Planning application
3 Lasswade Road Dalkeith EH22 3DZ
Works: Extension Loft or dormer Windows or glazing
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Installation of replacement existing windows and rooflights; formation of dormer window and balcony; alterations and extension to roof; installation of rooflights and door opening; repainting of rainwater goods and associated works
As published by the council, reference 26/00311/DPP
Application record
- Reference
- 26/00311/DPP
- Type
- Detailed Planning Permission
- Status
- Awaiting decision
- Received
- 5 Jun 2026
- Validated
- 23 Jun 2026
- Ward
- Midlothian East
- Parish
- Eskbank & Newbattle Community Council
- Postcode
- EH22 3DZ
Timeline
Dates from the published record
-
5 Jun 2026
Received by Midlothian
-
23 Jun 2026
Validated
Checked as complete and ready for consideration.
-
27 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 18 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Midlothian took a median of 59 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Eskbank Design Studio Ltd Agent, a design practice registered in Dalkeith
Active · incorporated 2014 · Dalkeith
32 applications on PlanIndex · across 3 councils · 100% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
28 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Midlothian for determination, against a statutory target of eight weeks. Over the last year Midlothian decided full applications in a median of 67 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
9 Lasswade Road Dalkeith EH22 3DZ
Pruning of tree within Eskbank & Ironmills conservation area
Granted Trees 5 docs -
Eskbank Toll Roundabout Eskbank Dalkeith
Display of 4 non-illuminated roundabout sponsorship signs
Granted Advertising 15 docs -
6D Station Road Dalkeith EH22 3EU
Installation of secondary glazing
Granted Heritage and listed buildings Windows or glazing 19 docs -
7 Station Road Dalkeith EH22 3EU
Alterations to existing window and door opening to form patio doors
Refused Heritage and listed buildings Windows or glazing 16 docs -
7 Station Road Dalkeith EH22 3EU
Alterations to existing window and door opening to form patio doors
Refused Full applications Windows or glazing 15 docs -
7 Station Road Dalkeith EH22 3EU
Alterations to existing window and door opening to form patio doors (retrospective)
Granted Full applications Windows or glazing 21 docs
Other full applications
In Midlothian
-
26/00260/DPP Granted
29 Main Street Pathhead EH37 5PZ
Erection of garage and workshop
-
26/00457/DPP Granted
35 Whitehouse Way Gorebridge EH23 4FP
Erection of outbuilding (Retrospective)
-
26/00380/DPP Granted
St Margarets 23 Lauder Road Dalkeith EH22 2JY
Formation of driveway and access to classified road
-
26/00417/DPP Granted
19 Croft Street Dalkeith EH22 3BA
Extension to flatted dwelling
-
26/00439/DPP Granted
5 Robert Smith Place Dalkeith EH22 1JF
Installation of replacement conservatory roof