Proposal
Extension to accommodate disabled facilities
As published by the council, reference LA09/2026/0025/F
Timeline
Dates from the published record
-
13 Jan 2026
Received by Mid Ulster
-
14 Jan 2026
Validated
Checked as complete and ready for consideration.
-
18 Feb 2026
Decision issued: Permission Granted
-
29 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
LA09/2025/1005/F Awaiting decision
Lands to The South East of Cove Close and Ashleigh Park, Ballyronan, Magherafelt,
Change of house type at plots 16,17 and 18. Removal of plot 27 with Repositioning of plots 25 and 26 including associated boundaries to previously approved and commenced planning application LA09/2021/1435/F.
-
LA09/2025/0986/F Awaiting decision
108 Shore Road Ballyronan Magherafelt Londonderry BT45 6JG
Replacement dwelling with detached carport/home gym/office
-
LA09/2025/1109/LDP Withdrawn
30M West of Ballyronan Marina Centre 135A Shore Road Ballyronan Magherafelt BT45 6JA
Refurbish the existing steel units. This will involve removing existing wooden floors, installing insulation and replacing the flooring with a non-slip surface. We will renew toilets, shower cubicles as required. We will replace current lighting with efficient led lighting and install additional electrical sockets. The existing gas boiler will be serviced and repaired as necessary. The external walls will be repaired and repainted as needed. This work is all part of the conditions of our recent lease agreement with MUDC.
-
LA09/2025/1162/F Awaiting decision
30 Ballyneill Road Ballyronan Magherafelt
Nursery/day care facilities and change of use from dwelling to after school facilities
Other full applications applications
In Mid Ulster
-
LA09/2026/0757/F Awaiting decision
95 Annaghmakeown Road Dungannon BT70 3DD
Front & rear single storey extensions including associated alterations and raised patio area to front
-
LA09/2026/0755/F Awaiting decision
Between Nos 60 and 62 Carricknakielt Road Maghera
Infill dwelling and garage
-
LA09/2026/0753/F Awaiting decision
Land adjacent and North of 76 Aughrim Road Magherafelt
Expansion of existing rural business to provide 3no. light industrial units with associated parking
-
LA09/2026/0754/F Awaiting decision
18 Hillside Crescent Moy BT71 7SS
Extension to dwelling
-
LA09/2026/0625/F Granted
103A Dunnamore Road Cookstown
Amended access from previously approved under LA09/2023/0003/F, to use existing access and lane