Planning application

Moy Regional Primary School 12 Dungannon Rd Moy Dungannon

Awaiting decision Mid Ulster LA09/2026/0125/F Full

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Erection of a prefabricated modular building on site for educational purposes

As published by the council, reference LA09/2026/0125/F

Application record

Reference
LA09/2026/0125/F
Type
Full
Status
Awaiting decision
Received
10 Feb 2026
Validated
11 Feb 2026
Ward
Moy
Parish
Dungannon
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 10 Feb 2026

    Received by Mid Ulster

  2. 11 Feb 2026

    Validated

    Checked as complete and ready for consideration.

  3. 29 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 8 April 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Mid Ulster took a median of 106 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

  • GPR SURVEY Site Layout or Block Plan · 21 Jul 2026
  • NORTHERN IRELAND WATER DEVELOPER SERVICES Consultee Comment · 10 Apr 2026
  • STANDARD CONSULTATION LETTER Consultation Request · 24 Mar 2026
  • STANDARD NN LETTER (BULK) Neighbour Notification Letter · 27 Feb 2026
  • ACKNOWLEDGE APP AND FEE RECEIPT Acknowledgement · 11 Feb 2026
  • SITE LOCATION PLAN 01 Site Location Plan · 10 Feb 2026
  • PROPOSED MODULAR ACCOMMODATION 04 Proposed Plans · 10 Feb 2026
  • PROPOSED ELEVATIONS 03 Proposed Elevations · 10 Feb 2026
  • APPLICATION FORM Application Form · 10 Feb 2026
  • SITE LAYOUT 02 Site Layout or Block Plan · 10 Feb 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Mid Ulster for determination, against a statutory target of eight weeks. Over the last year Mid Ulster decided full applications in a median of 115 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 18 Hillside Crescent Moy BT71 7SS

    LA09/2026/0754/F Submitted 24 Jul 2026 200 yards away

    100% historically approved · decision due ~21 Sep

    Extension to dwelling

    Awaiting decision Full applications Extension 5 docs
    Domestic
  • Site to rear of 30 Jockey Lane Moy BT71 7SR

    LA09/2025/1115/LDP Submitted 24 Oct 2025 300 yards away

    2 No detached 1.5 storey houses and domestic garages

    Granted Lawful development 4 docs
  • 25B Dungannon Street Moy

    LA09/2025/1177/F Submitted 12 Nov 2025 300 yards away

    100% historically approved · decision due ~7 Jan

    Change of Use from former funeral home to a 2 Bedroom Apartment

    Awaiting decision Full applications 27 docs
  • Lands Immediately North Of 7 Chestnut Drive Dungannon Road Moy BT71 7TB

    LA09/2020/1656/F Submitted 21 Dec 2020 350 yards away

    Site for a detached single storey dwelling.

    Granted Full applications 24 docs
    Small domestic
  • 21 Clover Hill Moy

    LA09/2026/0694/F Submitted 3 Jul 2026 350 yards away

    100% historically approved · decision due ~31 Aug

    The proposed works are to add a 10.4 sq/m extension to the kitchen and provide a 10.6 sq/m outside office extension to the garage, along with net zero works with a roof mounted solar panel array and ground mounted ASHP to replace the exiting oil fired heating system.

    Awaiting decision Full applications Extension 10 docs
  • Site 60 At Roxborough Manor Moy

    LA09/2022/1682/F Submitted 28 Nov 2022 350 yards away

    Revised house type to include a rear sunroom

    Granted Full applications 10 docs

In Mid Ulster

  • Reid Engineering Ltd Kilcronagh Industrial Estate Cookstown BT80 9HG

    Proposed relocation of existing entrance at Kilcronagh Industrial Estate, Cookstown, BT80 9H

    Received 31 Jul, published by the council 7 Aug 2026 Full applications
  • LA09/2026/1126/F Awaiting decision

    49 Church Street Cookstown BT80 8HT

    Retention of single storey rear replacement extension with internal alterations to dwelling

    4 Nov 2026 Full applications
  • 2 Lisnamuck Road Tobermore BT45 5QF

    Production facility shed for the manufacture of decorative paving and walling products

    Received 9 May, published by the council 7 Aug 2026 Full applications
  • Dwelling Known As 80 Aghafad Road (by Applicant) 77 Aghafad Road (postal Address On Maps) Pomeroy BT70 2TR

    Extension and alterations to dwelling

    Received 17 Jul, published by the council 29 Jul 2026 Full applications
  • Lands approximately 80M South of 39 Castle Road Cookstown Tyrone BT80 8TN

    3 No. Glamping Pods, Parking, Landscaping and Associated Site Works

    Received 11 Sep, published by the council 29 Jul 2026 Full applications