such as minerals and waste, works by statutory undertakers, demolition notifications and other less frequent procedures. The council record linked below sets out the specific procedure that applies, and the description above is taken directly from the published register.

More on other applications in our guide

In Monmouthshire

  • DM/2026/00909 Awaiting decision

    Ty Mawr Farm Bryngwyn Road Dingestow Monmouthshire NP25 4DZ

    The 180 acre landholding at Ty Mawr lies on the watershed between the Rivers Usk and Wye. We hope to add ponds and leaky dams to the land we manage, both to benefit biodiversity and to slow down flows into tributaries of those rivers: the Trothy and the Pontyrhydan Brook. The Ty Mawr fields are a mix of pasture and arable with very little ecological value. The pond proposals at Ty Mawr are designed to compliment those recently constructed on the adjacent Old Lands holding, which flow entirely into the Trothy, as well as establishing initial headwater hydrological control on part of the Pontyrhydan Brook. Ty Mawr is a Demonstration Farm for best practice regenerative farming, including Wildfarmed cereals and nutrient and livestock management with a strong focus on soil health. Ty Mawr holds knowledge exchange workshops for farmers, agronomists and other stakeholders and is therefore an excellent choice for demonstrating how Natural Flood Management can sit alongside arable management. There 7 small ponds, scrapes and leaky dams designed in conjunction with MCC.

    23 Jul 2026 Other
  • DM/2026/00899 Awaiting decision

    Troy View Craig-y-dorth Road Mitchel Troy Common Mitchel Troy Monmouthshire NP25 4RL

    Farm implement shed

    21 Jul 2026 Other
  • DM/2026/00869 Decided

    Ty Mawr Farm Bryngwyn Road Dingestow Monmouthshire NP25 4DZ

    The 180 acre landholding at Ty Mawr lies on the watershed between the Rivers Usk and Wye. We hope to add ponds and leaky dams to the land we manage, both to benefit biodiversity and to slow down flows into tributaries of those rivers: the Trothy and the Pontyrhydan Brook. The Ty Mawr fields are a mix of pasture and arable with very little ecological value. The pond proposals at Ty Mawr are designed to compliment those recently constructed on the adjacent Old Lands holding, which flow entirely into the Trothy, as well as establishing initial headwater hydrological control on part of the Pontyrhydan Brook. Ty Mawr is a Demonstration Farm for best practice regenerative farming, including Wildfarmed cereals and nutrient and livestock management with a strong focus on soil health. Ty Mawr holds knowledge exchange workshops for farmers, agronomists and other stakeholders and is therefore an excellent choice for demonstrating how Natural Flood Management can sit alongside arable management. There 7 small ponds, scrapes and leaky dams designed in conjunction with MCC. Why necessary for agriculture: To improve whole farm holistic management and enhance biodiversity and on going water management. Why designed for agriculture: To improve whole farm holistic management and enhance biodiversity and on going water management.

    16 Jul 2026 Other
  • DM/2026/00768 Decided

    Upper Court Farm King Road Penpergwm Monmouthshire NP7 9AS

    Proposed new general purpose agricultural and associated works.

    23 Jun 2026 Other
  • DM/2026/00887 Awaiting decision

    Land Adjacent To Wyastone Leys Fishery A40 Trunk Road From Hardwick Roundabout To Monmouth Monmouthshire

    Replacement general-purpose agricultural building and associated works.

    20 Jul 2026 Other