Planning application
21 Manor Lodge Magherafelt BT45 6QL
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Proposed works include single storey extensions to the existing dwelling which will provide wheelchair accessible downstairs bedroom with en-suite facilities and open plan Kitchen / living area. This will provide access for and improve the health, safety and comfort of a joint owner / resident of the property, Mrs Janine Stewart, who is a disabled person.
As published by the council, reference LA09/2026/0863/LDP
Application record
- Reference
- LA09/2026/0863/LDP
- Type
- LD Certificate Proposed
- Status
- Awaiting decision
- Received
- 19 Aug 2026
- Validated
- 26 Aug 2026
- Ward
- Town Parks East
- Parish
- Magherafelt
- Decision by
- Other - PAD, PAN, CLUD, NMC, DETEIA
- Postcode
- BT45 6QL
Site history
Applications at this address on the Mid Ulster register
This site has had 3 applications since 2026.
-
LA09/2026/0894/F Awaiting decision
21 Manor Lodge Magherafelt BT45 6QL
Retention of extension of existing domestic curtilage and retention of new retaining wall
-
LA09/2026/0877/F Awaiting decision
21 Manor Lodge Magherafelt BT45 6QL
Construction of a new retaining wall (retrospective) within the curtilage of the existing dwelling
Timeline
Dates from the published record
-
19 Aug 2026
Received by Mid Ulster
-
26 Aug 2026
Validated
Checked as complete and ready for consideration.
-
26 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 21 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Mid Ulster took a median of 104 days over the applications it decided in the last year.
What happens while it is decided
This application is with Mid Ulster for determination, against a statutory target of eight weeks. Over the last year Mid Ulster decided lawful development applications in a median of 90 days. More in our guide to how long planning decisions take.
About lawful development applications
A lawful development certificate is a legal determination that existing or proposed works do not need planning permission; the merits of the scheme are not considered. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
21 Manor Lodge Magherafelt BT45 6QL
100% historically approved · decision due ~28 Oct
Retention of extension of existing domestic curtilage and retention of new retaining wall
Awaiting decision Full applications Extension 6 docs -
21 Manor Lodge Magherafelt BT45 6QL
100% historically approved · decision due ~19 Oct
Construction of a new retaining wall (retrospective) within the curtilage of the existing dwelling
Awaiting decision Full applicationsDomestic -
5 Manor Downs Magherafelt BT45 6QQ
Change of use from domestic dwelling to HMO
Granted Full applications 14 docsDomestic -
2 Manor Park Magherafelt BT45 6QE
Single storey extension to rear of dwelling
Decided Full applications Extension 10 docsSmall domestic -
St Pius X College 59 Moneymore Road Magherafelt BT45 6HQ
Proposed single story extension to main school building to create a single hygiene room.
Granted Full applications Extension 10 docs -
Land To The SE Of 1 Parklane Killyfaddy Road Magherafelt
Proposed residential development comprising of 6 No. detached chalet bungalows with associated siteworks, landscaping, car parking, driveways, and garages. Change of house type of sites 37 to 42, as approved under extant planning permission LA09/2018/0945/F. Proposal includes general amendments to PSD (Private Streets Determination) and revised location of pedestrian crossing point to main access road connecting with Meadowbank Road.
Granted Full applications New dwelling 38 docs
Other lawful development applications
In Mid Ulster
-
LA09/2026/1055/LDE Awaiting decision
Lands opposite 19 Ballynagilly Lane, Dunmore, Cookstown, County Tyrone, Bt80 9Su. The Application Relates to The Small Freestanding Shed immediately West of The existing Stone Farm Building.
Erection of the existing small freestanding agricultural shed used in connection with the working farm for the storage of animal feed, buckets, lambing equipment and other farming implements, with an internal water supply for farm activities. The shed is situated immediately west of the existing stone farm building on lands opposite 19 Ballynagilly Lane, Dunmore, Cookstown, County Tyrone, BT80 9SU, and is identified at Point B on drawing CLUD-A-001. It was erected and substantially completed in August 2021. This application seeks a Certificate of Lawfulness for the erection of the existing shed. Its agricultural use is described to explain the building's function.
-
LA09/2026/0571/LDP Decided
8 Rectory Road Tobermore Magherafelt BT455QW
The installation and commissioning of a 6.05 kWp roof-mounted solar PV. The works include mounting 10 No. solar panels onto an existing agricultural shed roof, installing a 3.68kW hybrid inverter, and an Eddi power diverter (allows excess PV to be used for hot water heating), complete with all associated electrical connections as per the current IET Wiring Regulations, metering, and scaffolding
-
LA09/2026/1000/LDP Awaiting decision
48 Drumenny Road Ballinderry Cookstown BT80 0BY
Machinery storage shed
-
LA09/2026/0972/LDP Awaiting decision
95 Killymeal Road Dungannon BT71 6LG
Lawful commencement of full planning permission LA09/2021/1551/F (by way of the laying of block work atop foundation in the course of the erection of the dwelling) to allow future completion at a subsequent date.
-
LA09/2026/0973/LDP Awaiting decision
89 Killymeal Road Dungannon BT71 6LG
Lawful commencement of full planning permission LA09/2021/1550/F (by way of the laying of block work atop foundation in the course of the erection of the dwelling) to allow future completion at a subsequent date.