Planning application
PLN/2025/1979
JAIPUR AND ORCHARD LOUNGE, 599 GRAFTON GATE, CENTRAL MILTON KEYNES, MILTON KEYNES, MK9 1AT
Proposal
Variation of condition 2 (approved plans) seeking to add 3x independent firefighting lifts required to function as evacuation lifts including provision of separate refuge waiting spaces, create separation of escape routes to both escape staircases with a door between both routes, create separation of final escape routes from escape stairs and lifts at ground floor, including imperforate barrier between the 2 routes, and to provide the escape corridors to both staircases, on floors above ground level, with independent mechanical smoke ventilation systems (relating to permission ref. 23/01634/FUL for Demolition of vacant 2-storey building (Class E) and the erection of a 33-storey building comprising commercial floorspace (Class E) on the ground floor and mezzanine level with residential units on upper floors comprising up to 302 dwellings and associated works. EIA development.)
As published by the council, reference PLN/2025/1979
Timeline
Dates from the published record
-
19 Sep 2025
Received by Milton Keynes
-
27 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Milton Keynes for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About amendments applications
How this application type works
An amendment application changes a permission that already exists. Non-material amendments cover small adjustments with no wider effect, while minor material amendments, usually made by varying a condition, allow modest design changes without a fresh application. Anything beyond that needs a new permission, so the scope here is deliberately narrow.
Nearby applications
Within 500 metres
-
PLN/2026/0555 Awaiting decision
BANK HOUSE, 171 MIDSUMMER BOULEVARD, CENTRAL MILTON KEYNES, MILTON KEYNES, MK9 1EB
The modification of a planning obligation under section 106 of the Town and Country Planning Act 1990 dated 2nd July 2024 and relating to permission ref. 23/00550/FUL, seeking to reduce the amount of affordable housing contribution due to viability
-
PLN/2025/2296 Awaiting decision
BANK HOUSE, 171 MIDSUMMER BOULEVARD, CENTRAL MILTON KEYNES, MILTON KEYNES, MK9 1EB
Variation of conditions 2 (approved plans), 5 (cycle storage), 6 (vehicle parking spaces) seeking to reduce two wheeler parking spaces from 18 to 10 and blue badge spaces from 11 to 4 with increase in car parking spaces from 27 to 34 (relating to permission ref. PLN/2025/0969 (Variation of conditions 2 (approved plans), 5 (cycle storage), 6 (vehicle parking spaces), and 13 (kerbs and edging appearance) seeking to reconfigure and increase the basement level plant space, redistribute cycle parking, reduce two wheeler parking spaces from 44 to 18, increase car parking spaces from 22 to 27, alterations to apartment sizes with 3 apartments increasing from 1 to 2 beds, 26 apartments from studios to 1 beds and alterations to the curtain wall façade of the south elevation (relating to permission ref. 23/00550/FUL (Redevelopment of Bank House (including demolition) of up to 20 storeys to provide a mixture of up to 355 residential (Use Class C3) units and flexible uses across ground and upper ground floors for retail and/or restaurant/cafe and/or office/co-working/flexible workspace (all Use Class E), with access, amenity/landscaping, car and cycle parking spaces and associated site works)
-
PLN/2026/0895 Refused
BANK HOUSE, 171 MIDSUMMER BOULEVARD, CENTRAL MILTON KEYNES, MILTON KEYNES, MK9 1EB
Approval of details required by condition 3 (Hard & Soft Landscaping) of permission ref. PLN/2025/0969
-
PLN/2026/1272 Awaiting decision
BANK HOUSE, 171 MIDSUMMER BOULEVARD, CENTRAL MILTON KEYNES, MILTON KEYNES, MK9 1EB
Approval of details required by condition 12 (Ecological Enhancement Plan) of permission ref. PLN/2025/0969
-
PLN/2026/1014 Granted
BANK HOUSE, 171 MIDSUMMER BOULEVARD, CENTRAL MILTON KEYNES, MILTON KEYNES, MK9 1EB
Approval of details required by condition 8 (Solar Panels and ASHP Details) of permission ref. 23/00550/FUL
-
PLN/2026/1312 Awaiting decision
SANTANDER HOUSE, 201 GRAFTON GATE, CENTRAL MILTON KEYNES, MILTON KEYNES, MK9 1AN
Approval of details required by conditions 10 (secure site compound, HGV route, communication), 13 (Habitat Management and Monitoring Plan (HMMP)) and 17 (site waste management plan (SWMP)) of permission ref. PLN/2025/0193
Other amendments applications
In Milton Keynes
-
PLN/2026/1549 Awaiting decision
STRATFORD HOUSE, MILL LANE, STONY STRATFORD, MILTON KEYNES, MK11 1BQ
Non-material amendment the seeking the installation of solar panels and photovoltaic system, the installation of Georgian style metal gates and external alterations to plots 9 and 12 (relating to permission ref. PLN/2025/2610 for [Variation of condition(s) 1 (Approved Plans), 2 (Materials), 3 (Stone & Brick details), Condition 4 (Window details), Condition 10 (adoptable estate roads), Condition 11 (road drainage), Condition 17 (surface water drainage), Condition 19 (floodplain scheme), 22 (Lighting Scheme) and Condition 28 (footpath) seeking to vary approved plans to make minor amendments to materials, fenestration, doors, chimneys, brick and stone details; access road surfaces and kerbing; and the lighting scheme (relating to permission ref. 16/02507/FUL, revision to planning permission 11/02761/FUL for the construction of 13 new houses on land to the rear of Stratford House))
-
PLN/2026/0782 Granted
MILTON KEYNES UNIVERSITY HOSPITAL, STANDING WAY, EAGLESTONE, MILTON KEYNES, MK6 5LD
Variation of condition(s) 1 (approved plans), 2 (external materials) and 3 (surface water drainage scheme) seeking to alter drawings relating to the amend materials specification and the size reduction of the SuDS tank (relating to permission ref. PLN/2025/1911 The erection of a surgical hub and ancillary office accommodation)
-
PLN/2026/1513 Awaiting decision
10 FILGRAVE, NEWPORT PAGNELL, MK16 9ET
Variation of condition 2 (approved plans) seeking to alter position of front door and window and amend rear windows (relating to permission ref. PLN/2025/2500 removal of existing side garage and erection of a 2 storey side extension and new side lean-to workshop, adjustments to front and rear doors and windows and addition of a new roof light)
-
PLN/2026/1506 Awaiting decision
2 ST LEGER COURT, GREAT LINFORD, MILTON KEYNES, MK14 5HA
Non-material amendment seeking the omission of the landlord area, increase in size to unit 2, amendments to shopfront glazing, service yard doors and relocation of bollards (relating to permission ref. PLN/2025/1019 for the Subdivision of existing ground floor retail unit to create 2no retail units (Class E) with associated works)
-
PLN/2026/1510 Awaiting decision
Milton Keynes East, Land East and West of A509 London Road, Newport Pagnell, MK16 0JA
Non-material amendment seeking to amend the description within each parameter plan’s key of the ‘detailed area’ (relating to permission ref. PLN/2024/2745 for Variation of condition 19 (Strategic Highway Infrastructure) seeking to increase the number of homes that can be occupied prior to completion of strategic highway infrastructure from 250 to 500 (relating to permission ref. 21/00999/OUTEIS for Hybrid planning application encompassing: (i) outline element (with all matters reserved) for a large-scale mixed-use urban extension (creating a new community) comprising: residential development; employment including business, general industry and storage/distribution uses; a secondary school and primary schools; a community hub containing a range of commercial and community uses; a new linear park along the River Ouzel corridor; open space and linked amenities; new redways, access roads and associated highways improvements; associated infrastructure works; demolition of existing structures and (ii) detailed element for strategic highway and multi-modal transport infrastructure, including: new road and redway extensions; a new bridge over the M1 motorway; a new bridge over the River Ouzel; works to the Tongwell Street corridor between Tongwell roundabout and Pineham roundabout including new bridge over the River Ouzel; alignment alterations to A509 and Newport Road; and associated utilities, earthworks and drainage works)