Planning application
34 Main Street Bellaghy BT45 8HT
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Certificate of Lawfulness for a Proposed Use or Development in accordance with Section 170 of the Planning Act (Northern Ireland) 2011 to establish the lawful commencement of planning permission H/2010/0470/F (by way of works associated in the course of the erection of 5no. dwellings including pouring of foundations of a dwelling) prior to the expiration of 13 January 2016 to allow future completion at a subsequent date
As published by the council, reference LA09/2026/0901/LDP
Application record
- Reference
- LA09/2026/0901/LDP
- Type
- LD Certificate Proposed
- Status
- Awaiting decision
- Received
- 1 Sep 2026
- Validated
- 1 Sep 2026
- Ward
- Bellaghy
- Parish
- Moyola
- Decision by
- Other - PAD, PAN, CLUD, NMC, DETEIA
- Postcode
- BT45 8HT
Timeline
Dates from the published record
-
1 Sep 2026
Received by Mid Ulster
-
1 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 27 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Mid Ulster took a median of 104 days over the applications it decided in the last year.
What happens while it is decided
This application is with Mid Ulster for determination, against a statutory target of eight weeks. Over the last year Mid Ulster decided lawful development applications in a median of 90 days. More in our guide to how long planning decisions take.
About lawful development applications
A lawful development certificate is a legal determination that existing or proposed works do not need planning permission; the merits of the scheme are not considered. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Land 100M South Of Church Of Ireland Oldtown Road Bellaghy Magherafelt BT45 8HT.
Proposed new housing development with 33 new dwellings compromising of 1 No. detached, 12 No. semi detached (22 units) and 2 No. Terraces (10 units).
Granted Amendments New dwelling 12 docsMajor scheme -
Lands at and to The South of No 32 Main Street and Lands at and to The West of No. 15 Castle Street Bellaghy
100% historically approved · decision due ~5 Mar
Proposed mixed-use development comprising 14no. residential units (12no. semi-detached, 1no. detached and 1no. first floor apartment) and 1no. ground floor retail unit, private amenity space, landscaping, parking, access onto Main Street, access onto Castle Street and all ancillary site works
Awaiting decision Full applications 49 docs -
9-11 Main Street Bellaghy
Discharge of conditions 9 and 10 of planning reference LA09/2018/1060/F
Granted Conditions 8 docs -
Land between No 2 and 3 William Street Bellaghy
100% historically approved · decision due ~18 Sep
Alteration of existing access for future development land, demolition of No. 1 William Street, and removal of timber fence and existing wall
Awaiting decision Full applications Demolition 10 docsSmall domestic -
27 Castle Street Bellaghy Londonderry BT45 8LA
Request to discharge Condition 5 - LA09/2024/0966/F
Granted Conditions 13 docs -
12 Ballyscullion Road Bellaghy BT45 8LD
Alterations and 2 storey rear extension to existing dwelling
Granted Full applications Extension 9 docsDomestic
Other lawful development applications
In Mid Ulster
-
LA09/2026/1055/LDE Awaiting decision
Lands opposite 19 Ballynagilly Lane, Dunmore, Cookstown, County Tyrone, Bt80 9Su. The Application Relates to The Small Freestanding Shed immediately West of The existing Stone Farm Building.
Erection of the existing small freestanding agricultural shed used in connection with the working farm for the storage of animal feed, buckets, lambing equipment and other farming implements, with an internal water supply for farm activities. The shed is situated immediately west of the existing stone farm building on lands opposite 19 Ballynagilly Lane, Dunmore, Cookstown, County Tyrone, BT80 9SU, and is identified at Point B on drawing CLUD-A-001. It was erected and substantially completed in August 2021. This application seeks a Certificate of Lawfulness for the erection of the existing shed. Its agricultural use is described to explain the building's function.
-
LA09/2026/0571/LDP Decided
8 Rectory Road Tobermore Magherafelt BT455QW
The installation and commissioning of a 6.05 kWp roof-mounted solar PV. The works include mounting 10 No. solar panels onto an existing agricultural shed roof, installing a 3.68kW hybrid inverter, and an Eddi power diverter (allows excess PV to be used for hot water heating), complete with all associated electrical connections as per the current IET Wiring Regulations, metering, and scaffolding
-
LA09/2026/1000/LDP Awaiting decision
48 Drumenny Road Ballinderry Cookstown BT80 0BY
Machinery storage shed
-
LA09/2026/0972/LDP Awaiting decision
95 Killymeal Road Dungannon BT71 6LG
Lawful commencement of full planning permission LA09/2021/1551/F (by way of the laying of block work atop foundation in the course of the erection of the dwelling) to allow future completion at a subsequent date.
-
LA09/2026/0973/LDP Awaiting decision
89 Killymeal Road Dungannon BT71 6LG
Lawful commencement of full planning permission LA09/2021/1550/F (by way of the laying of block work atop foundation in the course of the erection of the dwelling) to allow future completion at a subsequent date.