Skip to content
PlanIndex Get alerts
Menu

Planning application

21 Manor Lodge Magherafelt BT45 6QL

Awaiting decision Mid Ulster LA09/2026/0863/LDP LD Certificate Proposed

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Proposed works include single storey extensions to the existing dwelling which will provide wheelchair accessible downstairs bedroom with en-suite facilities and open plan Kitchen / living area. This will provide access for and improve the health, safety and comfort of a joint owner / resident of the property, Mrs Janine Stewart, who is a disabled person.

As published by the council, reference LA09/2026/0863/LDP

Application record

Reference
LA09/2026/0863/LDP
Type
LD Certificate Proposed
Status
Awaiting decision
Received
19 Aug 2026
Validated
26 Aug 2026
Ward
Town Parks East
Parish
Magherafelt
Decision by
Other - PAD, PAN, CLUD, NMC, DETEIA
Postcode
BT45 6QL

Site history

Applications at this address on the Mid Ulster register

This site has had 3 applications since 2026.

  • LA09/2026/0894/F Awaiting decision

    21 Manor Lodge Magherafelt BT45 6QL

    Retention of extension of existing domestic curtilage and retention of new retaining wall

    Submitted 27 Aug 2026 Full applications
  • LA09/2026/0877/F Awaiting decision

    21 Manor Lodge Magherafelt BT45 6QL

    Construction of a new retaining wall (retrospective) within the curtilage of the existing dwelling

    Submitted 24 Aug 2026 Full applications

Timeline

Dates from the published record

  1. 19 Aug 2026

    Received by Mid Ulster

  2. 26 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 26 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 21 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Mid Ulster took a median of 104 days over the applications it decided in the last year.

What happens while it is decided

This application is with Mid Ulster for determination, against a statutory target of eight weeks. Over the last year Mid Ulster decided lawful development applications in a median of 90 days. More in our guide to how long planning decisions take.

About lawful development applications

A lawful development certificate is a legal determination that existing or proposed works do not need planning permission; the merits of the scheme are not considered. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 21 Manor Lodge Magherafelt BT45 6QL

    LA09/2026/0894/F Submitted 27 Aug 2026 50 yards away

    100% historically approved · decision due ~28 Oct

    Retention of extension of existing domestic curtilage and retention of new retaining wall

    Awaiting decision Full applications Extension 6 docs
  • 21 Manor Lodge Magherafelt BT45 6QL

    LA09/2026/0877/F Submitted 24 Aug 2026 50 yards away

    100% historically approved · decision due ~19 Oct

    Construction of a new retaining wall (retrospective) within the curtilage of the existing dwelling

    Awaiting decision Full applications
    Domestic
  • 5 Manor Downs Magherafelt BT45 6QQ

    LA09/2023/0173/F Submitted 15 Feb 2023 200 yards away

    Change of use from domestic dwelling to HMO

    Granted Full applications 14 docs
    Domestic
  • 2 Manor Park Magherafelt BT45 6QE

    LA09/2026/0615/F Submitted 11 Jun 2026 300 yards away

    Single storey extension to rear of dwelling

    Decided Full applications Extension 10 docs
    Small domestic
  • St Pius X College 59 Moneymore Road Magherafelt BT45 6HQ

    LA09/2024/1183/F Submitted 7 Oct 2024 0.2 miles away

    Proposed single story extension to main school building to create a single hygiene room.

    Granted Full applications Extension 10 docs
  • Land To The SE Of 1 Parklane Killyfaddy Road Magherafelt

    LA09/2022/1594/F Submitted 9 Nov 2022 0.3 miles away

    Proposed residential development comprising of 6 No. detached chalet bungalows with associated siteworks, landscaping, car parking, driveways, and garages. Change of house type of sites 37 to 42, as approved under extant planning permission LA09/2018/0945/F. Proposal includes general amendments to PSD (Private Streets Determination) and revised location of pedestrian crossing point to main access road connecting with Meadowbank Road.

    Granted Full applications New dwelling 38 docs

In Mid Ulster

  • LA09/2026/1055/LDE Awaiting decision

    Lands opposite 19 Ballynagilly Lane, Dunmore, Cookstown, County Tyrone, Bt80 9Su. The Application Relates to The Small Freestanding Shed immediately West of The existing Stone Farm Building.

    Erection of the existing small freestanding agricultural shed used in connection with the working farm for the storage of animal feed, buckets, lambing equipment and other farming implements, with an internal water supply for farm activities. The shed is situated immediately west of the existing stone farm building on lands opposite 19 Ballynagilly Lane, Dunmore, Cookstown, County Tyrone, BT80 9SU, and is identified at Point B on drawing CLUD-A-001. It was erected and substantially completed in August 2021. This application seeks a Certificate of Lawfulness for the erection of the existing shed. Its agricultural use is described to explain the building's function.

    Received 13 Oct, published by the council 14 Oct 2026 Lawful development
  • 8 Rectory Road Tobermore Magherafelt BT455QW

    The installation and commissioning of a 6.05 kWp roof-mounted solar PV. The works include mounting 10 No. solar panels onto an existing agricultural shed roof, installing a 3.68kW hybrid inverter, and an Eddi power diverter (allows excess PV to be used for hot water heating), complete with all associated electrical connections as per the current IET Wiring Regulations, metering, and scaffolding

    Received 1 Jun, published by the council 29 Jul 2026 Lawful development
  • LA09/2026/1000/LDP Awaiting decision

    48 Drumenny Road Ballinderry Cookstown BT80 0BY

    Machinery storage shed

    Received 29 Sep, published by the council 1 Oct 2026 Lawful development
  • LA09/2026/0972/LDP Awaiting decision

    95 Killymeal Road Dungannon BT71 6LG

    Lawful commencement of full planning permission LA09/2021/1551/F (by way of the laying of block work atop foundation in the course of the erection of the dwelling) to allow future completion at a subsequent date.

    Received 18 Sep, published by the council 21 Sep 2026 Lawful development
  • LA09/2026/0973/LDP Awaiting decision

    89 Killymeal Road Dungannon BT71 6LG

    Lawful commencement of full planning permission LA09/2021/1550/F (by way of the laying of block work atop foundation in the course of the erection of the dwelling) to allow future completion at a subsequent date.

    Received 18 Sep, published by the council 21 Sep 2026 Lawful development